By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
India Times NowIndia Times NowIndia Times Now
Notification Show More
Font ResizerAa
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
    • Technology
    • Entertainment
    • The Escapist
    • Insider
    • Finance ₹
    • India News
    • Science
    • Health
Reading: Axis Energy bags EPC contract for 552 MWp solar project in Anantapur; commissioning in 18 months
Share
India Times NowIndia Times Now
Font ResizerAa
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
Search
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
    • Technology
    • Entertainment
    • The Escapist
    • Insider
    • Finance ₹
    • India News
    • Science
    • Health
Have an existing account? Sign In
Follow US

Home » Axis Energy bags EPC contract for 552 MWp solar project in Anantapur; commissioning in 18 months

India News

Axis Energy bags EPC contract for 552 MWp solar project in Anantapur; commissioning in 18 months

India Times Now Desk
Last updated: September 3, 2026 8:08 am
India Times Now Desk
Published: September 3, 2026
Share
SHARE


Designed to support the State’s peak power demand, the project will provide renewable power during peak periods, enhancing grid reliability and supporting the clean energy goals. Representative Photo

Designed to support the State’s peak power demand, the project will provide renewable power during peak periods, enhancing grid reliability and supporting the clean energy goals. Representative Photo
| Photo Credit: G.N. Rao

Axis Energy has secured the EPC contract for a 552 MWp utility-scale solar power project being developed by Evren, a joint venture between Brookfield and Axis Energy, in Anantapur district.

According to an official release, the project is targeted for commissioning in the next 18 months and marks a significant expansion of Axis Energy’s clean energy projects. The solar project is part of a 400 MW wind-solar hybrid renewable energy project, integrated with Battery Energy Storage Systems (BESS) and connected to the State grid.

Designed to support the State’s peak power demand, the project will provide renewable power during peak periods, enhancing grid reliability and supporting the clean energy goals. Axis Energy is also executing the EPC works for the project’s 640.5 MW wind component, which is under construction.

Commenting on the announcement, Axis Energy CEO Murali Surapaneni said the project strengthened the company’s long-standing partnership with Evren and was backed by long-term Power Purchase Agreements with the AP Southern Power Distribution Company Limited.

The integrated wind, solar and storage configuration enables more reliable utilisation of renewable power while helping manage intermittency and meet peak-demand requirements.

Published – September 03, 2026 01:38 pm IST



Source link

Mehbooba urges authorities to allow Muharram processions in Kashmir
Nehru made Kashmir issue controversial, India got extremism, separatism from there: Adityanath
Class 12 State Board exams: Tamil Nadu registers 95.2% pass rate
MHA calls next round of talks on Ladakh on October 6
From a ‘hopeless end’ to endless hope
TAGGED:400 mw wind solar bessanantapur district solar projectaxis energy epc contractaxis energy ventures india private limitedhybrid renewable project anantapur
Share This Article
Facebook Email Print
Leave a Comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Follow US

Find US on Social Medias
FacebookLike
XFollow
YoutubeSubscribe
TelegramFollow

Weekly Newsletter

Subscribe to our newsletter to get our newest articles instantly!
[mc4wp_form]
Popular News

Watch: Over 1.2 million join Cockroach Janta Party, says founder Abhijeet Dipke

India Times Now Desk
India Times Now Desk
May 30, 2026
Police intimidating pro-Left activists in ‘kafir screenshot’ case, says DYFI
Kathua fire guts two dozen hutments in J&K; forest fire sparks mine blasts in Rajouri
BSE SmallCap stock surges 17% following a deal with an Israel-based tech firm – Check details
PM SHRI set to be a tightrope walk for UDF government in Kerala
- Advertisement -
Ad imageAd image
Global Coronavirus Cases

Confirmed

0

Death

0

More Information:Covid-19 Statistics
© INDIA TIMES NOW 2026 . All Rights Reserved.
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?