By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
India Times NowIndia Times NowIndia Times Now
Notification Show More
Font ResizerAa
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
    • Technology
    • Entertainment
    • The Escapist
    • Insider
    • Finance ₹
    • India News
    • Science
    • Health
Reading: Administrative and technical sanctions granted for NH-183 development project in Kerala
Share
India Times NowIndia Times Now
Font ResizerAa
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
Search
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
    • Technology
    • Entertainment
    • The Escapist
    • Insider
    • Finance ₹
    • India News
    • Science
    • Health
Have an existing account? Sign In
Follow US

Home » Administrative and technical sanctions granted for NH-183 development project in Kerala

India News

Administrative and technical sanctions granted for NH-183 development project in Kerala

India Times Now Desk
Last updated: June 10, 2026 1:39 pm
India Times Now Desk
Published: June 10, 2026
Share
SHARE


In a major infrastructure upgrade, administrative and technical sanctions have been granted for the development of National Highway-183, N.K. Premachandran, MP, has said. The Union Ministry of Road Transport and Highways approved the ambitious project following recommendations from the Financial Standing Committee, clearing the way for a total investment of ₹1,663.15 crore. The development will cover a 54.37-km stretch extending from the Kadavoor Bypass Junction in Kollam to Anjilimoodu near Chengannur.

The massive financial allocation breaks down into specific components to ensure comprehensive development. A budget of ₹689.20 crore is earmarked purely for civil works, while the critical phase of acquiring land receives ₹72.24 crore and an additional ₹259.40 crore allocation. Dismantling existing structures and buildings along the route will utilise ₹394.19 crore, with the remaining funds accounting for future maintenance and mandatory statutory expenses including GST. Executed under the engineering, procurement, and construction (EPC) model, the project averages an investment of ₹30.59 crore per km.

The project aims for a swift 24-month completion timeline with a structured phased spending model spanning multiple financial years. The Ministry has authorised the expenditure of up to 50% of the total budget, amounting to ₹821.41 crore, during the 2026-27 financial year, escalating to 70% or ₹1149.97 crore in 2027-28, and reaching the full 100% target of ₹1642.82 crore by 2028-29. Long-term maintenance funding is securely mapped out past the initial completion, with allocations of ₹4.07 crore for 2030-31, ₹8.13 crore for 2031-32, ₹12.20 crore for 2032-33, and the final ₹20.33 crore in 2033-34.

The highway will be a 20-meter wide, four-lane stretch featuring paved shoulders. The engineering blueprint also has three major bridges, six minor bridges, 103 culverts, a railway overbridge, and two vehicular underpasses. Passenger and drainage infrastructure are also receiving a major boost with the construction of 48 bus stands and 88.81 kilometers of roadside drainage systems. The entire 54-kilometer stretch will feature advanced signage, solar LED blinkers, reinforced cement concrete New Jersey crash barriers, medium mast lighting, and high-mast lighting installations at key points.

To ensure seamless traffic flow, the project will simultaneously upgrade 16 major and 18 minor intersections. The major intersections designated for massive expansion include Kollam Bypass, Prakkulam, Mukkada, Potayimukku Pereyam, Kundara Chittumala, Bharanikavu (two spots), Chakkuvalli, Charummoodu, Kottamukku, Nallumukku, Mankuzhy, Iravankara, Mavelikara, Ponnukara, and Anjilimoodu. Meanwhile, smaller junctions like Thannikkamukku, Kundara Alind Ground Chittumala, Moonnumukku, Kadappuzha, Punnamoodu, Ookkanmukku, Thekkemuri Sooranad, Kannamam, Aanayadi, Vayyankara, Chavadi, Gurunathankulangara, Chunakkara, Nalumukku, Chirayil, Kodukulanji, and Panippurapadi will also undergo modernisation.

Published – June 10, 2026 07:09 pm IST



Source link

Lessons from the 1970s help U.S. and global economies absorb oil shocks
Supreme Court finds ‘no good reason’ to entertain pleas for ‘hate speech’ FIR against Assam CM
Fire breaks out at BSNL office on Anna Salai in Chennai
Mandya Deputy Commissioner directs officials to stop sewage from entering Cauvery
Eye screening camp held for retired defence personnel
Share This Article
Facebook Email Print
Leave a Comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Follow US

Find US on Social Medias
FacebookLike
XFollow
YoutubeSubscribe
TelegramFollow

Weekly Newsletter

Subscribe to our newsletter to get our newest articles instantly!
[mc4wp_form]
Popular News

Fisherman drowns off Anakapalli coast; search on for six missing off Visakhapatnam

India Times Now Desk
India Times Now Desk
July 6, 2026
ED raids multiple locations in Keralam in hybrid ganja smuggling money-laundering case
Fisherfolk in Machilipatnam reel under livelihood loss due to cyclone
3 September, 2026 Stock Market Updates: Sensex jumps 154 points, Nifty near 24,000 as oil prices hold steady
Man allegedly kills woman, turns critical himself as families oppose marriage in Rajamahendravaram
- Advertisement -
Ad imageAd image
Global Coronavirus Cases

Confirmed

0

Death

0

More Information:Covid-19 Statistics
© INDIA TIMES NOW 2026 . All Rights Reserved.
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?