By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
India Times NowIndia Times NowIndia Times Now
Notification Show More
Font ResizerAa
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
    • Technology
    • Entertainment
    • The Escapist
    • Insider
    • Finance ₹
    • India News
    • Science
    • Health
Reading: Ten of 11 stations on Kochi metro’s Pink Line to have entry/exit from both sides of road
Share
India Times NowIndia Times Now
Font ResizerAa
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
Search
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
    • Technology
    • Entertainment
    • The Escapist
    • Insider
    • Finance ₹
    • India News
    • Science
    • Health
Have an existing account? Sign In
Follow US

Home » Ten of 11 stations on Kochi metro’s Pink Line to have entry/exit from both sides of road

India News

Ten of 11 stations on Kochi metro’s Pink Line to have entry/exit from both sides of road

India Times Now Desk
Last updated: November 7, 2026 3:01 pm
India Times Now Desk
Published: November 7, 2026
Share
SHARE


The first station on the Pink Line is at Palarivattom Junction, followed by stations at Alinchuvadu, Chembumukku, Vazhakkala, Padamugal, Civil Station Junction, Cochin SEZ, Chittettukara, KINFRA Park, Infopark, and Smart City.

The first station on the Pink Line is at Palarivattom Junction, followed by stations at Alinchuvadu, Chembumukku, Vazhakkala, Padamugal, Civil Station Junction, Cochin SEZ, Chittettukara, KINFRA Park, Infopark, and Smart City.
| Photo Credit: John L. Paul

With about 70% of the viaduct of the Kochi metro’s 11.20-km Kakkanad extension (Pink Line) complete and the laying of tracks set to begin, pending works on all 11 stations in the corridor are set to gather momentum after an initial lull. This is in keeping with the revised deadline of August 2027, which has been set to complete the works on the extension, official sources said.

Contrary to the perception that a few stations will have entry/exit only from one side of the road, 10 of the 11 stations will have entry/exit from both sides of the road beneath the upcoming metro extension. The terminal station, whose work is set to begin on the Smart City premises, will have entry/exit only on the right hand side, while a foot overbridge will provide a link for members of the public to access the station, they added.

The structural work on the entry/exit of the Chittetukara station is over on both the left hand side and the right hand side of the road, while that of the left-hand side of the KINFRA Park station is over. Work on the right hand side of the Vazhakkala station is over, and architectural work has begun. Structural works on the left hand side entry/exit of the stations at Civil Station Junction and Cochin SEZ are scheduled to be completed by the first week of December.

The foundation works of the entry/exit of the Chembumukku station whose land acquisition suffered delay is over, and rest of the works is set to gather pace on both sides of the road, it is learnt.

Metro sources attributed the delay in commencing work on the right hand side entry/exit of Palarivattom Junction and Padamugal stations to hassles associated with land acquisition. The requisite plots of land for the two stations will be acquired by the end of December. The pending works on most metro stations will gather pace in the coming weeks, since the requisite pre-fabricated structures are ready at the casting yard. They will be transported in lorries and launched at the stations concerned. This will be followed by architectural works, laying of tracks, and installation of signals and telecommunication equipment, lifts and escalators, to name a few.

The first station on the Pink Line is at Palarivattom Junction, followed by stations at Alinchuvadu, Chembumukku, Vazhakkala, Padamugal, Civil Station Junction, Cochin SEZ, Chittettukara, KINFRA Park, Infopark, and Smart City.

Published – November 07, 2026 08:26 pm IST



Source link

U.P. focuses on utilisation of Gram Sabha ponds, reservoirs, rivers to make fisheries backbone of rural livelihood
Land for border fencing not an issue, Centre must roll back BSF jurisdiction expansion rule: Mamata Banerjee
Collector inaugurates new girls’ hostel at Kannan Govt. High School in Chittoor
Six persons honoured with IIT-M’s First Principles Teachers Award 2026
Engine fuel switches malfunctioned on Air India London-Bengaluru Boeing 787-8 aircraft
TAGGED:Ten of 11 stations on Kochi metro’s Pink Line to have entry/exit from both sides of road
Share This Article
Facebook Email Print
Leave a Comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Follow US

Find US on Social Medias
FacebookLike
XFollow
YoutubeSubscribe
TelegramFollow

Weekly Newsletter

Subscribe to our newsletter to get our newest articles instantly!
[mc4wp_form]
Popular News

Mumps cases reported in parts of Keralam’s Thrissur; DMO urges public to stay vigilant

India Times Now Desk
India Times Now Desk
September 19, 2026
How V.O. Chidambaram Pillai earned the title ‘Sekkizhutha Chemmal’
Suriya’s Scene vs Nayanthara’s Mookuthi Amman 2 Box Office Day 3: Which Tamil film leads the weekend race?
Union government sets $21 billion textile export target for Tamil Nadu by 2030
Telangana energy sector to complement govt. plans to achieve $3 trillion economy: Dy. CM
- Advertisement -
Ad imageAd image
Global Coronavirus Cases

Confirmed

0

Death

0

More Information:Covid-19 Statistics
© INDIA TIMES NOW 2026 . All Rights Reserved.
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?