By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
India Times NowIndia Times NowIndia Times Now
Notification Show More
Font ResizerAa
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
    • Technology
    • Entertainment
    • The Escapist
    • Insider
    • Finance ₹
    • India News
    • Science
    • Health
Reading: Minister opens memorial pillar for Mordhana dam in Vellore for completion of 25 years
Share
India Times NowIndia Times Now
Font ResizerAa
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
Search
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
    • Technology
    • Entertainment
    • The Escapist
    • Insider
    • Finance ₹
    • India News
    • Science
    • Health
Have an existing account? Sign In
Follow US

Home » Minister opens memorial pillar for Mordhana dam in Vellore for completion of 25 years

India News

Minister opens memorial pillar for Mordhana dam in Vellore for completion of 25 years

India Times Now Desk
Last updated: February 7, 2026 6:52 pm
India Times Now Desk
Published: February 7, 2026
Share
SHARE


Minister for Water Resources and Katpadi MLA Duraimurgan inaugurated a 25-ft high memorial pillar at Mordhana Dam.

Minister for Water Resources and Katpadi MLA Duraimurgan inaugurated a 25-ft high memorial pillar at Mordhana Dam.

T.N. Minister for Water Resources and Katpadi MLA Duraimurgan on Saturday inaugurated a 25-ft high memorial pillar at Mordhana dam, which was built across the Koundinya river, a tributary of the Palar, in Gudiyatham town in Vellore to commemorate 25 years of the existence of the dam that helped to irrigate 8, 367 acres of farmland in the region.

Officials of the Water Resources Department (WRD), which maintains the dam, said that the foundation stone was laid more than three decades ago in December, 1990. when Mr. Duraimurugan was the Minister for Public Works and Forests. A decade later, the dam was inaugurated by former Chief Minister M. Karunanidhi in September 2000. “The dam reached its full storage capacity of 261.3 mcft for the tenth time during the 2025 monsoon. The dam also witnessed restoration works during that period,” V. Kalipriyan, Assistant Engineer (AE), WRD (Gudiyatham), told The Hindu.

Accompanied by Collector V.R. Subbulaxmi and Vellore MP D.M. Kathir Anand, Mr. Duraimurugan inspected the canal, protection wall and bund area. “Water from the dam is a lifeline for irrigation and domestic use. It helps to cultivate crops for at least three seasons a year,” said G. Ramu, a farmer.WRD officials said that the restored left canal of the dam runs 31.84 kms distance, covering at least 19 villages with around 1,710.92 hectares of farmland.

The left canal, which is three metres wide, covers a large tract of land under cultivation. Water from the Koundinya river directly irrigates around 140 acres. Another 220 acres in the region are irrigated through water from the left canal of the dam alone. WRD officials said that under the Rehabilitation and Restoration of Lakes scheme 2024-25, the left canal of the dam was taken up for restoration where deposited silt on the canal bed was removed to a depth of three metres to ensure steady water flow on it. Growth of thick vegetation especially on bund and slope of the bund was also removed.

WRD officials said that restoration of the key canal of the dam has helped for storage of excess rainwater in the dam to its full capacity during the 2025 monsoon since 2021 massive floods in the region. Excess water from the dam also overflows to 19 irrigation tanks on the downstream of the river, thereby providing adequate water for farmers in the area for cultivation. On the occasion, S. Pavalakannan, Superintending Engineer (SE), WRD, R. Venkatesh, Executive Engineer (EE), WRD, P. Gopi, Assistant Executive Engineer (AEE), WRD, and S. Ramkumar, AE (WRD) were present.

Published – February 08, 2026 12:22 am IST



Source link

‘Savukku’ Shankar seeks discharge from case on tweets against Palaniswami, Panneerselvam
Principal Scientific Advisor’s white paper says open access to AI infra key in India
Allahabad High Court stays proceedings against Triple Talaq accused
Jantar Mantar protest LIVE: Wangchuk taken to hospital; Dipke stopped from returning to protest site, says CJP
J&K police file case over ‘dissemination of secessionist video’
Share This Article
Facebook Email Print
Leave a Comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Follow US

Find US on Social Medias
FacebookLike
XFollow
YoutubeSubscribe
TelegramFollow

Weekly Newsletter

Subscribe to our newsletter to get our newest articles instantly!
[mc4wp_form]
Popular News

SIT investigation will reveal truth behind ‘fraud’ in electoral revision, says MLC

India Times Now Desk
India Times Now Desk
September 21, 2025
Karnataka takes cautious first step to introduce digital evaluation of SSLC and II PU examination
Karnataka opens power transmission sector for private companies through BOOT model
Students are architects of India’s future: Rohit Ramesh
I&B Ministry sets up panel to boost film industry
- Advertisement -
Ad imageAd image
Global Coronavirus Cases

Confirmed

0

Death

0

More Information:Covid-19 Statistics
© INDIA TIMES NOW 2026 . All Rights Reserved.
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?