By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
India Times NowIndia Times NowIndia Times Now
Notification Show More
Font ResizerAa
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
    • Technology
    • Entertainment
    • The Escapist
    • Insider
    • Finance ₹
    • India News
    • Science
    • Health
Reading: Kochi Corporation orders probe into spending of ₹6.32 crore for streetlight maintenance in 2022-23
Share
India Times NowIndia Times Now
Font ResizerAa
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
Search
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
    • Technology
    • Entertainment
    • The Escapist
    • Insider
    • Finance ₹
    • India News
    • Science
    • Health
Have an existing account? Sign In
Follow US

Home » Kochi Corporation orders probe into spending of ₹6.32 crore for streetlight maintenance in 2022-23

India News

Kochi Corporation orders probe into spending of ₹6.32 crore for streetlight maintenance in 2022-23

India Times Now Desk
Last updated: July 17, 2026 2:44 am
India Times Now Desk
Published: July 17, 2026
Share
SHARE


CSML initially installed around 3,300 smart, energy-efficient lights three years ago, followed by another 40,000 under the Pan City LED Street Light project last year, at a total cost of over ₹35 crore. File.

CSML initially installed around 3,300 smart, energy-efficient lights three years ago, followed by another 40,000 under the Pan City LED Street Light project last year, at a total cost of over ₹35 crore. File.
| Photo Credit: The Hindu

The Kochi Corporation has spent ₹49.56 crore over the 14 years between 2011-12 and 2025-26 on the repair and maintenance of nearly 76,000 streetlights.

The UDF-led Corporation council has now ordered a probe into the expenditure of ₹6.32 crore incurred in the 2022-23 financial year during the tenure of the previous LDF council. This was ₹1.39 crore more than ₹4.92 crore, the second-largest spend during the period, recorded the very next year.

“We have asked the superintending engineer and the Additional Secretary to submit a report on the matter at the next council meeting. A survey will also be conducted to verify the number of LED lights that Cochin Smart Mission Limited [CSML] claimed to have installed under the City LED Street Light project last year and to assess the number of old lights that remain to be replaced,” said Mayor V.K. Minimol.

A report on the expenditure towards street light repair and maintenance was tabled at the council meeting on Wednesday (July 15, 2026).

Councillors across political lines have consistently criticised the alleged slackness in the operation and maintenance of LED lights installed by CSML. The agency initially installed around 3,300 smart, energy-efficient lights three years ago, followed by another 40,000 under the Pan City LED Street Light project last year, at a total cost of over ₹35 crore. Two separate agencies have since been entrusted with the operation and maintenance of these lights for five years, at the Corporation’s expense.

Incidentally, the maintenance cost of streetlights registered a dramatic fall from ₹4.28 crore in 2024-25 to a mere ₹4.29 lakh in 2025-26, coinciding with the launch of the Pan City LED Street Light project. “However, that does not reflect the operation and maintenance of those LED lights, which is now the Corporation’s responsibility,” Ms. Minimol clarified.

There remains no clarity on the number of old streetlights yet to be replaced. By rough estimates, the Corporation has about 76,000 streetlights, and after deducting the LED lights installed by CSML, some 30,000-odd conventional ones remain. These include a mix of CFL bulbs, tube lights, LED panels, and old steel tube panels.

“The biggest challenge in maintaining CSML’s LED lights is the dependence on the Kerala State Electricity Board [KSEB]. Often, the lights in an area fall under multiple transformers, all of which need to be switched off for maintenance. But KSEB officials often switch off only a few, leaving the work incomplete. Moreover, KSEB officials are unavailable between the 1st and 5th of every month as they would be busy with billing operations,” said Henry Austin, UDF councillor.

Published – July 16, 2026 08:03 pm IST



Source link

Odisha CM attributes policy driven reforms to State being bracketed among top five performers by NITI Aayog
Kerala HC directs State to decide on appointment of expert panel to probe alleged irregularities in digital re-survey
GST reforms will provide relief to nearly 90% of Indian households, says Lanka Dinakar
Rahul Gandhi plans Great Nicobar visit, clearance awaited
Quality concerns raised over IV cannulas in Tamil Nadu government hospitals
Share This Article
Facebook Email Print
Leave a Comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Follow US

Find US on Social Medias
FacebookLike
XFollow
YoutubeSubscribe
TelegramFollow

Weekly Newsletter

Subscribe to our newsletter to get our newest articles instantly!
[mc4wp_form]
Popular News

TNCC invites applications from election aspirants

India Times Now Desk
India Times Now Desk
December 9, 2025
Three MEMU trains in Kerala to add coaches from Feb. 23: Union Minister Suresh Gopi
Sri Lankan Tamil girl killed after gang rams SUV into two-wheeler on Koyambedu flyover
VACB launches ‘Operation Earth Guard’ to curb illegal soil mining in Kerala
Sensex shrugs weak global cues to end 138 points higher, Nifty settles at 23,477.80
- Advertisement -
Ad imageAd image
Global Coronavirus Cases

Confirmed

0

Death

0

More Information:Covid-19 Statistics
© INDIA TIMES NOW 2026 . All Rights Reserved.
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?