By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
India Times NowIndia Times NowIndia Times Now
Notification Show More
Font ResizerAa
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
    • Technology
    • Entertainment
    • The Escapist
    • Insider
    • Finance ₹
    • India News
    • Science
    • Health
Reading: Chennai Metro Rail train chugs along from Porur to Vadapalani
Share
India Times NowIndia Times Now
Font ResizerAa
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
Search
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
    • Technology
    • Entertainment
    • The Escapist
    • Insider
    • Finance ₹
    • India News
    • Science
    • Health
Have an existing account? Sign In
Follow US

Home » Chennai Metro Rail train chugs along from Porur to Vadapalani

India News

Chennai Metro Rail train chugs along from Porur to Vadapalani

Times Desk
Last updated: January 11, 2026 5:27 pm
Times Desk
Published: January 11, 2026
Share
SHARE


First step: Chennai Metro Rail Limited conducted a trial run from Porur Bypass to Vadapalani, a distance of 5.5 km, on Sunday. The train left Porur around 11.15 a.m. and reached Vadapalani at 12.10 p.m., clocking 15 kmph.

First step: Chennai Metro Rail Limited conducted a trial run from Porur Bypass to Vadapalani, a distance of 5.5 km, on Sunday. The train left Porur around 11.15 a.m. and reached Vadapalani at 12.10 p.m., clocking 15 kmph.
| Photo Credit: J. Johan Sathyadas

By February, commuters from Poonamallee may be able to travel to Vadapalani on Chennai Metro Rail trains in about half-an-hour, skipping the peak hour traffic. Taking the first step in this direction, Chennai Metro Rail Limited (CMRL) conducted a trial run from Porur  Junction to Vadapalani, a distance of 5.5 km, on the double-decker stretch on Sunday.

The trial run was conducted after the construction of the elevated viaduct from Porur to Vadapalani — which includes a short-yet-challenging stretch, a 4-km double-decker line from Alwarthirunagar  to Alapakkam — was completed.

The train left the Porur station around 11.15 a.m., chugged along at 15 kmph, and reached Vadapalani at 12.10 p.m. During the trial run, the speed was kept to the minimum. In the next few weeks, the train will be tested at 45 kmph-50 kmph, officials said. Sunday’s trial run came nine months after the trial run in the phase II network from Poonamallee  to Porur.

CMRL managing director M.A. Siddique said that initially, the plan was to operate services from Poonamallee to Porur by December 2025. Subsequently, the CMRL decided to tweak it and extend the services to Vadapalani. This is because commuters will be able to change trains to the phase I network at Vadapalani and travel to more localities on Metro Rail. “Trains will be operated normally between Poonamallee  to Porur with all stops. But the next stop after Porur will be Vadapalani. The stations after Porur till Power House are under construction. The work will be finished in June this year,” he said.

The CMRL had planned Grade of Automation 4 (GoA 4) operations, a system which allows for driverless train services. But, for now, it will operate Grade of Automation 2 (GoA2), meaning a driver will steer the train as in the phase I network, Mr. Siddique said. The CMRL would gradually move towards driverless operations in the coming months, he added.

The CMRL received an interim speed certificate from the Railway Board last month. The final certificate will come in shortly. “We will invite the Commissioner of Metro Rail Safety (CMRS) for a safety inspection later this month. Thereafter, we will be authorised to operate passenger services. We hope to complete these processes soon and start the services by mid-February,” he added.

A plenty of work is yet to be completed at the Vadapalani Phase II station. Hence, in the initial period, commuters coming from  Poonamallee and getting down at the Vadapalani Phase II station will get off on the platform, reach the concourse, and head to the  Vadapalani Phase I station on a sky-walk. They will have to swipe their tickets, enter and exit only through the Vadapalani Phase I station.

After the Union government returned the proposals for the Coimbatore  and Madurai Metro Rail systems, the CMRL prepared a justification and sent it to the Tamil Nadu government. Officials said it would be forwarded to the Centre soon.

Published – January 11, 2026 10:57 pm IST



Source link

GBA chief commissioner directs corporations to prepare for monsoon
Congress holding discussions to form alliance with VBA for Maharashtra civic polls: Harshwardhan Sapkal
Courts take cognisance of the offence, not of the offenders: Madras High Court
Denial of pay revision arrears: KGMCTA to continue it agitation
AIMPLB postpones ‘Bharat Bandh’ against waqf law 
TAGGED:Chennai Metro Railpublic servicepublic transportrailwaytransporttransport infrastructure
Share This Article
Facebook Email Print
Leave a Comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Follow US

Find US on Social Medias
FacebookLike
XFollow
YoutubeSubscribe
TelegramFollow

Weekly Newsletter

Subscribe to our newsletter to get our newest articles instantly!
[mc4wp_form]
Popular News

Modi government’s failure to condemn attacks on Iran shows betrayal of India’s civilisational values: Congress

Times Desk
Times Desk
March 21, 2026
On Christmas Day, Andhra Pradesh highlights welfare measures for Christians
Missing sheets in evaluated papers leave city’s Class 12 CBSE students in shock
Mixed response to T.N. govt.’s proposed SOP for public meetings, rallies, road shows
Stocks making the biggest moves premarket: NFLX, AMZN, LEN, GIS
- Advertisement -
Ad imageAd image
Global Coronavirus Cases

Confirmed

0

Death

0

More Information:Covid-19 Statistics
© INDIA TIMES NOW 2026 . All Rights Reserved.
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?