
The Mumbai-Pune Expressway ‘Missing Link’ project is seen in Mumbai, Maharashtra, on May 1, 2026.
| Photo Credit: PTI
The Mumbai-bound carriageway of the Mumbai-Pune Expressway connecting link was opened to vehicular traffic on Saturday noon (May 2, 2026) after a delay caused by the dismantling of inauguration infrastructure and cleaning work, a day after the Pune section became operational.
The 13.3 km-long “missing link”, which bypasses a section of the Bhor Ghat stretch of the expressway and cuts travel time between Mumbai and Pune by 25 to 30 minutes, was inaugurated a day earlier by Chief Minister Devendra Fadnavis in the presence of Deputy CMs Eknath Shinde and Sunetra Pawar.
Published – May 02, 2026 02:32 pm IST


