By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
India Times NowIndia Times NowIndia Times Now
Notification Show More
Font ResizerAa
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
    • Technology
    • Entertainment
    • The Escapist
    • Insider
    • Finance ₹
    • India News
    • Science
    • Health
Reading: Work begins on ‘Alappuzha- A Global Water Wonderland’ project
Share
India Times NowIndia Times Now
Font ResizerAa
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
Search
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
    • Technology
    • Entertainment
    • The Escapist
    • Insider
    • Finance ₹
    • India News
    • Science
    • Health
Have an existing account? Sign In
Follow US

Home » Work begins on ‘Alappuzha- A Global Water Wonderland’ project

India News

Work begins on ‘Alappuzha- A Global Water Wonderland’ project

India Times Now Desk
Last updated: October 24, 2025 1:04 pm
India Times Now Desk
Published: October 24, 2025
Share
SHARE


Contents
  • ₹24.25 crore allocated
  • Soft intervention

Work on the first phase of ‘Alappuzha- A Global Water Wonderland’ project under the Swadesh Darshan 2.0 scheme has begun. The project aims to transform Alappuzha beach, canals, and backwaters into an iconic global tourist destination. It is being implemented at a cost of ₹93.17 crore.

The work of strengthening the banks of the Vellappally–Shavakkotta canal and deepening the canal has started. Survey procedures on the beach stretch have been completed and piling work will begin soon. At the Punnamada Finishing Point, load testing for construction and preparatory steps for piling have already commenced.

The State government has designated Kerala Tourism Infrastructure Limited as the nodal agency for the project implementation.

₹24.25 crore allocated

The beachfront development, which envisions an ecologically sensitive upgrade of the area, includes the construction of promenade walkways, parking lots, seating spaces, lighting, landscaping, spaces for events, an Indian Coast Guard station, outdoor sports courts and waste management facilities, among other amenities. A sum of ₹24.25 crore has been allocated for the project.

The canal-side transformation aims to restore and revitalise the historic canals of Alappuzha town, reintroducing them as vibrant public spaces while preserving their ecological and cultural significance. Planned works include walkways, seating, lighting, plazas, boat docks, cafes and boat jetty development. A sum of ₹37 crore has been set aside for the project.

An international cruise terminal with parking, marina, experience centre, information kiosks, water adventure zone, restaurant, and toilets will come up at Punnamada Finishing Point at a cost of ₹8.5 crore.

Soft intervention

A sum of ₹4 crore has been earmarked for ‘soft intervention,’ including cultural and heritage integration, community engagement, environmental sustainability, digital and smart tourism initiatives, training programmes, first aid and waste management.

The project is expected to be completed by February 2026.

Published – October 24, 2025 06:34 pm IST



Source link

Andhra Pradesh SSC supplementary exam hall tickets available for downloading
Bengaluru, a city gridlocked and stranded
Onion glut triggers price crash in Dindigul wholesale market
Fire breaks out in Ministry of Education office; firefighting operations underway
Monsoon tracker LIVE | Orange alert issued in Delhi
Share This Article
Facebook Email Print
Leave a Comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Follow US

Find US on Social Medias
FacebookLike
XFollow
YoutubeSubscribe
TelegramFollow

Weekly Newsletter

Subscribe to our newsletter to get our newest articles instantly!
[mc4wp_form]
Popular News
EntertainmentMovieMusic

Dhurandhar 2 OTT: Ranveer Singh’s sequel will also release on Netflix after Jio Hotstar? Know here

India Times Now Desk
India Times Now Desk
May 17, 2026
Party support for Independent candidate, an election strategy in which Jayalalithaa succeeded and MGR failed
NEET UG 2026 cancelled: Fresh exam to be conducted following paper leak allegations
CM raises concern over Indo-US trade deal
Container Road remains dark, after installing 1,100 lights
- Advertisement -
Ad imageAd image
Global Coronavirus Cases

Confirmed

0

Death

0

More Information:Covid-19 Statistics
© INDIA TIMES NOW 2026 . All Rights Reserved.
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?