By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
India Times NowIndia Times NowIndia Times Now
Notification Show More
Font ResizerAa
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
    • Technology
    • Entertainment
    • The Escapist
    • Insider
    • Finance ₹
    • India News
    • Science
    • Health
Reading: Rainfall deficit hits hydropower generation in Sharavati Valley
Share
India Times NowIndia Times Now
Font ResizerAa
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
Search
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
    • Technology
    • Entertainment
    • The Escapist
    • Insider
    • Finance ₹
    • India News
    • Science
    • Health
Have an existing account? Sign In
Follow US

Home » Rainfall deficit hits hydropower generation in Sharavati Valley

India News

Rainfall deficit hits hydropower generation in Sharavati Valley

India Times Now Desk
Last updated: June 29, 2026 12:34 pm
India Times Now Desk
Published: June 29, 2026
Share
SHARE


A view of the Linganmakki Dam, the major reservoir in Sharavati Valley.

A view of the Linganmakki Dam, the major reservoir in Sharavati Valley.
| Photo Credit: FILE PHOTO

The month-long deficit in rainfall has impacted hydropower generation in the Sharavati Valley, one of the State’s major sources of hydel energy.

The Linganamakki Powerhouse, with an installed capacity of 55 MW, has ceased operations entirely. Of its two units, only one remained active in recent weeks due to maintenance of the other. The falling water level has now forced the shutdown of the remaining operational unit.

At the Sharavati Generating Station (SGS), which has a total installed capacity of 1,035 MW, operations are running at bare minimum levels dictated by grid demand. Of the station’s ten units, nine are operational while one remains under maintenance. Sunday’s generation stood at approximately 500 MW against the full capacity.

B. Anand Kumar, Chief Engineer, Sharavati Hydro-Electric Project, told The Hindu that both units at the Linganamakki Powerhouse have been stopped. “Among the ten units in the SGS, nine are in good condition, while one is under maintenance. We are generating only what is needed, utilising the available water based on demand,” he said.

The Linganamakki reservoir, as of Monday morning, recorded a water level of 1,744.80 ft against the full reservoir capacity of 1,819 ft. This marks a sharp decline compared to 1,784.05 ft on the same date last year.

Storage in the main reservoir stands at just 14.17 TMC (9.34%) against a gross capacity of 151.64 TMC. Last year on this date, the storage was 62.74 TMC (41.38%). The available energy component for generation is now a mere 426 million units, down from 1,854 million units last year.

Inflow to the reservoir has plummeted. Monday recorded only 4,553 cusecs, compared to 24,752 cusecs during the corresponding period last year.

“The Department of Meteorology has issued a yellow alert for the week. We hope the inflow will increase if the catchment areas receive good rainfall,” Mr. Kumar said.

Published – June 29, 2026 06:04 pm IST



Source link

Seafarers’ safety ‘highest priority’, says Indian Embassy in Ukraine amid attacks on ships in Black Sea
Four workers die after inhaling toxic fumes at septic tank in Surat
Permanent buildings for 60 Tahsildar, five RDO offices soon: Ponguleti
Uttar Pradesh Court rejects government plea to withdraw charges against Akhlaq murder accused
‘Hanuman’ project launched to tackle human–wildlife conflict in Andhra Pradesh
TAGGED:karnatakalinganmakki damlinganmakki reservoirRainfall deficit hits hydropower generation in Sharavati Valleysharavati valleyshivamogga
Share This Article
Facebook Email Print
Leave a Comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Follow US

Find US on Social Medias
FacebookLike
XFollow
YoutubeSubscribe
TelegramFollow

Weekly Newsletter

Subscribe to our newsletter to get our newest articles instantly!
[mc4wp_form]
Popular News

Forest department takes over 42.72 hectares of land from private estate in Kolukkumalai

India Times Now Desk
India Times Now Desk
June 29, 2026
Mysuru tiger attacks: Big cat involved in three deaths captured in Sargur taluk
Chirag Paswan | A keen negotiator
BJP to reintroduce Women’s Reservation Bill, says Nagothu Ramesh; protests on April 24, 25
Bengal polls: Scattered clashes, assault on candidates mar phase-I voting; ECI seeks report
- Advertisement -
Ad imageAd image
Global Coronavirus Cases

Confirmed

0

Death

0

More Information:Covid-19 Statistics
© INDIA TIMES NOW 2026 . All Rights Reserved.
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?