Reading: Karnataka High Court asks State’s response to plea complaining about impact of tunnel road project to Hebbal lake
Share
India Times NowIndia Times Now
Font ResizerAa
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
Search
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
    • Technology
    • Entertainment
    • The Escapist
    • Insider
    • Finance ₹
    • India News
    • Science
    • Health
Have an existing account? Sign In
Follow US

Home » Karnataka High Court asks State’s response to plea complaining about impact of tunnel road project to Hebbal lake

India News

Karnataka High Court asks State’s response to plea complaining about impact of tunnel road project to Hebbal lake

India Times Now Desk
Last updated: August 6, 2026 7:19 pm
India Times Now Desk
Published: August 6, 2026
Share
SHARE


Contents
  • Any study conducted?
  • Constitutional validity
  • Impact assessment
The Bench directed the Government to file affidavit specifying if any study has been conducted on the impact of the project on Hebbal lake.

The Bench directed the Government to file affidavit specifying if any study has been conducted on the impact of the project on Hebbal lake.
| Photo Credit: File photo

The High Court of Karnataka on Thursday ordered issue of notice to State government on a PIL petition questioning the project that envisages constructing a 2.2 km long three-lane, short transitory twin tunnel from Hebbal junction to the Karnataka Veterinary, Animal and Fisheries University (KVAFSU) at an estimated cost of ₹1,130 crore.

Also, the Court orally warned of staying the project if the Government and its authorities failed to file its response to the issues raised in the petition in writing before the next date of hearing on August 24.

A division bench comprising Chief Justice Vibhu Bakhru and Justice K.S. Hemalekha passed the order on the petition filed by Guruprasad R.K, a technocrat, Rishvanjas Raghavan, founder of Bengaluru Nava Nirmana Party’s youth wing, and Elizabeth Soumya, founder of Hebbal Nature Society.

Any study conducted?

Apart from responding to the issues raised in the petitions, the Bench directed the Government to file affidavit specifying if any study has been conducted on the impact of the project on Hebbal lake, and stating that whether studies have covered the question whether tunnel would cause any obstruction to lake’s inflow or outflow of water. The Bench also ordered issue of notice to M/s Rithwik Projects Pvt. Ltd., the contractor of the tunnel road project.

Contending that the project poses a severe threat to the ecologically sensitive Hebbal lake and has been approved by violating various provisions of the law, it has been pointed out in the petition that the Detailed Project Report (DPR) itself acknowledges the hydrological sensitivity of the area, noting groundwater movement and the need for a watertight structure near the lake.

Stating that the DPR admits that the tunnel will be just 8-12 metres from the lake boundary, the petition contends that this distance from the lake violates even the reduced buffer zones under the amended provisions of the Karnataka Tank Conservation and Development Authority Act.

Constitutional validity

Also, the petitioners have challenged the constitutional validity of the Karnataka Tank Conservation and Development Authority (Amendment) Act, 2025, which drastically reduced buffer zones around lakes.

The amendment replaced a uniform 30-metre buffer with a graded system based on a lake’s size, allowing for buffers as small as 0 to 1 metre for smaller lakes and reducing the buffer to 30 metres only for lakes over 100 acres, the Court said while contending reduction in buffer zone is scientifically unsound and a deliberate attempt to facilitate the tunnel project. Karnataka High Court asks State’s response to plea complaining about impact of tunnel road project to Hebbal lake.

The litigation also challenges Rule 24 of the Bengaluru Metropolitan Land Transport Authority (BMLTA) Rules, 2026. The petition terms amended rule a ‘colourable exercise” that attempts to retrospectively validate projects, including the Hebbal tunnel, initiated without the mandatory prior approval from the BMLTA.

Impact assessment

The petitioners have also sought a direction to restrain the authorities from proceeding with the project until comprehensive and independent hydrological, hydrogeological, groundwater, stormwater, flood-risk and cumulative environmental impact assessments are conducted by competent expert agencies and disclosed publicly, while seeking direction for constituting an independent panel of experts to assess impact on Hebbal lake, groundwater recharge, drainage, flood resilience and mobility.

Published – August 07, 2026 12:49 am IST



Source link

‘No space, too old’: Four from Calvary Temple arrested for abandoning Siberian Huskies in Hyderabad outskirts
Kerala Assembly polls 2026: Women’s issues weaponised for smear campaigns, allege critics
Plea submitted to grant district permits to all autorickshaws plying in Karnataka’s Kodagu dist.
One more death due to amoebic fever in Kozhikode
Literary festivals true celebration of humanity, says writer Volga
TAGGED:Animal and Fisheries UniversityBengaluruhebbal junctionHebbal lakehigh courtkarnatakaKarnataka Veterinary
Share This Article
Facebook Email Print
Leave a Comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Follow US

Find US on Social Medias
FacebookLike
XFollow
YoutubeSubscribe
TelegramFollow

Weekly Newsletter

Subscribe to our newsletter to get our newest articles instantly!
[mc4wp_form]
Popular News

Supreme Court stays Delhi High Court order declaring NSEI ‘public authority’ under RTI Act

India Times Now Desk
India Times Now Desk
July 31, 2026
Sri Ramakrishna Jayanti celebrated with procession in Tirupati
Modi makes historic landing at Emergency Landing Facility in Assam
From MRF to Hindustan Copper: These stocks to trade ex-date soon, check amount and record date
Sensex surges 827.57 points, Nifty tops 24,200 amid renewed buying interest at lower levels | Markets
- Advertisement -
Ad imageAd image
Global Coronavirus Cases

Confirmed

0

Death

0

More Information:Covid-19 Statistics
© INDIA TIMES NOW 2026 . All Rights Reserved.
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?