By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
India Times NowIndia Times NowIndia Times Now
Notification Show More
Font ResizerAa
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
    • Technology
    • Entertainment
    • The Escapist
    • Insider
    • Finance ₹
    • India News
    • Science
    • Health
Reading: Kochi Corporation orders probe into spending of ₹6.32 crore for streetlight maintenance in 2022-23
Share
India Times NowIndia Times Now
Font ResizerAa
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
Search
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
    • Technology
    • Entertainment
    • The Escapist
    • Insider
    • Finance ₹
    • India News
    • Science
    • Health
Have an existing account? Sign In
Follow US

Home » Kochi Corporation orders probe into spending of ₹6.32 crore for streetlight maintenance in 2022-23

India News

Kochi Corporation orders probe into spending of ₹6.32 crore for streetlight maintenance in 2022-23

India Times Now Desk
Last updated: July 17, 2026 2:44 am
India Times Now Desk
Published: July 17, 2026
Share
SHARE


CSML initially installed around 3,300 smart, energy-efficient lights three years ago, followed by another 40,000 under the Pan City LED Street Light project last year, at a total cost of over ₹35 crore. File.

CSML initially installed around 3,300 smart, energy-efficient lights three years ago, followed by another 40,000 under the Pan City LED Street Light project last year, at a total cost of over ₹35 crore. File.
| Photo Credit: The Hindu

The Kochi Corporation has spent ₹49.56 crore over the 14 years between 2011-12 and 2025-26 on the repair and maintenance of nearly 76,000 streetlights.

The UDF-led Corporation council has now ordered a probe into the expenditure of ₹6.32 crore incurred in the 2022-23 financial year during the tenure of the previous LDF council. This was ₹1.39 crore more than ₹4.92 crore, the second-largest spend during the period, recorded the very next year.

“We have asked the superintending engineer and the Additional Secretary to submit a report on the matter at the next council meeting. A survey will also be conducted to verify the number of LED lights that Cochin Smart Mission Limited [CSML] claimed to have installed under the City LED Street Light project last year and to assess the number of old lights that remain to be replaced,” said Mayor V.K. Minimol.

A report on the expenditure towards street light repair and maintenance was tabled at the council meeting on Wednesday (July 15, 2026).

Councillors across political lines have consistently criticised the alleged slackness in the operation and maintenance of LED lights installed by CSML. The agency initially installed around 3,300 smart, energy-efficient lights three years ago, followed by another 40,000 under the Pan City LED Street Light project last year, at a total cost of over ₹35 crore. Two separate agencies have since been entrusted with the operation and maintenance of these lights for five years, at the Corporation’s expense.

Incidentally, the maintenance cost of streetlights registered a dramatic fall from ₹4.28 crore in 2024-25 to a mere ₹4.29 lakh in 2025-26, coinciding with the launch of the Pan City LED Street Light project. “However, that does not reflect the operation and maintenance of those LED lights, which is now the Corporation’s responsibility,” Ms. Minimol clarified.

There remains no clarity on the number of old streetlights yet to be replaced. By rough estimates, the Corporation has about 76,000 streetlights, and after deducting the LED lights installed by CSML, some 30,000-odd conventional ones remain. These include a mix of CFL bulbs, tube lights, LED panels, and old steel tube panels.

“The biggest challenge in maintaining CSML’s LED lights is the dependence on the Kerala State Electricity Board [KSEB]. Often, the lights in an area fall under multiple transformers, all of which need to be switched off for maintenance. But KSEB officials often switch off only a few, leaving the work incomplete. Moreover, KSEB officials are unavailable between the 1st and 5th of every month as they would be busy with billing operations,” said Henry Austin, UDF councillor.

Published – July 16, 2026 08:03 pm IST



Source link

10 Manipur BJP MLAs fly to Delhi to meet party’s central leaders
India hands Apple a win by letting foreign firms fund equipment without tax risk
Kerala CM Pinarayi Vijayan slams Congress govt in Telangana over demolition drive in Khammam
Delhi HC to hear NIA’s plea for death penalty for Yasin Malik on April 22
India sustains progress in reducing child deaths amid slowing global gains, says new UN report
Share This Article
Facebook Email Print
Leave a Comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Follow US

Find US on Social Medias
FacebookLike
XFollow
YoutubeSubscribe
TelegramFollow

Weekly Newsletter

Subscribe to our newsletter to get our newest articles instantly!
[mc4wp_form]
Popular News

Tamil Nadu Social Justice Dept. raises food allowance for students in hostels, residential schools

India Times Now Desk
India Times Now Desk
October 24, 2026
Watch: The making of ‘atchu vellam’, an ingredient in sweet Pongal
Saving lives, property in monsoon is govt.’s priority, says Telangana Minister Ponguleti
Not one or two but Ranveer Singh’s Dhurandhar gears up for world TV premiere on three channels | Deets inside | Tv
1.35 lakh affected still affected by floods in Assam; 3 more deaths take toll to 85
- Advertisement -
Ad imageAd image
Global Coronavirus Cases

Confirmed

0

Death

0

More Information:Covid-19 Statistics
© INDIA TIMES NOW 2026 . All Rights Reserved.
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?