By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
India Times NowIndia Times NowIndia Times Now
Notification Show More
Font ResizerAa
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
    • Technology
    • Entertainment
    • The Escapist
    • Insider
    • Finance ₹
    • India News
    • Science
    • Health
Reading: First Vande Bharat sleeper coach maintenance facility to be ready by June
Share
India Times NowIndia Times Now
Font ResizerAa
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
Search
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
    • Technology
    • Entertainment
    • The Escapist
    • Insider
    • Finance ₹
    • India News
    • Science
    • Health
Have an existing account? Sign In
Follow US

Home » First Vande Bharat sleeper coach maintenance facility to be ready by June

India News

First Vande Bharat sleeper coach maintenance facility to be ready by June

India Times Now Desk
Last updated: November 8, 2025 6:29 am
India Times Now Desk
Published: November 8, 2025
Share
SHARE


A file image of a Vande Bharat Train.

A file image of a Vande Bharat Train.
| Photo Credit: The Hindu

The country’s first Vande Bharat train sleeper coach maintenance facility will be ready by mid-2026 at Jodhpur in Rajasthan, according to a senior North Western Railway official.

North Western Railway’s Senior Divisional Mechanical Engineer Major Amit Swamy said the state-of-the-art facility at Bhagat Ki Kothi Railway station is being constructed at a cost of ₹360 crore.

The first phase of the maintenance and workshop depot, which includes a 600-metre track facility to maintain 24 sleeper coaches of Vande Bharat trains, will be ready by June, 2026.

The second phase, with a 178-metre track, including a workshop and simulator facility, will be completed by June, 2027, he told reporters.

The facility will also house a dedicated wheel rack system and a specialised testing laboratory, including latest simulators for training and evaluating high-tech equipment, highlighting Indian Railways’ focus on precision, safety and performance, he said.

The first phase will cost ₹167 crore and the second phase ₹195 crore, he said. The project is being executed by the North Western Railway with Railway Vikas Nigam Limited and Kinet Railway Solution, a joint venture between Russia and India, as technology partners.

This facility will maintain only the sleeper coaches of Vande Bharat, which are being introduced shortly, Mr. Swamy said, adding that the project includes a three-tier inspection facility for Vande Bharat coaches.

“The depot will be capable of inspecting and maintaining three trains at the same time. The workshop in the depot will have advanced machinery for lifting entire train rakes, transferring bogies using a drop pit table, and wheel-turning systems that will ensure uninterrupted maintenance of the Vande Bharat trains,” he said.

Four more such facilities are being established at Bijwasan railway station (Delhi), Thanisandra railway station (Bengaluru), Anand Vihar (Delhi) and Wadi Bandar (Mumbai).

Mr. Swamy said that the facility in Jodhpur will have the capacity for maintenance of eight to nine trains daily.

Vande Bharat coaches will have to be brought for maintenance at any of these facilities after four days or after travelling 3,500 km, he said.

Published – November 08, 2025 11:59 am IST



Source link

IndiGo flights begin to depart from Chennai airport, but spate of cancellations continues
ASHAs appeal to President to intervene to settle their agitation
Traffic police arrest 495 motorists for drunk driving over weekend in tri-commissionerate limits
Sabarimala gold theft case: SIT detains TDB official Murari Babu for questioning
Rangoli competition held to spread road safety awareness in Adilabad
TAGGED:First sleeper coach maintenanceRajasthanVande BharatVande Bharat maintenance facilityVande Bharat sleeper coach maintenance
Share This Article
Facebook Email Print
Leave a Comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Follow US

Find US on Social Medias
FacebookLike
XFollow
YoutubeSubscribe
TelegramFollow

Weekly Newsletter

Subscribe to our newsletter to get our newest articles instantly!
[mc4wp_form]
Popular News

HC orders Bachchu Kadu to vacate protest site; CM urges dialogue over disruption

India Times Now Desk
India Times Now Desk
October 30, 2025
Montha intensifies into Severe Cyclonic Storm; IMD issues red alert for coasts of Andhra, Odisha
Raat Akeli Hai: The Bansal Murders ending explained: What the final reveal really means
Conclave in November to showcase ‘evolution’ of Indian science
Joint military exercise of 13 nations begins in Meghalaya, focus on counter-terrorism operations
- Advertisement -
Ad imageAd image
Global Coronavirus Cases

Confirmed

0

Death

0

More Information:Covid-19 Statistics
© INDIA TIMES NOW 2026 . All Rights Reserved.
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?