By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
India Times NowIndia Times NowIndia Times Now
Notification Show More
Font ResizerAa
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
    • Technology
    • Entertainment
    • The Escapist
    • Insider
    • Finance ₹
    • India News
    • Science
    • Health
Reading: A check dam on Musi to retain water for Gandhi Sarovar
Share
India Times NowIndia Times Now
Font ResizerAa
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
Search
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
    • Technology
    • Entertainment
    • The Escapist
    • Insider
    • Finance ₹
    • India News
    • Science
    • Health
Have an existing account? Sign In
Follow US

Home » A check dam on Musi to retain water for Gandhi Sarovar

India News

A check dam on Musi to retain water for Gandhi Sarovar

India Times Now Desk
Last updated: March 11, 2026 3:13 am
India Times Now Desk
Published: March 11, 2026
Share
SHARE


The upstream area of the Musi river near Narsingi road in Hyderabad.

The upstream area of the Musi river near Narsingi road in Hyderabad.
| Photo Credit: Siddhant Thakur

The Musi Riverfront Development project envisages retention of water at the confluence of Musa and Esi rivers near Bapu Ghat at Langar Houz for its development as a tourism spot as part of Phase-I of the project. It is in the midst of the retained water that the Gandhi Sarovar project is proposed, through the installation of the ‘world’s tallest’ statue of Mahatma Gandhi.

As per the official information, a check-dam is being proposed at the location for retaining the water, as against construction of a reservoir, as widely believed. The government has recently issued a land acquisition notification for properties in the buffer zone where the Gandhi Sarovar project is being proposed, giving rise to widespread consternation and disapproval.

Detailed project plans of the Musi rejuvenation and development are set to be unveiled by Chief Minister A. Revanth Reddy on March 13. Officials informed that final touches are being made to the detailed project report under preparation for the project.

An earlier experiment to retain water in the river for tourism purposes had failed miserably. Two rubber dams were installed on the Musi River, one at the High Court and another near the Salar Jung Museum, 16 years ago, at a cost of over ₹16 crore. They proved counterproductive by trapping trash and providing a fertile breeding ground for mosquitoes. Proven as white elephants, they were eventually discarded.

However, the government now hopes to pump 2.5 tmcft of water from Mallanna Sagar reservoir into the twin reservoirs, to be released into Musi river. In order to arrest sewage from entering the river, 70 sewage treatment plants are being installed.

Officials informed that the river is being designed with a one-in-100-year flood level in mind. The 1908 floods carried one-in-1000 year flows in the river, amounting to over 4 lakh cusecs of water, after which the twin reservoirs were planned on the river.

Trunk mains will be laid on both sides of the river in the buffer zone to carry storm water and sewage, which will be treated in the STPs before being released into the river. An East-West corridor will be developed on both sides of the river, also in the buffer zone, improving connectivity to the ORR.

Published – March 11, 2026 08:43 am IST



Source link

Where does India stand in tackling TB? | Explained
Watch: The ₹370 Biryani Row: What really happened
E-application for Agniveer recruitment in Telangana opens
BCYP chief Bode Ramachandra Yadav’s hunger strike enters third day in Guntur
Perambra clash: YC workers take out march to DySP’s house
Share This Article
Facebook Email Print
Leave a Comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Follow US

Find US on Social Medias
FacebookLike
XFollow
YoutubeSubscribe
TelegramFollow

Weekly Newsletter

Subscribe to our newsletter to get our newest articles instantly!
[mc4wp_form]
Popular News

Bengaluru Traffic Police receive five electric patrolling vehicles under CSR initiative

India Times Now Desk
India Times Now Desk
July 7, 2026
Overcoming U.S. tariffs, the U.P. way
Advance on strength of education and build strong, self-reliant India: President Murmu to youth
‘No truth to reports of OPS contemplating switch to TVK’
Stocks making the biggest moves premarket: AMD, HD, HIMS, FANG
- Advertisement -
Ad imageAd image
Global Coronavirus Cases

Confirmed

0

Death

0

More Information:Covid-19 Statistics
© INDIA TIMES NOW 2026 . All Rights Reserved.
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?