By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
India Times NowIndia Times NowIndia Times Now
Notification Show More
Font ResizerAa
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
    • Technology
    • Entertainment
    • The Escapist
    • Insider
    • Finance ₹
    • India News
    • Science
    • Health
Reading: CM, Irrigation Minister to launch aerial electro-magnetic survey for SLBC tunnel
Share
India Times NowIndia Times Now
Font ResizerAa
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
Search
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
    • Technology
    • Entertainment
    • The Escapist
    • Insider
    • Finance ₹
    • India News
    • Science
    • Health
Have an existing account? Sign In
Follow US

Home » CM, Irrigation Minister to launch aerial electro-magnetic survey for SLBC tunnel

India News

CM, Irrigation Minister to launch aerial electro-magnetic survey for SLBC tunnel

India Times Now Desk
Last updated: November 2, 2025 3:32 pm
India Times Now Desk
Published: November 2, 2025
Share
SHARE


HYDERABAD

Chief Minister A. Revanth Reddy and Irrigation Minister N. Uttam Kumar Reddy will launch a helicopter-borne ‘VTEM Plus Magnetic Geophysical Survey’ on November 3 (Monday) to aid in the assessment of any shear zones or water bodies in the balance alignment of the Alimineti Madhava Reddy Project (AMRP).

The Telangana government has decided to employ this advanced technical methodology to expedite the tunnel works, following the collapse of Tunnel 1, part of the Srisailam Left Bank Canal (SLBC) under the AMRP, on February 22, which resulted in the deaths of eight people and flooding of 2.5 km of the tunnel, burying the 130-meter-long Tunnel Bore Machine (TBM) under muck and water.

Several tunnel experts also recommended conducting a helicopter-borne survey, which will be carried out by the National Geophysical Research Institute (NGRI).

According to irrigation officials, the survey involves flying a helicopter with a specialist underslung transmitter (24-meter diameter loop) over the tunnel alignment, sending electromagnetic signals into the earth to create eddies, which are then reflected and registered on a smaller receiver loop, covering over 200 km. This survey will enable suitable adaptation of excavation methodology to ensure safe and sustainable progress.

Published – November 02, 2025 09:02 pm IST



Source link

ADGP Amalraj returns as Tambaram Police Commissioner
Daughter, father arrested for religious conversion in U.P.; nine booked
Jabalpur cruise boat tragedy: Search operations expanded to trace four missing passengers
Telangana Waqf Board seeks 6-month extension for institution registrations
Many PDP leaders detained for bid to protest seeking insurance for hail-hit apple orchards in Kashmir
Share This Article
Facebook Email Print
Leave a Comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Follow US

Find US on Social Medias
FacebookLike
XFollow
YoutubeSubscribe
TelegramFollow

Weekly Newsletter

Subscribe to our newsletter to get our newest articles instantly!
[mc4wp_form]
Popular News

Family of three, including child, murdered in Taramani; bodies dumped in different places

India Times Now Desk
India Times Now Desk
January 28, 2026
Chief Secretary administers oath to info Commissioners
THINQ-25: Jaipur school wins national title
18 people arrested in Assam’s Karbi Anglong for murdering couple over witchcraft suspicion
‘Investment in education and healthcare is one of the most significant contributors to upholding human rights’
- Advertisement -
Ad imageAd image
Global Coronavirus Cases

Confirmed

0

Death

0

More Information:Covid-19 Statistics
© INDIA TIMES NOW 2026 . All Rights Reserved.
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?