By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
India Times NowIndia Times NowIndia Times Now
Notification Show More
Font ResizerAa
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
    • Technology
    • Entertainment
    • The Escapist
    • Insider
    • Finance ₹
    • India News
    • Science
    • Health
Reading: Chief Minister Naidu to inaugurate 21.77-km Seed Access Road on Amaravati August 13
Share
India Times NowIndia Times Now
Font ResizerAa
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
Search
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
    • Technology
    • Entertainment
    • The Escapist
    • Insider
    • Finance ₹
    • India News
    • Science
    • Health
Have an existing account? Sign In
Follow US

Home » Chief Minister Naidu to inaugurate 21.77-km Seed Access Road on Amaravati August 13

India News

Chief Minister Naidu to inaugurate 21.77-km Seed Access Road on Amaravati August 13

India Times Now Desk
Last updated: August 10, 2026 1:33 pm
India Times Now Desk
Published: August 10, 2026
Share
SHARE


A bird’s-eye view of a section of the 22.77-km-long Seed Access Road in Amaravati, Guntur district, Andhra Pradesh.

A bird’s-eye view of a section of the 22.77-km-long Seed Access Road in Amaravati, Guntur district, Andhra Pradesh.
| Photo Credit: G.N. RAO

The officials on Monday (August 10, 2026) announced that Chief Minister Nara Chandrababu Naidu will inaugurate the 21.77-km Seed Access Road and the MLA-MLC residential complexes in Amaravati on Thursday (August 13).

The Seed Access Road, a major sub-arterial road in the Amaravati capital region, is set to provide connectivity across the capital city by linking the N1 and N17 roads. The road, designated as E3, begins at Dondapadu and passes through Rayapudi, Venkatapalem, Penumaka, Undavalli, and Tadepalli before merging with NH-16 near Manipal Hospitals. It is being executed in three phases—E3 Phase-1 (14.35 km), Phase-2 (3.92 km), and Phase-3 (3.50 km)—with a 60-meter right-of-way throughout.

According to the information, phases 1 and 2 have a nine-lane carriageway, along with a central Bus Rapid Transit System (BRTS) and two 11-metre-wide service roads. Storm-water drains have been provided on both sides, while water supply, reuse, ICT and gas utilities are planned on the right-hand side and medium-voltage power and sewer lines on the left. Dedicated cycle tracks, sidewalks, green belts, and medians have also been incorporated into the design.

BRTS connectivity has already been opened to the public along the completed stretches from Dondapadu to Undavalli, adjoining the Karakatta Road near the ISKCON temple.

The phase-3 starts at the 18.270-km point and extends for 3.50 km to NH-16. To provide immediate access to the capital, the stretch includes a 280-metre major steel bridge, a 360-metre four-lane road, and a 110-metre steel bridge across the Buckingham Canal. The nine-lane road will continue at grade for 270 metres before transitioning into a six-lane elevated corridor up to NH-16.

Ahead of the Chief Minister’s visit, senior officials inspected the arrangements at the steel bridge area on Monday. ADC Chairperson and Managing Director D. Lakshmi Parthasarathi, Guntur Collector C.M. Saikanth Varma, SP Vakul Jindal, Joint Collector Ashutosh Srivastava, and APCRDA Additional Commissioner Kollabathula Karthik reviewed the works.

Officials also inspected beautification works at Buckingham Canal and ongoing works near the meeting venue, Guntur Channel, and Kondaveeti Vagu, directing staff to complete preparations expeditiously.

Published – August 10, 2026 07:02 pm IST



Source link

As Samriddhi Yatra ends in Bihar, Nitish promises more development
Opinion in President Reference is advisory while Supreme Court’s T.N. Governor case judgment is binding
Dhinakaran asks Vijay’s TVK to produce original letter of support claiming AMMK’s backing
Indian Army raises 16th ‘Bhairav’ Battalion at Maratha Light Infantry Centre in Belagavi
Centre’s citizenship scrutiny power is ‘limited’, Election Commission tells Supreme Court
TAGGED:Chief Minister Nara Chandrababu Naidu to inaugurate Amaravati's 21.77-km Seed Access Road linking N1 and N17 roads on August 13new road connecting N1-N15 in Amaravatinew road connectivity
Share This Article
Facebook Email Print
Leave a Comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Follow US

Find US on Social Medias
FacebookLike
XFollow
YoutubeSubscribe
TelegramFollow

Weekly Newsletter

Subscribe to our newsletter to get our newest articles instantly!
[mc4wp_form]
Popular News

Maharashtra ATS begins probe into Thane knife attack

India Times Now Desk
India Times Now Desk
April 28, 2026
Bengaluru-Mysuru highway toll hiked again after three months
Rs 33 Dividend Stock: Mahindra & Mahindra shares to trade ex-date this week, here's all you need to know
Much-awaited Yellow Line opens; auto fare hike, bike taxi ban add to commuter burden
200 bats die due to heatwave in Chhattisgarh’s Korba
- Advertisement -
Ad imageAd image
Global Coronavirus Cases

Confirmed

0

Death

0

More Information:Covid-19 Statistics
© INDIA TIMES NOW 2026 . All Rights Reserved.
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?