By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
India Times NowIndia Times NowIndia Times Now
Notification Show More
Font ResizerAa
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
    • Technology
    • Entertainment
    • The Escapist
    • Insider
    • Finance ₹
    • India News
    • Science
    • Health
Reading: Battered stretches at hairpin curves of Agumbe Ghat to be repaired soon
Share
India Times NowIndia Times Now
Font ResizerAa
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
Search
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
    • Technology
    • Entertainment
    • The Escapist
    • Insider
    • Finance ₹
    • India News
    • Science
    • Health
Have an existing account? Sign In
Follow US

Home » Battered stretches at hairpin curves of Agumbe Ghat to be repaired soon

India News

Battered stretches at hairpin curves of Agumbe Ghat to be repaired soon

India Times Now Desk
Last updated: January 4, 2026 6:40 am
India Times Now Desk
Published: January 4, 2026
Share
SHARE


The worn out road surface at hairpin curves of Agumbe Ghat will be restored soon, says the National Highways Division of the Public Works Department, which has also installed convex mirrors at these curves to enhance safety on Friday, January 2, in Agumbe Ghat, Karnataka.

The worn out road surface at hairpin curves of Agumbe Ghat will be restored soon, says the National Highways Division of the Public Works Department, which has also installed convex mirrors at these curves to enhance safety on Friday, January 2, in Agumbe Ghat, Karnataka.
| Photo Credit: Anil Kumar Sastry

Hundreds of road users who had been upset with the battered road condition at the hairpin curves of Agumbe Ghat can heave a sigh of relief as the National Highways Division of the Karnataka Public Works Department will soon undertake restoration of the affected stretches.

“Annual maintenance works have already started from Hebri towards Agumbe while affected stretches of Malpe-Tirthahalli NH 169A till about Someshwara have been fixed,” a senior NH-PWD engineer told The Hindu on Saturday (January 3, 2026). Battered stretches on Agumbe Ghat would be fixed in about a week, he added.

Agumbe Ghat has been a crucial link between Udupi and Shivamogga/ Chikkamagaluru districts. Over the years, vehicular traffic, particularly the number of private cars have increased manifolds with tourists visiting natural and religious attractions in these districts, including Sringeri, Horanadu etc.

Stretches worn out

Bitumen surface had worn out at majority of the 14 hairpin curves along the about 10 km Ghat stretch, even as potholes and craters were formed during the prolonged Monsoon in 2025. Besides making navigation difficult for drivers, the battered stretches had also been causing traffic pileups because of the slow movement of vehicles.

The engineer said that though tenders were called soon after the Monsoon, the same were rejected on technical grounds. It took time to finalise fresh tenders and commence the annual maintenance works. The chosen contractor, besides fixing damaged stretches, would also maintain the highway for one year, he added.

Convex mirrors

The recently installed convex mirrors at all the hairpin bends appear to have helped drivers to ensure smooth negotiation of curves, the engineer said. Those driving down from Agumbe were able to take prior caution after watching approaching vehicles from Someshwara and give them way, he said.

Convex mirrors, to some extent, were able to address the blind curves at the hairpin bends, the engineer added.

Published – January 04, 2026 12:10 pm IST



Source link

SJM writes to U.S. envoy over Indian seafarers’ killing, seeks probe, compensation
University Grants Commission has declared Global Human Peace University as fake.
CM promised to implement recommendations of J.B. Koshy Commission: Kerala Region Latin Catholic Council
Karnataka to invest ₹1 crore on training guides, auto and taxi drivers to enhance tourism
Second Sudanese national isolated at Gandhi Hospital in Hyderabad after developing fever, samples sent for Ebola testing
TAGGED:Agumbe Ghat road repairkarnataka highway maintainanceNH 169A road workUdipi to Chikkamagaluru
Share This Article
Facebook Email Print
Leave a Comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Follow US

Find US on Social Medias
FacebookLike
XFollow
YoutubeSubscribe
TelegramFollow

Weekly Newsletter

Subscribe to our newsletter to get our newest articles instantly!
[mc4wp_form]
Popular News

Alleged murder of 12-year-old migrant boy in Bengaluru sparks demand for child rights commission probe

India Times Now Desk
India Times Now Desk
June 20, 2026
Techie murdered for asking back loan, body buried inside house in Andhra Pradesh
AI and IoT are game changers, says UAS Dharwad V-C Patil
Supreme Court stays arrest of Abhishek Banerjee’s aide Sumit Roy in Salboni land-grabbing case
Kevin Warsh has homed in on three key phrases. How Fed watchers interpret them
- Advertisement -
Ad imageAd image
Global Coronavirus Cases

Confirmed

0

Death

0

More Information:Covid-19 Statistics
© INDIA TIMES NOW 2026 . All Rights Reserved.
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?