By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
India Times NowIndia Times NowIndia Times Now
Notification Show More
Font ResizerAa
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
    • Technology
    • Entertainment
    • The Escapist
    • Insider
    • Finance ₹
    • India News
    • Science
    • Health
Reading: Centre willing to proceed with HMR Phase II on 50:50 cost-sharing basis: Khattar
Share
India Times NowIndia Times Now
Font ResizerAa
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
Search
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
    • Technology
    • Entertainment
    • The Escapist
    • Insider
    • Finance ₹
    • India News
    • Science
    • Health
Have an existing account? Sign In
Follow US

Home » Centre willing to proceed with HMR Phase II on 50:50 cost-sharing basis: Khattar

India News

Centre willing to proceed with HMR Phase II on 50:50 cost-sharing basis: Khattar

Times Desk
Last updated: May 20, 2026 10:27 am
Times Desk
Published: May 20, 2026
Share
SHARE


Contents
  • Comprehensive examination of DPR
  • 39 STPs sanctioned to treat wastewater flowing into Musi
Telangana government has already submitted proposals for the second-phase expansion of the HMR, covering 162 km.

Telangana government has already submitted proposals for the second-phase expansion of the HMR, covering 162 km.
| Photo Credit: NAGARA GOPAL

The Centre has, in-principle, raised no objection to Phase II of the Hyderabad Metro Rail (HMR) project and is willing to proceed on a 50:50 cost-sharing basis with the Telangana government, Union Minister for Housing and Urban Affairs Manohar Lal Khattar said on Wednesday (May 20, 2026).

According to an official release, Mr. Khattar conveyed this assurance to Union Minister for Coal and Mines G. Kishan Reddy, who is also Secunderabad MP, during a meeting in New Delhi.

Mr. Khattar noted that the Telangana government has already submitted proposals for the second-phase expansion of the HMR, covering 162 km. He assured that the Centre would give the proposal “positive consideration” and initiate “necessary further measures”.

Union Minister for Coal and Mines G. Kishan Reddy with Union Minister for Housing and Urban Affairs Manohar Lal Khattar said on Wednesday (May 20, 2026).

Union Minister for Coal and Mines G. Kishan Reddy with Union Minister for Housing and Urban Affairs Manohar Lal Khattar said on Wednesday (May 20, 2026).
| Photo Credit:
BY ARRANGEMENT

Comprehensive examination of DPR

The meeting also reviewed key aspects of the Phase II project. Mr. Khattar indicated that, since the State government has taken over the project from L&T, the Centre would undertake a comprehensive examination of the Detailed Project Report (DPR) and other technical specifications. The remaining components of Phase II would be considered once the DPR and relevant information are received, following which an appropriate decision would be taken.

39 STPs sanctioned to treat wastewater flowing into Musi

The Ministers also conducted a joint review of major urban development initiatives underway in Hyderabad, particularly those related to the sanitation and rejuvenation of the Musi River. Mr. Khattar stated that under the Centre’s AMRUT 2.0 scheme, 39 sewage treatment plants (STPs) were sanctioned to treat wastewater flowing into the Musi. The projects have a total estimated cost of ₹3,975 crore.

These STPs will have a combined capacity to treat 972 million litres of sewage per day. The initiative is expected to prevent untreated wastewater from entering the river, while significantly contributing to its conservation and improving the city’s overall sanitation standards.

Mr. Khattar reiterated that the Centre is extending full cooperation for Hyderabad’s development and infrastructure enhancement. Mr. Reddy expressed his gratitude for the support, the release added.

Published – May 20, 2026 01:59 pm IST



Source link

LPG shortage crisis: T.N. CM Stalin urges PM Modi for necessary alternative arrangements
Lloyd’s List Intelligence opens center in Chennai
This will lead to situation far worse than colonial era: Akhilesh Yadav on SIR
Historic shift: Vijay’s Cabinet marks Tamil Nadu’s best SC representation till date
Pakistan must be held accountable for its horrific human rights violations: India on crackdown on protesters in PoK
TAGGED:expansion of Hyderabad MetroHyderabad Metro newsHyderabad Metro Rail expansionHyderabad Metro Rail phase IIpublic transport in Hyderabad
Share This Article
Facebook Email Print
Leave a Comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Follow US

Find US on Social Medias
FacebookLike
XFollow
YoutubeSubscribe
TelegramFollow

Weekly Newsletter

Subscribe to our newsletter to get our newest articles instantly!
[mc4wp_form]
Popular News

SIT report on Gogoi’s ‘Pak links’ to be sent to Centre after adding Rawalpindi trip details: Himanta

Times Desk
Times Desk
February 11, 2026
Telangana will not compromise on its rightful share of Krishna and Godavari waters, says CM on Praja Palana Dinotsavam
Oracle stock booms 40%, on pace for best day since 1992
Minister’s ‘exclusion’ from PM’s event: LDF holds parallel inauguration of NH-66 Ramanattukara-Vengalam stretch in Kerala’s Kozhikode
Suriya applauds Aditya Dhar’s vision, showers praise on Akshaye Khanna; Dhurandhar director reacts
- Advertisement -
Ad imageAd image
Global Coronavirus Cases

Confirmed

0

Death

0

More Information:Covid-19 Statistics
© INDIA TIMES NOW 2026 . All Rights Reserved.
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?