By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
India Times NowIndia Times NowIndia Times Now
Notification Show More
Font ResizerAa
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
    • Technology
    • Entertainment
    • The Escapist
    • Insider
    • Finance ₹
    • India News
    • Science
    • Health
Reading: Mumbai-Ahmedabad Bullet Train nears reality: 330 km viaduct ready, 2027 inaugural run almost here – Details
Share
India Times NowIndia Times Now
Font ResizerAa
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
Search
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
    • Technology
    • Entertainment
    • The Escapist
    • Insider
    • Finance ₹
    • India News
    • Science
    • Health
Have an existing account? Sign In
Follow US

Home » Mumbai-Ahmedabad Bullet Train nears reality: 330 km viaduct ready, 2027 inaugural run almost here – Details

BusinessStartup

Mumbai-Ahmedabad Bullet Train nears reality: 330 km viaduct ready, 2027 inaugural run almost here – Details

Times Desk
Last updated: December 10, 2025 10:50 am
Times Desk
Published: December 10, 2025
Share
SHARE


The construction work on 17 river bridges has been completed, along with 11 steel bridges across key crossings featured in the project.

Mumbai:

In what marks a significant stride in India’s first bullet train project, major works on the Mumbai-Ahmedabad High-Speed Rail Bullet Train project have been completed. As per the latest update shared by the Ministry of Railways, the project has undergone significant progress. According to the update, a total of 330 kilometres of viaduct work has already been completed along with the 508 km high-speed rail corridor. Additionally, 406 kilometres of pier construction showcase a steady advancement in the project’s core civil infrastructure.

Inaugural 100-km run between Surat and Vapi

In an announcement, Minister of Railways Ashwini Vaishnaw said that the mega project is slated to kick off its inaugural 100-km run between Surat and Vapi in August 2027, The New Indian Express reported.

The construction work on 17 river bridges has been completed, along with 11 steel bridges across key crossings featured in the project. When it comes to the electrification work, a total of 3,500 Overhead Equipment (OHE) masts have been installed.

4.5 lakh noise barriers installed along the alignment

The project is being planned with appropriate security measures in mind. It is bolstered by the completion of work on almost 250 kilometres of reinforced concrete track bed laying. To manage noise along with safety, almost 4.5 lakh noise barriers have been installed along the alignment.

Vaishnaw said, “A significant milestone is that the bullet train will cover the distance between Ahmedabad and Mumbai in just 1 hour 58 minutes upon the completion of the high-speed rail corridor. The inaugural run in August 2027 will cover 100 km between Surat and Vapi.” 

 
The inaugural run will take place on the Surat-Vapi section, which is a part of the 508-km Mumbai-Ahmedabad bullet train project. The project is likely to be fully operational by 2029.

Once the project is completed, the travel time between Mumbai and Ahmedabad will drop to 1 hour and 58 minutes. 

The Mumbai–Ahmedabad trip, which will have four stoppages, will take 1 hour 58 minutes to cover the total distance. In case it makes stoppages at all 12 stations, the journey will extend to 2 hours 17 minutes.





Source link

India Post’s premium express deliver ’24 Speed Post’ promises next-day guaranteed delivery: Full details
9 Amrit Bharat Express trains to link east with north, south and west, full details here
Bloodbath on Dalal Street: Sensex tanks 2,496 points, Nifty falls 775.65 points to 23,002
Big relief for credit card users as RBI’s new rule provides 3 days of grace period on bill payment: Details
Government removes excise duty on ethanol-blended petrol ranging up to 30%, will your fuel expenses drop? | Business
TAGGED:bulletbullet traindetailsinauguralMumbai Ahmedabad bullet trainMumbaiAhmedabadnearsreadyrealityruntrainviaduct
Share This Article
Facebook Email Print
Leave a Comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Follow US

Find US on Social Medias
FacebookLike
XFollow
YoutubeSubscribe
TelegramFollow

Weekly Newsletter

Subscribe to our newsletter to get our newest articles instantly!
[mc4wp_form]
Popular News

After death of two basketball players, Haryana CM orders review of sports complexes

Times Desk
Times Desk
November 27, 2025
Sonam Wangchuk case: SC asks Centre to consider sharing detention grounds with activist’s wife, Govt says her plea was to create ‘emotive atmosphere’
GI tag sought for Sirumugai Menpattu Pudavaigal
Border 2: Sunny Deol, Varun Dhawan, Diljit Dosanjh’s film breaks Dhurandhar’s record even before release
What is there to talk, asks Amit Shah; advises Maoists to accept ‘lucrative surrender-rehabilitation policy’
- Advertisement -
Ad imageAd image
Global Coronavirus Cases

Confirmed

0

Death

0

More Information:Covid-19 Statistics
© INDIA TIMES NOW 2026 . All Rights Reserved.
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?