By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
India Times NowIndia Times NowIndia Times Now
Notification Show More
Font ResizerAa
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
    • Technology
    • Entertainment
    • The Escapist
    • Insider
    • Finance ₹
    • India News
    • Science
    • Health
Reading: State Highways begins second phase of widening of Tiruvannamalai – Avalurpet Main Road
Share
India Times NowIndia Times Now
Font ResizerAa
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
Search
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
    • Technology
    • Entertainment
    • The Escapist
    • Insider
    • Finance ₹
    • India News
    • Science
    • Health
Have an existing account? Sign In
Follow US

Home » State Highways begins second phase of widening of Tiruvannamalai – Avalurpet Main Road

India News

State Highways begins second phase of widening of Tiruvannamalai – Avalurpet Main Road

India Times Now Desk
Last updated: December 22, 2025 12:00 am
India Times Now Desk
Published: December 22, 2025
Share
SHARE


Minister for Public Works E.V. Velu laid the foundation stone for the second phase, accompanied by Collector K. Tharpagaraj, M. Murali, Superintending Engineer, and P. Gnanavel, Divisional Engineer, State Highways, Tiruvannamalai.

Minister for Public Works E.V. Velu laid the foundation stone for the second phase, accompanied by Collector K. Tharpagaraj, M. Murali, Superintending Engineer, and P. Gnanavel, Divisional Engineer, State Highways, Tiruvannamalai.
| Photo Credit: Special Arrangement

The State Highways Department has commenced the second phase of widening the existing two-lane Tiruvannamalai–Avalurpet Main Road (SH-130B) into a four-lane stretch to prevent accidents on the key arterial route.

Officials said the ongoing Phase I covers a 1.3-km stretch near the temple town, at a cost of ₹18 crore. The work includes the construction of six culverts, stormwater drains, LED streetlights, and a median with safety features such as reflectors, signage, and blinkers. “The first phase will be completed by January, while the second phase is scheduled for completion by March 2026. Once widened, the road will provide the shortest route for devotees travelling from Tiruvannamalai to Kancheepuram, Tindivanam, and Chennai,” K. Anbarasu, Assistant Executive Engineer, State Highways, told The Hindu.

Recently, Minister for Public Works E.V. Velu laid the foundation stone for the second phase, accompanied by Collector K. Tharpagaraj, M. Murali, Superintending Engineer, and P. Gnanavel, Divisional Engineer, State Highways, Tiruvannamalai. “The widened stretch will help prevent accidents, especially at night, as many tourist vans and buses ply on this pilgrim route,” said K. Sethu, a motorist.

Funded under the Chief Minister’s Road Development Plan (CMRDP) 2024–25, the second phase will be taken up at a cost of ₹64 crore. The work involves widening the road to 20 metres (60 feet), with a concrete median, stormwater drains, reflectors, and signage.

As part of the project, 15 culverts and a minor bridge will be constructed. Of the total 16 km stretch, widening in two phases will cover 9.3 km, where adequate government land is available on both sides. Much of the work falls within Chetpet, Cheyyar, and Vandavasi towns, which are closer to Kancheepuram district.

As the road serves as a key pilgrim route to Tirupati, Puducherry, Kancheepuram, and Melmaruvathur, additional bus bays will be created to facilitate halts for town and mofussil buses catering to local commuters and long-distance travellers.

Currently, over one lakh vehicles—mostly from Karnataka and Andhra Pradesh—use the stretch daily to travel to southern districts. To compensate for the removal of 360 trees and enhance green cover, about 4,000 saplings of native species will be planted along both sides of the road.

Published – December 22, 2025 05:30 am IST



Source link

CM to lay foundation stone for Munneru-Palair Link Canal, various other development works in Khammam district on January 18
Depression in the Bay may bring isolated heavy rainfall to North Andhra Pradesh
Licensed surveyors stage demonstration in Mysuru
Owaisi submits representation to CEO on Telangana SIR
“Shiv Sena (UBT) protests against Mahayuti govt aid package for farmers, calls it “misleading”
TAGGED:highjway road widening tntiruvannamalai tn newstiruvannamali highway roadtn minister velu
Share This Article
Facebook Email Print
Leave a Comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Follow US

Find US on Social Medias
FacebookLike
XFollow
YoutubeSubscribe
TelegramFollow

Weekly Newsletter

Subscribe to our newsletter to get our newest articles instantly!
[mc4wp_form]
Popular News

Ramakrishna Raju condemns ‘cut out tongue’ threat against Pawan Kalyan

India Times Now Desk
India Times Now Desk
June 3, 2026
Ayyappa devotees meet Bandi Sanjay, seek Centre’s intervention to safeguard Sabarimala temple from ‘misadministration’
Trade bodies say Budget powers MSMEs, provides boost to domestic manufacturing and further simplifies doing business
Tumakuru man’s death in police custody to be probed by CID: Home Minister
Tamil Nadu Hotels Association to hold B2B expo in October
- Advertisement -
Ad imageAd image
Global Coronavirus Cases

Confirmed

0

Death

0

More Information:Covid-19 Statistics
© INDIA TIMES NOW 2026 . All Rights Reserved.
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?