By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
India Times NowIndia Times NowIndia Times Now
Notification Show More
Font ResizerAa
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
    • Technology
    • Entertainment
    • The Escapist
    • Insider
    • Finance ₹
    • India News
    • Science
    • Health
Reading: Jaipur Metro Line 2 to have direct underground link to all three terminals of airport
Share
India Times NowIndia Times Now
Font ResizerAa
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
Search
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
    • Technology
    • Entertainment
    • The Escapist
    • Insider
    • Finance ₹
    • India News
    • Science
    • Health
Have an existing account? Sign In
Follow US

Home » Jaipur Metro Line 2 to have direct underground link to all three terminals of airport

BusinessStartup

Jaipur Metro Line 2 to have direct underground link to all three terminals of airport

India Times Now Desk
Last updated: January 1, 2026 10:50 am
India Times Now Desk
Published: January 1, 2026
Share
SHARE


According to metro officials, Line 2, linking Prahladpura in Sitapura to Todi Mod in Vidhyadhar Nagar, with a total length of 43 km, will be constructed in seven project packages.

Jaipur:

Jaipur Metro is going to witness a significant enhancement in its capability with Line 2 of the metro network in the city slated to enhance connectivity to the airport. There are plans to provide commuters with direct underground access from the Airport Metro Station to all passenger terminals.

Latest updates suggest that passengers will be given the option to commute between the Metro station and the three terminals through dedicated tunnels and shuttle services. The development comes after a recent consultation between airport authorities and Jaipur Metro Rail Corporation (JMRC).

Inclusion of the third terminal

As per a Times of India report, Jaipur Airport will oversee the inclusion of the third terminal by the time Line 2 comes into operation. Currently, the airport operates two terminal buildings. The new terminal is being constructed beside Terminal 2 towards the Sanganer side.

ToI quotes an official as saying, “It has been decided to construct three separate underground tunnels for passengers to move to and from these terminals and the Metro station. JMRC will construct these terminals and will install walkways and elevators to facilitate the passengers moving with heavy baggage. The airport officials are also likely to provide shuttle services from the terminals and the station.” 

Akin to Delhi Metro’s airport line model, the Airport Station in Jaipur will be equipped with two designated entry and exit points. One of such points will be linked directly to the airport terminals, while the second will cater to regular Metro commuters coming from nearby localities.

According to metro officials, Line 2, linking Prahladpura in Sitapura to Todi Mod in Vidhyadhar Nagar, with a total length of 43 km, will be constructed in seven project packages.

It is to be noted that the tendering for the first package, running between Prahladpura and Pinjrapole Gaushala, was launched in December.

ALSO READ | 8th Pay Commission to take effect from January 1: Key details on salary hike, pension and fitment factor





Source link

Union Budget 2026: MoD seeks 20 per cent hike on defence spending | Ambition vs reality
Is real estate still one of India’s strongest long-term investment bets? Here’s what experts say
RBI holds repo rate at 5.25%, lowers FY27 GDP forecast to 6.6% on concerns over West Asia conflict | Business
Gold, Silver Rates Today (Sep 22): Gold hits record high on MCX with onset of festive season | Check city-wise rates
SBI Life-owned NBFC stock to be in focus as firm increases customer network to 4,380 touchpoints: Details
TAGGED:AirportDelhi metroDirectjaipurJaipur Metro Line 2Jaipur Metro Rail CorporationJMRCLinelinkMetroterminalsunderground
Share This Article
Facebook Email Print
Leave a Comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Follow US

Find US on Social Medias
FacebookLike
XFollow
YoutubeSubscribe
TelegramFollow

Weekly Newsletter

Subscribe to our newsletter to get our newest articles instantly!
[mc4wp_form]
Popular News

Eight India-bound ships return after attempting to cross Strait of Hormuz

India Times Now Desk
India Times Now Desk
April 18, 2026
Investors still seek a human touch even with AI tools at hand: HSBC
In pictures | Durga Puja pandals lead the way to a festive Navaratri
Water level in Mullaperiyar dam stands at 139.35 feet
Kerala SIR: Over 500 with non-Indian citizenship on their way out of electoral rolls
- Advertisement -
Ad imageAd image
Global Coronavirus Cases

Confirmed

0

Death

0

More Information:Covid-19 Statistics
© INDIA TIMES NOW 2026 . All Rights Reserved.
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?