By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
India Times NowIndia Times NowIndia Times Now
Notification Show More
Font ResizerAa
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
    • Technology
    • Entertainment
    • The Escapist
    • Insider
    • Finance ₹
    • India News
    • Science
    • Health
Reading: 3A notification for eight-lane Kochi Bypass to be reissued in August
Share
India Times NowIndia Times Now
Font ResizerAa
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
Search
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
    • Technology
    • Entertainment
    • The Escapist
    • Insider
    • Finance ₹
    • India News
    • Science
    • Health
Have an existing account? Sign In
Follow US

Home » 3A notification for eight-lane Kochi Bypass to be reissued in August

India News

3A notification for eight-lane Kochi Bypass to be reissued in August

India Times Now Desk
Last updated: July 18, 2026 3:06 pm
India Times Now Desk
Published: July 18, 2026
Share
SHARE


The proposed Kochi Bypass is expected to considerably decongest the NH 66 Bypass and the Edappally-Angamaly stretch of NH 544

The proposed Kochi Bypass is expected to considerably decongest the NH 66 Bypass and the Edappally-Angamaly stretch of NH 544
| Photo Credit: file photo

A month after the Centre accorded sanction for the 50-km-long, eight-lane Kochi Bypass project linking Angamaly and Aroor, the 3A notification to commence the land acquisition process is set to be reissued in August.

The 3A notification issued in 2024 for the 44-km-long, six-lane NH linking Angamaly and Netoor had expired for want of follow-up action.

“The 3A notification will, in all probability, be reissued in August. The stakeholders concerned are currently awaiting clarity on the width of the proposed 50-km corridor linking Aroor on NH 66 and Angamaly on NH 544,” said senior officials associated with the project.

The width of the six-lane corridor initially mooted had been fixed at 45 metres. This was later revised to 70 metres following the Centre’s decision to build an eight-lane NH.

“With the Kochi Bypass set to extend beyond Netoor and terminate near Aroor, land will have to be acquired from two more villages, Kumbalam and Aroor. This will increase the number of villages through which the greenfield corridor passes from 18 to 20. The alignment will more or less remain the same, except for the additional width required to build two more lanes and the nearly 6-km extension southwards to Aroor,” the officials said.

The impending 3A notification will be followed by the laying of boundary stones, public hearings on the grievances of landowners, and a field survey, all of which are expected to be completed by the end of the year, it is learnt.

Hoping that the proposed Kochi Bypass would considerably decongest the NH 66 Bypass and the Edappally-Angamaly NH 544 stretch, Hibi Eden, MP, said that the extended alignment would, in all probability, end on the northern side of the Aroor bridge [at Madavana Junction]. “A new bridge might be needed to seamlessly merge the proposed NH with the NH Bypass and with the 13-km Aroor-Thuravoor elevated highway. On his part, Chief Minister V.D. Satheesan said at a recent MPs’ conference that a dedicated survey team would be deployed to speed up land acquisition for the proposed corridor,” he added.

Unconfirmed reports said that necessary land would be acquired to further widen the proposed eight-lane corridor to one having 10 lanes.

Published – July 18, 2026 08:36 pm IST



Source link

EAM Jaishankar meets Qatar’s top leadership, discusses bilateral ties, global issues
Kisan Mazdoor Morcha demands compensation for flood-hit farmers, holds protest in Punjab
Atal-Modi Suparipaalana Yatra in A.P. from December 11
Entry to Kambathrayan Giri temple restricted on Purattasi Saturdays over recent forest fire
Rajasthan Chief Minister Bhajan Lal Sharma firms up his grip
Share This Article
Facebook Email Print
Leave a Comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Follow US

Find US on Social Medias
FacebookLike
XFollow
YoutubeSubscribe
TelegramFollow

Weekly Newsletter

Subscribe to our newsletter to get our newest articles instantly!
[mc4wp_form]
Popular News

Udhayanidhi to open restored Kamaraj memorial in Ranipet

India Times Now Desk
India Times Now Desk
November 2, 2025
RPF seize 21 kg ganja at Jolarpet railway station
Gold pulls back after touching a high of Rs 1,55,465 on MCX, silver drops 1% amid rise in oil prices
How Tamil Nadu’s healthcare leads by example
Bondada Engineering bags ₹392 cr contract from NTPC Green Energy
- Advertisement -
Ad imageAd image
Global Coronavirus Cases

Confirmed

0

Death

0

More Information:Covid-19 Statistics
© INDIA TIMES NOW 2026 . All Rights Reserved.
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?