By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
India Times NowIndia Times NowIndia Times Now
Notification Show More
Font ResizerAa
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
    • Technology
    • Entertainment
    • The Escapist
    • Insider
    • Finance ₹
    • India News
    • Science
    • Health
Reading: Nitin Gadkari witnesses Zojila Tunnel breakthrough at an altitude of 11,578 feet | Business
Share
India Times NowIndia Times Now
Font ResizerAa
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
Search
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
    • Technology
    • Entertainment
    • The Escapist
    • Insider
    • Finance ₹
    • India News
    • Science
    • Health
Have an existing account? Sign In
Follow US

Home » Nitin Gadkari witnesses Zojila Tunnel breakthrough at an altitude of 11,578 feet | Business

BusinessStartup

Nitin Gadkari witnesses Zojila Tunnel breakthrough at an altitude of 11,578 feet | Business

India Times Now Desk
Last updated: June 9, 2026 6:53 am
India Times Now Desk
Published: June 9, 2026
Share
SHARE


New Delhi:

Today marks a milestone in the history of Indian engineering marvels by connecting two ends of the 13-kilometre-long main section of the Zojila Tunnel, making it the world’s longest single-tube bi-directional bypass built at record height. The tunnel, 9.5 metres wide, 7.57 metres high, and 13.153 km long, is a horseshoe-shaped tunnel built at an elevation of around 11,578 feet above sea level. The breakthrough blast was witnessed by Union Minister for Road Transport and Highways Nitin Gadkari. This achievement not only demonstrates the indomitable courage of Indian engineers but also marks the beginning of a new era for millions of people living in Kashmir and Ladakh.

An over 3-hour journey to be reduced to just 15 minutes

Currently, passengers and vehicles travelling from Sonamarg to Dras, Kargil, and Ladakh must pass through the extremely dangerous and narrow Zojila Pass. This route is considered one of the most challenging in the country due to sharp turns, sudden snowfall, and inclement weather. Once fully operational, this three-and-a-half-hour, perilous journey will be reduced to just 15 minutes. This tunnel will directly and safely connect Baltal (Sonamarg) in Jammu and Kashmir and Manimarg (Dras) in Ladakh.

Throughout the year connectivity 

Every year, heavy snowfall and dangerous avalanches would completely close the Zojila Pass, completely cutting off Ladakh from the rest of the country for approximately five to six months. During the winter, there’s a severe shortage of rations, medicines, and essential commodities. But the Zojila Tunnel will solve this problem once and for all. This will facilitate vehicular movement from Kashmir to Ladakh without interruption throughout the year and in all seasons.

To help the Indian Army 

The Indian Army will benefit once the mega-tunnel becomes functional. This sensitive area, bordering China and Pakistan, will now facilitate the movement of troops, heavy tanks, and military equipment in all weather conditions, significantly strengthening the country’s border security.

Will boost tourism

This tunnel will prove to be a boon for tourism and boost the local economy. Year-round connectivity will also expand the tourist footprint in destinations like Ladakh, Kargil, and Sonamarg. With tourism continuing even in winter, it will provide significant employment opportunities for those involved in local hotels, homestays, transportation, and the local handicraft trade.

ALSO READ | E85 fuel: Why is it Rs 20 cheaper than normal fuel, and can your car use it? Find out here





Source link

Sensex tumbles 715.06 points, Nifty falls below 24,000 amid surge in crude oil prices
Agri stock below Rs 100 in focus as consolidated revenue gains 27.6% YoY to Rs 426.51 crore
Noida vs Gurugram: How corporate expansion and infrastructure are splitting NCR, check details
Defence stock surges 16% after receiving license from govt for manufacturing of ammunition, details
AI can accelerate global growth by 0.8%, India’s Viksit Bharat goal achievable: IMF MD
TAGGED:altitudebreakthroughBusinessfeetGadkariNitintunnelwitnessesZojilaZojila TunnelZojila Tunnel distanceZojila Tunnel heightZojila Tunnel lengthZojila Tunnel loactionZojila Tunnel nitin gadkari
Share This Article
Facebook Email Print
Leave a Comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Follow US

Find US on Social Medias
FacebookLike
XFollow
YoutubeSubscribe
TelegramFollow

Weekly Newsletter

Subscribe to our newsletter to get our newest articles instantly!
[mc4wp_form]
Popular News

Ammonia gas leak: two more women workers die, taking toll to 15

India Times Now Desk
India Times Now Desk
June 26, 2026
KENT enters energy sector with launch of new range of lithium batteries, solar hybrid inverters
Rashmika Mandanna’s The Girlfriend director Rahul Ravindran reacts to criticism amid Ketan Agarwal-Siya Goyal case | Regional-cinema
Prior permission mandatory for protests and rallies, says Ranchi Deputy Commissioner
Will not go back to Ramadoss as long as he is ‘encircled’ by traitors: Anbumani
- Advertisement -
Ad imageAd image
Global Coronavirus Cases

Confirmed

0

Death

0

More Information:Covid-19 Statistics
© INDIA TIMES NOW 2026 . All Rights Reserved.
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?