By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
India Times NowIndia Times NowIndia Times Now
Notification Show More
Font ResizerAa
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
    • Technology
    • Entertainment
    • The Escapist
    • Insider
    • Finance ₹
    • India News
    • Science
    • Health
Reading: Work on storm-water drain near Virugambakkam canal to be completed in 2 weeks
Share
India Times NowIndia Times Now
Font ResizerAa
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
Search
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
    • Technology
    • Entertainment
    • The Escapist
    • Insider
    • Finance ₹
    • India News
    • Science
    • Health
Have an existing account? Sign In
Follow US

Home » Work on storm-water drain near Virugambakkam canal to be completed in 2 weeks

India News

Work on storm-water drain near Virugambakkam canal to be completed in 2 weeks

India Times Now Desk
Last updated: September 27, 2026 6:47 pm
India Times Now Desk
Published: September 27, 2026
Share
SHARE


The storm-water drain work on Kaliyamman Koil Street, at a point where it joins the Virugambakkam canal, will be completed within two weeks, Greater Chennai Corporation (GCC) Commissioner G.S. Sameeran said during an inspection on Sunday.

Mr. Sameeran inspected the development works under way at the Virugambakkam canal in Kodambakkam zone at an estimated cost of ₹30 crore. The works included construction of retaining walls, fencing, and removal of silt and waste.

He also inspected the construction of a bridge across the canal by the Chennai Metro Rail Limited at an estimated cost of ₹12 crore.

The existing bridge was being removed as part of the work. Officials were instructed to construct the bridge before the Northeast monsoon.

The Virugambakkam waterway canal begins at Bhuvaneshwari Nagar in Virugambakkam, and passes through Chinmaya Nagar, Saligramam, and M.M.D.A. Colony, before joining the Cooum.

The canal is 6.70 km in length and 8-25 m in width.

Mr. Sameeran also inspected dengue prevention measures in Kodambakkam zone.

MGR canal

He visited the MGR canal and reviewed mosquito-control spraying before conducting a door-to-door field inspection on 2nd Sector, 13th Street.

The Commissioner also distributed awareness pamphlets to residents and advised them to prevent water stagnation, remove unwanted articles, maintain cleanliness, and seek immediate medical treatment in case of fever.

Published – September 28, 2026 12:17 am IST



Source link

EDM producer MHR on his debut album ‘Valiyaparamb’: I wanted to show the audience I can do songs like this too
Nepal floods: 16 more reach Keralam, safety of 45 confirmed
Police objects to transferring Kodakara heist case to PMLA court
Soundproof barrier planned near Ranganathittu for Mysuru–Kushalnagar highway
Cyclone Montha: Panic buying at rythu bazaars in Vijayawada
TAGGED:chennai canalschennai newsdesilting worksvirugambakkam canal
Share This Article
Facebook Email Print
Leave a Comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Follow US

Find US on Social Medias
FacebookLike
XFollow
YoutubeSubscribe
TelegramFollow

Weekly Newsletter

Subscribe to our newsletter to get our newest articles instantly!
[mc4wp_form]
Popular News

How Ulloor Krishi Bhavan in Thiruvananthapuram is handholding small scale farmers

India Times Now Desk
India Times Now Desk
April 1, 2026
Visitors throng the four Presidential estates across India now open to the public
Sabarimala all set for Mandala puja on Saturday
Christmas songs ruling Instagram Reels in 2025: From classics to pop hits
National and strategic interests are supreme, says Saharanpur MP Imran Masood 
- Advertisement -
Ad imageAd image
Global Coronavirus Cases

Confirmed

0

Death

0

More Information:Covid-19 Statistics
© INDIA TIMES NOW 2026 . All Rights Reserved.
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?