By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
India Times NowIndia Times NowIndia Times Now
Notification Show More
Font ResizerAa
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
    • Technology
    • Entertainment
    • The Escapist
    • Insider
    • Finance ₹
    • India News
    • Science
    • Health
Reading: AP-Genco prioritises 24×7 power supply for agri farmers
Share
India Times NowIndia Times Now
Font ResizerAa
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
Search
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
    • Technology
    • Entertainment
    • The Escapist
    • Insider
    • Finance ₹
    • India News
    • Science
    • Health
Have an existing account? Sign In
Follow US

Home » AP-Genco prioritises 24×7 power supply for agri farmers

India News

AP-Genco prioritises 24×7 power supply for agri farmers

India Times Now Desk
Last updated: August 15, 2026 6:30 pm
India Times Now Desk
Published: August 15, 2026
Share
SHARE


VIJAYAWADA

Andhra Pradesh-Power Generation Corporation Limited (AP-Genco) Managing Director S. Nagalakshmi called upon officials, engineers, employees and staff of the power utilities to work collectively with dedication to further strengthen the State’s power sector and said providing daytime power supply to around 22.50 lakh agricultural consumers, ensuring uninterrupted supply to domestic, industrial and commercial consumers, was the government’s top priority.

Peak power demand

Participating as the chief guest in the 80th Independence Day celebrations at the Vidyut Soudha in Vijayawada on Saturday, Ms. Nagalakshmi said as the power demand was rising rapidly, the government took various steps to augment generation capacity and sustain power supply in the years ahead, while pointing out that the State recorded a peak power demand of 15,016 MW earlier this year on May 21, along with peak daily energy consumption of 288.92 million units.

Power generation increased from 77,640.55 Million Units (MU) in 2024-25 to 79,684.96 MU in 2025-26, while generation in the current financial year stood at 15,970.11 MU (till June). AP-Genco achieved a record generation of 6,009 MW earlier this year, on January 3, supported by improved coal supply and quality, timely financial support and operational efficiency.

To meet future energy requirements, AP-Genco has taken up a 15,680 MW capacity expansion programme, wherein the Lower Sileru expansion, Polavaram hydropower project and Upper Sileru Pumped Storage Project would play an important role.

Highlighting AP-Transco’s performance, Ms. Nagalakshmi said continuous digitalisation, modern monitoring systems and predictive maintenance measures resulted in a significant improvement in the efficiency of the transmission network. These sustained efforts helped bring down the transmission technical losses to 2.6% in 2025-26.

The government accorded high priority to solar, wind, pumped storage and battery energy storage projects, she said, adding that as of June 2026, renewable energy projects with a cumulative capacity of 112.45 Gigawatts had been allocated in the State.

Published – August 16, 2026 12:00 am IST



Source link

Telangana IAS transfers Dec 2025 | Srijana posted as GHMC Additional Commissioner
Magnitude 3.7 earthquake in Alluri District, gives tremors to residents in nearby Vizag city
Government reserves 85% PG medical seats for Telangana students
Hyderabad techie arrested in Vizag for burglaries during night; 699 grams of gold, 3.8 kg silver recovered
At BSP’s show of strength in Lucknow, Mayawati thanks BJP-led U.P. govt., targets SP
TAGGED:24x7 power supplyAndhra Pradesh newsAP-GencoRenewable Energy
Share This Article
Facebook Email Print
Leave a Comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Follow US

Find US on Social Medias
FacebookLike
XFollow
YoutubeSubscribe
TelegramFollow

Weekly Newsletter

Subscribe to our newsletter to get our newest articles instantly!
[mc4wp_form]
Popular News

Naveen Patnaik hails security personnel for killing six Maoists in Odisha

India Times Now Desk
India Times Now Desk
December 26, 2025
Kerala actor rape case timeline: From abduction to verdict
Telangana heatwave | CM urges people to take adequate precautions
Nine killed in boiler explosion at Chhattisgarh power plant
Bandh in Assam’s Kokrajhar over mentally-challenged woman’s rape; accused injured in police firing
- Advertisement -
Ad imageAd image
Global Coronavirus Cases

Confirmed

0

Death

0

More Information:Covid-19 Statistics
© INDIA TIMES NOW 2026 . All Rights Reserved.
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?