By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
India Times NowIndia Times NowIndia Times Now
Notification Show More
Font ResizerAa
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
    • Technology
    • Entertainment
    • The Escapist
    • Insider
    • Finance ₹
    • India News
    • Science
    • Health
Reading: ISRO successfully carries out tests of Gaganyaan crew module systems
Share
India Times NowIndia Times Now
Font ResizerAa
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
Search
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
    • Technology
    • Entertainment
    • The Escapist
    • Insider
    • Finance ₹
    • India News
    • Science
    • Health
Have an existing account? Sign In
Follow US

Home » ISRO successfully carries out tests of Gaganyaan crew module systems

India News

ISRO successfully carries out tests of Gaganyaan crew module systems

Times Desk
Last updated: July 12, 2026 8:15 pm
Times Desk
Published: July 12, 2026
Share
SHARE


The crew module uprighting system. Photo: isro.gov.in

The crew module uprighting system. Photo: isro.gov.in

The Indian Space Research Organisation (ISRO) on Sunday (July 12, 2026) said it had successfully carried out three major tests of the Gaganyaan crew module systems.

The first test pertained to ensuring an upright position for the crew module after splashdown in the sea, considered one of the most important crew safety requirements.

To do this, a stored cold-gas-based uprighting system was developed and tested.

“A system-level qualification test setup consisting of all the elements of CMUS (crew module uprighting system) was realised and successful inflation tests were conducted for the primary inflation module wherein stored gas in the high-pressure gas bottle was made to inflate the flotation by operating the control valves,” the ISRO said.

The service module connect-disconnect system.

The service module connect-disconnect system.
| Photo Credit:
ISRO

The second test involved examining the separation of the umbilical mechanism that serves as a link between the crew module, where astronauts live, and the service module, which provides power and propulsion.

The mechanism consists of two parts, each located at the crew module side, called CSU-1, and the service module side, called CSU-2.

During the crew module’s Earth re-entry stage, the service module first separates from the crew module after the CSU-1 disconnects. Subsequently, just before re-entry, the CSU-2 is also separated.

“Separation test of CSU-2 from the simulated crew module was carried out. The test demonstrated the clean separation of CSU-2 as well as the structural stability of the crew module panel and their interfaces,” the space agency said.

Testing of the apex cover separation.

Testing of the apex cover separation.
| Photo Credit:
ISRO

The third test validated the structural integrity of the crew module during the apex cover separation event.

The apex cover protects the parachutes and associated subsystems during the mission. It is separated before parachutes are deployed to decelerate the crew module.

Published – July 12, 2026 10:27 pm IST



Source link

KMRL announces short-term additional discount on mobile QR tickets
T.N. institutions have completed almost all projects funded under RUSA: Union Joint Secretary
Madurai’s Sekkipatti: where Muslims receive temple honours and Hindus worship, make offerings at a dargah
Over 600 detained in 500 search operations across Kashmir: police
Fish prices surge in Kozhikode as climate stress shrinks catches
TAGGED:Crew Module Uprighting SystemCSU-2 separationgaganyaanGaganyaan crew moduleHuman spaceflight missionISRO crew module
Share This Article
Facebook Email Print
Leave a Comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Follow US

Find US on Social Medias
FacebookLike
XFollow
YoutubeSubscribe
TelegramFollow

Weekly Newsletter

Subscribe to our newsletter to get our newest articles instantly!
[mc4wp_form]
Popular News
EntertainmentMovieMusic

Dhurandhar: The Revenge – Raw and Undekha to release on Netflix India? Streaming giant drops major hint | Ott

Times Desk
Times Desk
June 18, 2026
Crest gates of Tunga reservoir lifted to release excess water
A game of four – The Hindu
Surgical equipment in abdomen: doctor suspended
BWSSB water supply restored – The Hindu
- Advertisement -
Ad imageAd image
Global Coronavirus Cases

Confirmed

0

Death

0

More Information:Covid-19 Statistics
© INDIA TIMES NOW 2026 . All Rights Reserved.
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?