By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
India Times NowIndia Times NowIndia Times Now
Notification Show More
Font ResizerAa
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
    • Technology
    • Entertainment
    • The Escapist
    • Insider
    • Finance ₹
    • India News
    • Science
    • Health
Reading: India’s green transition is missing long-duration energy storage
Share
India Times NowIndia Times Now
Font ResizerAa
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
Search
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
    • Technology
    • Entertainment
    • The Escapist
    • Insider
    • Finance ₹
    • India News
    • Science
    • Health
Have an existing account? Sign In
Follow US

Home » India’s green transition is missing long-duration energy storage

India News

India’s green transition is missing long-duration energy storage

India Times Now Desk
Last updated: July 26, 2026 11:55 am
India Times Now Desk
Published: July 26, 2026
Share
SHARE


A pumped hydroelectric storage power plant in Tasmania. The plant stores electricity by pumping water uphill when power is abundant. Later, the water flows downhill through turbines, generating electricity during periods of high demand.

A pumped hydroelectric storage power plant in Tasmania. The plant stores electricity by pumping water uphill when power is abundant. Later, the water flows downhill through turbines, generating electricity during periods of high demand.
| Photo Credit: Getty Images

On May 21, India recorded its highest peak demand of 270.8 gigawatt (GW) during the day, an increase of approximately 90 GW from the same window in 2019. While power generators often meet India’s summer peak, the demand again increases at night, especially due to the use of air conditioners. This underscores the need for longer-term energy storage to ensure the grid remains reliable during prolonged periods of low solar and wind generation.

India’s current energy storage roadmap only offers a partial solution. The 2026 Long-Term National Resource Adequacy Plan envisages 80 GW of battery energy storage and 94 GW of pumped hydroelectric energy storage (PHES) by FY2035-36. This translates to average discharge durations of roughly 4 and 6 hours, respectively.

Published – July 21, 2026 09:00 am IST



Source link

Guntur railway station subway to remain closed till June 30 for seepage mitigation works
Amazon CEO meets PM Modi; announces plans to invest additional $13 billion in India on cloud, AI
Prove ‘poaching’ charge or face ₹100 crore defamation suit: BJP to Omar Abdullah
Yelagiri Hills witness forest fire, two hectares of forest land destroyed
SSC public exams marks memo now available for download in school logins
Share This Article
Facebook Email Print
Leave a Comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Follow US

Find US on Social Medias
FacebookLike
XFollow
YoutubeSubscribe
TelegramFollow

Weekly Newsletter

Subscribe to our newsletter to get our newest articles instantly!
[mc4wp_form]
Popular News

Chain snatching accused arrested within 24 hours in Cyberabad

India Times Now Desk
India Times Now Desk
February 3, 2026
NISAR earth observation satellite enters final science operations phase
DMK urges Centre to hand over Anaimangalam copper plates to Tamil Nadu
Special Aadhaar biometric update camps begin across Visakhapatnam district
Kerala local body polls: JD(S), RJD to have a say in LDF prospects
- Advertisement -
Ad imageAd image
Global Coronavirus Cases

Confirmed

0

Death

0

More Information:Covid-19 Statistics
© INDIA TIMES NOW 2026 . All Rights Reserved.
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?