By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
India Times NowIndia Times NowIndia Times Now
Notification Show More
Font ResizerAa
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
    • Technology
    • Entertainment
    • The Escapist
    • Insider
    • Finance ₹
    • India News
    • Science
    • Health
Reading: Mudslip at Kuthiran in Kerala: Collector orders safety measures, continuous monitoring
Share
India Times NowIndia Times Now
Font ResizerAa
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
Search
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
    • Technology
    • Entertainment
    • The Escapist
    • Insider
    • Finance ₹
    • India News
    • Science
    • Health
Have an existing account? Sign In
Follow US

Home » Mudslip at Kuthiran in Kerala: Collector orders safety measures, continuous monitoring

India News

Mudslip at Kuthiran in Kerala: Collector orders safety measures, continuous monitoring

India Times Now Desk
Last updated: August 11, 2026 9:39 am
India Times Now Desk
Published: August 11, 2026
Share
SHARE


File image of a Kuthiran tunnel in Thrissur

File image of a Kuthiran tunnel in Thrissur
| Photo Credit: K K MUSTAFAH

The Thrissur District Disaster Management Authority (DDMA) has ordered a series of precautionary measures to ensure the safety of commuters following the recent surface mudslip near the Kuthiran twin tunnels on national highway 544 in Kerala

District Collector and DDMA chairperson Shikha Surendran issued the directions based on a preliminary report submitted by a team of scientists from the Kerala Forest Research Institute (KFRI), led by its director, Kannan C.S. Warrier.

The expert team, comprising scientists S. Sandeep, Pawan Wable and P. Balakrishnan, inspected the site after the Collector sought a scientific assessment of the slope.

According to the KFRI report, no major cracks or signs of deep-seated slope failure were detected. However, the scientists cautioned that continuous rainwater seeping through fissures in the steep rocky slope could dislodge loose rocks and soil, posing a risk of debris falling onto the highway.

Based on the report, the Collector directed the National Highways Authority of India (NHAI) to immediately remove loose rocks and soil from the slope and undertake permanent stabilisation measures. These include installing rockfall protection nets, safety fencing and rock-bolting systems to prevent boulders from falling onto the road.

The order also directs that vegetation on the upper slope should not be removed unnecessarily, as it helps prevent soil erosion. Blockages in drainage channels above the tunnel portals must be cleared immediately to prevent rainwater accumulation and reduce the risk of further slope instability.

The district administration has also ordered continuous monitoring of the hillside to detect fresh cracks, tilting trees or other signs of instability. Traffic restrictions should be imposed immediately if any emergency situation arises.

Detailed technical assessment

The NHAI project director has been directed to complete a detailed technical assessment through experts, implement slope stabilisation measures without delay and submit a compliance report.

The Divisional Forest Officer, Thrissur, has been instructed to extend full cooperation and provide necessary access to the NHAI and technical teams, as the affected hillside falls under the Forest Department’s jurisdiction.

The directions have been issued under the provisions of the Disaster Management Act as part of the district administration’s efforts to minimise the risk of further mudslips during the ongoing monsoon.

Published – August 11, 2026 03:09 pm IST



Source link

Forty students fall ill due to suspected food poisoning in Kasaragod
Anweshakaru troupe stages folk drama at Hyderabad’s Nadahabba celebrations
Pushing for transparency, social activist demands Ram Temple Trust to place documents in public domain
Karnataka’s Education Dept. to conduct story, poetry, essay competitions to utilise school libraries better
Caste survey sluggish as it resumes without teachers after festival break
Share This Article
Facebook Email Print
Leave a Comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Follow US

Find US on Social Medias
FacebookLike
XFollow
YoutubeSubscribe
TelegramFollow

Weekly Newsletter

Subscribe to our newsletter to get our newest articles instantly!
[mc4wp_form]
Popular News

Delhi air pollution: SC points to winter school break while hearing a plea to open primary classes, mid-day meal

India Times Now Desk
India Times Now Desk
December 17, 2025
Idukki records 70.26 % polling till 7 p.m. on December 9
Ranveer Singh’s Dhurandhar becomes most pirated Indian film in Pakistan despite official ban
Andhra Loyola College hosts women’s health awareness for International Women’s Day
Raichur MP raises concern over proposed Information Technology Act amendments
- Advertisement -
Ad imageAd image
Global Coronavirus Cases

Confirmed

0

Death

0

More Information:Covid-19 Statistics
© INDIA TIMES NOW 2026 . All Rights Reserved.
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?