By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
India Times NowIndia Times NowIndia Times Now
Notification Show More
Font ResizerAa
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
    • Technology
    • Entertainment
    • The Escapist
    • Insider
    • Finance ₹
    • India News
    • Science
    • Health
Reading: Expert team continues inspection of Polavaram project for second day
Share
India Times NowIndia Times Now
Font ResizerAa
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
Search
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
    • Technology
    • Entertainment
    • The Escapist
    • Insider
    • Finance ₹
    • India News
    • Science
    • Health
Have an existing account? Sign In
Follow US

Home » Expert team continues inspection of Polavaram project for second day

India News

Expert team continues inspection of Polavaram project for second day

India Times Now Desk
Last updated: May 28, 2026 2:21 pm
India Times Now Desk
Published: May 28, 2026
Share
SHARE


International expert Sean Hinchberger on Thursday continued his second-day inspection of the Polavaram irrigation project along with officials from the Central and State Water Resources Departments.

After inspecting Gap-1 and Gap-2 of the diaphragm wall on the first day, the team focused on the borrow earth being used for the Earth-cum-Rock Fill (ECRF) dam works.

The team examined the soil storage areas and enquired about the locations from where the earth was collected and the quality tests being conducted before its usage. Officials informed the expert that the material was being used only after certification by the Central Soil and Materials Research Station (CSMRS) and internal quality checks.

Later, Central Water Commission Chief Engineer Sarabjit Singh Bakshi chaired a review meeting, where officials explained the ECRF works, retaining wall construction and dewatering plans through a presentation.

Meanwhile, the CSMRS expert team concluded technical tests at the project site, including assessments in Gap-2 to study the rock-filled section’s ability to withstand water flow conditions.

Published – May 28, 2026 07:51 pm IST



Source link

Opposition accuses Speaker Narwekar of interfering in nomination process for BMC polls
Madras High Court dismisses plea against animal slaughter in retail meat shops
Ujjain land pooling: BKS calls govt notification on Simhastha planning misleading; warns of restarting protest
KPRS seeks SAP implementation, ₹900 more per tonne of sugarcane
Three emerge as contenders for chairperson’s post in Perumbavoor
TAGGED:inspection of Polavaram projectPolavaram irrigation projectSean Hinchberger
Share This Article
Facebook Email Print
Leave a Comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Follow US

Find US on Social Medias
FacebookLike
XFollow
YoutubeSubscribe
TelegramFollow

Weekly Newsletter

Subscribe to our newsletter to get our newest articles instantly!
[mc4wp_form]
Popular News

BJP is Ravan, Congress is Ram, says Revanth in Goa

India Times Now Desk
India Times Now Desk
October 11, 2026
EU, India commit to collaboration on ‘peaceful uses’ of nuclear power
Govinda shares first reaction after hospitalisation; assures fans he is ‘fine’
Punjab rural polls results: AAP wins over 200 zones of zila parishad, leading in panchayat samiti
Measures under way to simplify process of obtaining community certificates: T.N. Minister Sengottaiyan
- Advertisement -
Ad imageAd image
Global Coronavirus Cases

Confirmed

0

Death

0

More Information:Covid-19 Statistics
© INDIA TIMES NOW 2026 . All Rights Reserved.
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?