By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
India Times NowIndia Times NowIndia Times Now
Notification Show More
Font ResizerAa
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
    • Technology
    • Entertainment
    • The Escapist
    • Insider
    • Finance ₹
    • India News
    • Science
    • Health
Reading: Thane–Kalyan Suburban Rail Corridors: Mumbai’s lifeline may get 7th, 8th rail lines
Share
India Times NowIndia Times Now
Font ResizerAa
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
Search
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
    • Technology
    • Entertainment
    • The Escapist
    • Insider
    • Finance ₹
    • India News
    • Science
    • Health
Have an existing account? Sign In
Follow US

Home » Thane–Kalyan Suburban Rail Corridors: Mumbai’s lifeline may get 7th, 8th rail lines

BusinessStartup

Thane–Kalyan Suburban Rail Corridors: Mumbai’s lifeline may get 7th, 8th rail lines

India Times Now Desk
Last updated: December 16, 2025 11:52 am
India Times Now Desk
Published: December 16, 2025
Share
SHARE


The proposed lines form part of a broader strategy to separate suburban and long-distance rail traffic, aligned with the planned expansion of Lokmanya Tilak Terminus (LTT) and the development of a new terminus at Parel.

Mumbai:

Due to the heavy congestion of the 10.8 km-long Thane–Kalyan stretch, the Central Railway (CR) is required to consider fresh plans aimed at expanding track capacity on one of Mumbai’s busiest suburban corridors. The issue is one of CR’s biggest operational challenges, with nearly 1,000 trains passing through this section every day. Along with this, other stations, such as Kalyan, Diva, and Thane, act as major interchange hubs for lakhs of commuters.

7th and 8th rail lines 

In order to address these bottlenecks, the Hindustan Times reports that the Central Railways has started studies aimed at laying the 7th and 8th rail lines on the Kalyan–Thane–Parel corridor. Additionally, underground alignments in parts of Dombivli are also being kept under the scheme of things.

The appointment of a third-party agency has been made to conduct a final location survey (FLS), which emerges as a crucial step to determine the exact alignment, along with engineering details of the proposed tracks.

A CR official says, “It has been a few weeks since FLS studies began,” adding, “We are in the first phase, looking at the new rail lines to come up on the Kalyan-Thane corridor, which is heavily congested.” 

1.2 to 1.5 million passengers commute on a daily basis

As Mumbai’s metropolitan region continues to expand, the need for expansion is extremely acute. According to some estimates, a total of approximately 1.2 to 1.5 million passengers commute on a daily basis along the Thane–Kalyan route.

Notably, Diva has emerged as a pressure point, as 70–75 per cent of the 894 daily local services make halts there. Given frequent train stoppages, repeated closures of the Diva level crossing, which disrupts both rail and road traffic, have become a common phenomenon. 

Another CR official was quoted as saying, “There are a few stretches, especially before and after Dombivli, where we are examining the possibility of going underground. All of these will be clear in the FLS study, which we expect to be ready by mid-2026.”

The proposed lines form part of a broader strategy to separate suburban and long-distance rail traffic, aligned with the planned expansion of Lokmanya Tilak Terminus (LTT) and the development of a new terminus at Parel.

ALSO READ | 3 Post Office schemes that offer better returns than bank FDs: Check full details inside





Source link

Union Budget 2026: Key economic milestone that shaped the Indian economy
Govt withdraws domestic airfare cap, here’s what it means for flyers and airlines: Full details
Are 50-paise coins still valid? Here’s what Reserve Bank of India said – Full details
Tamil Nadu Budget 2026 LIVE updates: Finance Minister Marie Wilson presents Vijay government’s maiden Budget
‘AI set to restructure banking operations, threatens jobs in the industry as automation gains traction’
TAGGED:7th8thCentral RailwaycorridorslifelinelinesMumbai suburban railwayMumbaisrailsuburbanThane Kalyan Suburban RailThaneKalyan
Share This Article
Facebook Email Print
Leave a Comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Follow US

Find US on Social Medias
FacebookLike
XFollow
YoutubeSubscribe
TelegramFollow

Weekly Newsletter

Subscribe to our newsletter to get our newest articles instantly!
[mc4wp_form]
Popular News

City students shine in international essay competitions

India Times Now Desk
India Times Now Desk
May 28, 2026
Self-reliance in defence is crucial for India’s strategic autonomy: Defence Secretary
CPI resolute in its stance on PM SHRI; CPI(M) to assuage hurt sentiments
Kollam fully equipped for monsoon: Collector
Kerala CM promises new models beyond PPP to make real estate developers part of State’s growth
- Advertisement -
Ad imageAd image
Global Coronavirus Cases

Confirmed

0

Death

0

More Information:Covid-19 Statistics
© INDIA TIMES NOW 2026 . All Rights Reserved.
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?