By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
India Times NowIndia Times NowIndia Times Now
Notification Show More
Font ResizerAa
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
    • Technology
    • Entertainment
    • The Escapist
    • Insider
    • Finance ₹
    • India News
    • Science
    • Health
Reading: Overloading, violation of SOPs have made Kashmir’s Gondola cable car vulnerable to technical snags
Share
India Times NowIndia Times Now
Font ResizerAa
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
Search
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
    • Technology
    • Entertainment
    • The Escapist
    • Insider
    • Finance ₹
    • India News
    • Science
    • Health
Have an existing account? Sign In
Follow US

Home » Overloading, violation of SOPs have made Kashmir’s Gondola cable car vulnerable to technical snags

India News

Overloading, violation of SOPs have made Kashmir’s Gondola cable car vulnerable to technical snags

India Times Now Desk
Last updated: June 1, 2026 6:17 pm
India Times Now Desk
Published: June 1, 2026
Share
SHARE


CRPF personnel stand guard as tourists use the Gondola, the highest cable car project, in Gulmarg, 55 kms from Srinagar. File picture

CRPF personnel stand guard as tourists use the Gondola, the highest cable car project, in Gulmarg, 55 kms from Srinagar. File picture
| Photo Credit: Imran Nissar

Overloading, extending ride hours and violating Standard Operating Procedures (SOPs) made Asia’s highest cable car, Gondola, vulnerable to frequent faults in Baramulla’s tourist hotspot, Gulmarg. The cable car saw a major six-hour-long fault, leaving 300 tourists stuck mid-air in cabins on May 25.

Against the approved upper limit of 4000 persons taking the ride for the first phase in a day, the J&K Cable Car Corporation, which runs the gondola, has started allowing 7,000 to 8000 tourists to take the ride this year, officials said. The second phase, which has a carrying capacity of 1500 persons with 33 cabins only, had started carrying 3000 tourists on a ride. 

Also Read | Post Pahalgam attack, Gondola rides in Gulmarg plummet

On May 25, around 3000 tourists had taken a ride for the first phase up to 1 p.m., when it developed a snag. Another batch of almost 3000 could not take the joy ride because of the exigency, which saw cabins dangling in mid-air and rescuers using ropes and ladders to bring down panicked and stranded persons. 

Set up in 1998, Gondola has two phases of rides: one from Gulmarg to Kongdoori (10 minutes ride) and another from Kongdoori to Apharwat (12 minutes ride), with the highest point located at an altitude of 4,390 metres (14,403 feet). Official sources said the first phase has 63 cabins, with each cabin having a carrying capacity of six persons.

Official sources said if the tourists got stuck in the second phase, “rescue operation was almost impossible, given the terrain and altitude”.

Besides overloading, the cable car also extended the riding hours by four additional hours this year. Official sources said the cable car would run by 9 a.m. up to 8:30 p.m. last year. However, under the extended timing this year, the ride would start by 7:30 a.m. and close by 8:30 p.m. Officials said running the cable car after sunset “is against the SOPs laid in 1998 for Gondola in Gulmarg”.

“The earlier maintenance routine suggested that the cable car should rest on Monday every week for technicians to take a look. However, the maintenance has been shifted to night hours and Monday too was included to ferry tourists,” they added.

At present, there are six stations for the cable car and an open-air chair lift in Gulmarg. However, these stations are not manned by mandatory technical staff, which would include electrical and mechanical engineers, another official said.

The Corporation has also failed to fill the technical posts that fall vacant after 2012, “significantly decreasing the technical staff”, the backbone of Gondola. The staff strength in the electrical department has fallen to three from eight this year.

Meanwhile, the cable car corporation remains indecisive about reopening it for tourists. “No date has been fixed for reopening the facility. Refunds for tourists who had booked tickets between May 25 and June 3 will start being processed from Monday,” said Syed Qamar Sajjad, Managing Director, Gulmarg Gondola.

The cable car charges ₹810 per person for the first phase and ₹1010 for the second. Around one million tourists took the Gondola ride in 2024, which means 2739 persons per day on average. The year saw a revenue generation of ₹108 crores.

Published – June 02, 2026 12:20 am IST



Source link

Pune trekker’s death: Fiancée, her lover pushed him into gorge, say cops; both arrested
Over 15,000 police personnel to be deployed for Maha Deepam day in Tiruvannamalai
Two former Ministers skip review meetings chaired by Palaniswami
Dera Sacha Sauda chief Gurmeet Ram Rahim acquitted in journalist murder case
Debate, vote on motion to remove Birla to be taken up on March 9: Rijiju
TAGGED:Gondola cable car condition in plightGondola cable car rideKashmir’s Gondola cable car vulnerableKashmir's Gondola cable car faces technical issues
Share This Article
Facebook Email Print
Leave a Comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Follow US

Find US on Social Medias
FacebookLike
XFollow
YoutubeSubscribe
TelegramFollow

Weekly Newsletter

Subscribe to our newsletter to get our newest articles instantly!
[mc4wp_form]
Popular News
EntertainmentMovieMusic

Dhanashree Verma makes huge cheating allegation against Yuzvendra Chahal: ‘Caught him in…’

India Times Now Desk
India Times Now Desk
September 29, 2025
Ayanur residents bewildered by govt decision to shut down well-equipped village Community Health Centre
Bacteria can talk to each other and are multilingual, says biologist
Supreme Court quashes FIR against former regional head of Zee Rajasthan in extortion case
Owaisi criticises Union govt for ignoring his proposed amendments to Delimitation Bill
- Advertisement -
Ad imageAd image
Global Coronavirus Cases

Confirmed

0

Death

0

More Information:Covid-19 Statistics
© INDIA TIMES NOW 2026 . All Rights Reserved.
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?