By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
India Times NowIndia Times NowIndia Times Now
Notification Show More
Font ResizerAa
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
    • Technology
    • Entertainment
    • The Escapist
    • Insider
    • Finance ₹
    • India News
    • Science
    • Health
Reading: HMDA calls bids for 8.75 km elevated corridor between Banjara Hills and Gachibowli
Share
India Times NowIndia Times Now
Font ResizerAa
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
Search
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
    • Technology
    • Entertainment
    • The Escapist
    • Insider
    • Finance ₹
    • India News
    • Science
    • Health
Have an existing account? Sign In
Follow US

Home » HMDA calls bids for 8.75 km elevated corridor between Banjara Hills and Gachibowli

India News

HMDA calls bids for 8.75 km elevated corridor between Banjara Hills and Gachibowli

India Times Now Desk
Last updated: September 10, 2026 8:06 pm
India Times Now Desk
Published: September 10, 2026
Share
SHARE


The Hyderabad Metropolitan Development Authority (HMDA) has invited bids for construction of an 8.75-km elevated corridor from the Integrated Command and Control Centre (ICCC) at Banjara Hills to the Shilpa Layout flyover road at an estimated cost of ₹1,334.87 crore.

The project, to be taken up under the Engineering, Procurement and Construction (EPC) turnkey system, will include survey, investigation, design and construction of the corridor, along with road widening and reconstruction works. The tender provides for a combination of four-lane and six-lane elevated sections, ramps and stretches of road at ground level.

The corridor will have a six-lane elevated section with provisions for entry and exit ramps at several locations. A space of about 200 metres by 20 metres has also been earmarked for possible future development of a viewing gallery.

HMDA has specified 24 months for completion of the project, including the monsoon period and shifting of utilities. Last date for bids is October 5. A pre-bid meeting is scheduled for September 22 at the office of the Chief Engineer, HMDA.

Published – September 11, 2026 01:36 am IST



Source link

Corporation mulling community kitchens to ensure food: Mayor
Telangana gets boost as Centre agrees to procure 8 lakh MTs more rice
Presidents appointed for 5 DCCs in Bengaluru
‘Fulfil poll promise on granting affiliation to Haryana schools’
Bail of all accused in Shuhaib murder case cancelled
TAGGED:Banjara Hills to Shilpa Layout corridorHMDA elevated corridor tenderHyderabad elevated corridorHyderabad infrastructure projects
Share This Article
Facebook Email Print
Leave a Comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Follow US

Find US on Social Medias
FacebookLike
XFollow
YoutubeSubscribe
TelegramFollow

Weekly Newsletter

Subscribe to our newsletter to get our newest articles instantly!
[mc4wp_form]
Popular News

AI171 crash probe: AAIB assessing various aspects; nothing has been ruled out, says source

India Times Now Desk
India Times Now Desk
January 30, 2026
Bihar polls: Congress working committee meeting to be held in Patna on September 24
Assembly approves Fire Service (Amendment) Bill, 2026
Guwahati unites in grief as fans pay last respects to Zubeen Garg
Rahul Gandhi flags issue of air pollution, seeks discussion in LS
- Advertisement -
Ad imageAd image
Global Coronavirus Cases

Confirmed

0

Death

0

More Information:Covid-19 Statistics
© INDIA TIMES NOW 2026 . All Rights Reserved.
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?