By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
India Times NowIndia Times NowIndia Times Now
Notification Show More
Font ResizerAa
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
    • Technology
    • Entertainment
    • The Escapist
    • Insider
    • Finance ₹
    • India News
    • Science
    • Health
Reading: Hyderabad high-speed rails | Work on final locational surveys for two corridors in progress
Share
India Times NowIndia Times Now
Font ResizerAa
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
Search
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
    • Technology
    • Entertainment
    • The Escapist
    • Insider
    • Finance ₹
    • India News
    • Science
    • Health
Have an existing account? Sign In
Follow US

Home » Hyderabad high-speed rails | Work on final locational surveys for two corridors in progress

India News

Hyderabad high-speed rails | Work on final locational surveys for two corridors in progress

India Times Now Desk
Last updated: February 2, 2026 7:56 am
India Times Now Desk
Published: February 2, 2026
Share
SHARE


Contents
  • Length of two corridors
  • Maximum speed of 350 kmph
Work on final locational surveys for two of high-speed corridors connecting Hyderabad has begun. The image is used for representative purposes only.

Work on final locational surveys for two of high-speed corridors connecting Hyderabad has begun. The image is used for representative purposes only.
| Photo Credit: SIDDHANT THAKUR

The proposed high‑speed rail corridors between Hyderabad and Pune, Bengaluru and Chennai are likely to be elevated and will follow an entirely new alignment, independent of the existing railway lines, top railway sources said on Sunday (February 1, 2026).

Length of two corridors

South Central Railway (SCR) has already begun work on the final locational surveys for two of these corridors — the 626‑km Hyderabad–Bengaluru route and the 705‑km Hyderabad–Chennai route — some time ago. These surveys are being carried out by RITES, the sources said.

Separately, the National High Speed Rail Corporation Limited (NHSRCL) has already conducted an independent survey for the Hyderabad–Mumbai high‑speed rail link a year or so ago.

“Railway Minister Ashwini Vaishnaw has indicated in the press conference that the high‑speed rail connectivity will first be established between Mumbai–Pune and subsequently Pune–Hyderabad. In essence, this will ensure a direct high‑speed link from Hyderabad to Mumbai, though finer details are expected to emerge later,” one senior official said, requesting anonymity.

Maximum speed of 350 kmph

The trains are proposed to run at a maximum speed of 350 kmph, with an operational speed of 320 kmph. They will use standard‑gauge tracks similar to metro systems, and most of the technology and systems are expected to mirror those being used in the ongoing Ahmedabad–Mumbai ‘Bullet Train’ project.

According to the officials, the plan aims to cut travel time between Hyderabad and Bengaluru to around 1 hour 55 minutes and to Chennai to about 2.5 hours.

Among the seven high-speed rail corridors announced in Union Budget 2026-27, three connect Hyderabad to other cities

Among the seven high-speed rail corridors announced in Union Budget 2026-27, three connect Hyderabad to other cities
| Photo Credit:
THE HINDU

Published – February 01, 2026 09:14 pm IST



Source link

Kavitha claims money in BRS accounts is from quid pro quo deals
CBSE makes third language mandatory for Class IX from July 1
Researchers at IIT-M and Ohio State University develop AI framework that mimics real-time chemical synthesis
Rahul Gandhi targets Amit Shah in Lok Sabha over police action against student protesters
Attack on CJI Gavai ‘a dangerous assault on idea of constitutional morality’, say rights groups urging suo motu response
TAGGED:Hyderabad high-speed rail corridorsHyderabad-Bengaluru high-speed trainHyderabad-Chennai high-speed trainHyderabad-Pune trainlength of high-speed rail corridors from Hyderabad
Share This Article
Facebook Email Print
Leave a Comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Follow US

Find US on Social Medias
FacebookLike
XFollow
YoutubeSubscribe
TelegramFollow

Weekly Newsletter

Subscribe to our newsletter to get our newest articles instantly!
[mc4wp_form]
Popular News
EntertainmentMovieMusic

Dhurandhar 2 box office collection: Did Ranveer Singh’s sequel dethrone Baahubali 2? Know here

India Times Now Desk
India Times Now Desk
April 27, 2026
Medical student dies 3 days after being run over by 2 youths
Kerala actor rape case: State govt to appeal verdict acquitting Dileep
Despite zoonotic diseases threat, Keralam’s proposed veterinary public health wing yet to take shape
A.P., U.K. sign MoU to strengthen urban infrastructure, develop Amaravati as liveable capital
- Advertisement -
Ad imageAd image
Global Coronavirus Cases

Confirmed

0

Death

0

More Information:Covid-19 Statistics
© INDIA TIMES NOW 2026 . All Rights Reserved.
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?