By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
India Times NowIndia Times NowIndia Times Now
Notification Show More
Font ResizerAa
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
    • Technology
    • Entertainment
    • The Escapist
    • Insider
    • Finance ₹
    • India News
    • Science
    • Health
Reading: Historic 743-year old Kalingarayan aqueduct in Erode to be razed to make way for new structure
Share
India Times NowIndia Times Now
Font ResizerAa
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
Search
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
    • Technology
    • Entertainment
    • The Escapist
    • Insider
    • Finance ₹
    • India News
    • Science
    • Health
Have an existing account? Sign In
Follow US

Home » Historic 743-year old Kalingarayan aqueduct in Erode to be razed to make way for new structure

India News

Historic 743-year old Kalingarayan aqueduct in Erode to be razed to make way for new structure

Times Desk
Last updated: February 2, 2026 9:25 am
Times Desk
Published: February 2, 2026
Share
SHARE


The Kalingarayan aqueduct constructed across Perumpallam Canal in Erode

The Kalingarayan aqueduct constructed across Perumpallam Canal in Erode
| Photo Credit: M. Govarthan

The 743-year-old Kalingarayan Canal aqueduct across the Perumpallam canal in Erode city, believed to be the first aqueduct in the State, will be demolished, as it has become structurally unsafe, paving the way for the construction of a new structure. Materials from the original structure would be preserved to highlight the engineering excellence of Kalingarayan, the Kongu chieftain and an early pioneer of river interlinking in the 13th century.

The Kalingarayan Anicut and canal system, recognised as a World Heritage Irrigation Structure by the International Commission on Irrigation and Drainage (ICID) in 2021, is among the oldest water diversion projects in the country and continues to irrigate 15,743 acres in Erode district. Kalingarayan, the ruler of Poondurai Nadu in Kongu Nadu, constructed a barrage across the Bhavani river at Kalingarayanpalayam, from where water is diverted into a 91.10-km-long canal that joins the Noyyal river at Kodumudi. The project was executed between 1270 and 1282.

The 41-metre-long aqueduct with 14 vents was built at Karai Vaikkal across the Perumpallam canal. Scottish physician and surveyor Francis Buchanan, who visited Erode in 1800, described the canal as an outstanding engineering work in his book A Journey from Madras through the Countries of Mysore, Canara and Malabar, published in 1807.

Repair attempts

Researcher and author K. Banuchandar said the aqueduct had undergone several renovations during the British period, including works by engineer C.E. Faber in 1833.

Leakages from the structure had increased over the years, and repeated repair attempts failed, leaving replacement as the only viable option.

The researcher, however, has called for the preservation of the historic aqueduct, describing it as a heritage structure that should be declared a monument. He said that instead of demolishing the aqueduct, a new structure could be constructed parallel to it, as adequate space is available at the site. Farmers, history enthusiasts and local residents have also urged the government to protect the aqueduct, stressing that its demolition would lead to the erasure of a significant part of the region’s history.

The Water Resources Department (WRD), through Government Order No. 39 dated July 24, 2025, approved renovation works for the canal from mile 12-3-348 to mile 15-4.5-195 at an estimated cost of ₹83.30 crore. The project includes the demolition of the existing aqueduct and construction of a new one.

A WRD official said irrigation water supply through the canal would be stopped on March 31, 2026, and the works would begin on April 1, 2026. The new aqueduct will have five vents to ensure uninterrupted flow in the Perumpallam canal, the official added.

Published – February 02, 2026 02:24 pm IST



Source link

Panel sets deadline for Meghalaya govt. to stop ‘faceless’ illegal coal trade
Karnataka bars treatment of private in-patients by government doctors
‘Red alert’ in Bengaluru: City gripped by IPL final fever as RCB looks for second consecutive win
Putin’s India visit LIVE: Russian President to meet PM Modi today
More than six lakh devotees expected for ‘Bhavani Deeksha Viramana’: Collector
TAGGED:erode newsirrigationKalingarayan aqueduct
Share This Article
Facebook Email Print
Leave a Comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Follow US

Find US on Social Medias
FacebookLike
XFollow
YoutubeSubscribe
TelegramFollow

Weekly Newsletter

Subscribe to our newsletter to get our newest articles instantly!
[mc4wp_form]
Popular News

Gita Press works not for profit but to shape generations, says Amit Shah

Times Desk
Times Desk
January 21, 2026
Should corruption charges need prior sanction? | Explained
Uttarakhand gurdwara standoff: Two Nihang Sikhs step down, negotiations ongoing with others
A big disappointment for Karnataka says Minister
Centre forms expert panel on healthcare for transgender persons
- Advertisement -
Ad imageAd image
Global Coronavirus Cases

Confirmed

0

Death

0

More Information:Covid-19 Statistics
© INDIA TIMES NOW 2026 . All Rights Reserved.
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?