By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
India Times NowIndia Times NowIndia Times Now
Notification Show More
Font ResizerAa
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
    • Technology
    • Entertainment
    • The Escapist
    • Insider
    • Finance ₹
    • India News
    • Science
    • Health
Reading: Booth-less toll fee collection at Tamil Nadu’s Paranur: how does the multi-lane free flow system work?
Share
India Times NowIndia Times Now
Font ResizerAa
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
Search
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
    • Technology
    • Entertainment
    • The Escapist
    • Insider
    • Finance ₹
    • India News
    • Science
    • Health
Have an existing account? Sign In
Follow US

Home » Booth-less toll fee collection at Tamil Nadu’s Paranur: how does the multi-lane free flow system work?

India News

Booth-less toll fee collection at Tamil Nadu’s Paranur: how does the multi-lane free flow system work?

India Times Now Desk
Last updated: October 2, 2026 10:54 am
India Times Now Desk
Published: October 2, 2026
Share
SHARE


Contents
  • Why the shift to MLFF?
  • How does MLFF work?
  • What should a vehicle user do?
  • e-notices
  • Suspension of FASTag
  • e-notice grievance redressal
  • Road safety measures

The Paranur toll plaza on the Chennai-Tiruchi National Highway, on September 30, 2026, became Tamil Nadu’s first booth-less facility to collect toll fee from road users through the multi-lane free flow (MLFF) system.

MLFF, an advanced contactless and barrierless tolling system, eliminates the need for vehicles to stop at toll plazas by using advanced technologies based on FASTag, radio-frequency identification (RFID) technology, and ANPR technology for seamless electronic toll collection.

Why the shift to MLFF?

The primary factor is uninterrupted traffic flow. Vehicles no longer need to stop or slow down at toll plazas, thus leading to smoother traffic movement and reduced congestion.

Second, operational efficiency and cost savings. Reduced reliance on toll booth infrastructure and manpower results in lower operating costs.

And finally, environmental benefits. Smoother traffic flow reduces vehicular idling, cutting down emissions and contributing to cleaner air near tolling points.

How does MLFF work?

While conventional fee plazas rely on physical booths, gates, and lane infrastructure, under the MLFF system, high-performance RFID readers detect the FASTag affixed on vehicles at high speeds. At the same time, ANPR cameras capture license plate data while radar and LiDAR systems accurately detect and classify vehicles.

MLFF equipment creates a toll transaction by reading the FASTag as well as the vehicle number plate and deducts the fee from the FASTag. It also captures evidence of vehicles where payment fails. The MLFF system works across all weather and lighting conditions, round the clock.

MLFF thus delivers a fast, transparent, and high-integrity revenue process replacing the traditional toll collection system that cause delays and frustration.

What should a vehicle user do?

A road user should maintain an active FASTag with sufficient balance, ensuring clearly visible HSRP license plates.

e-notices

Vehicles without the tags or with insufficient balance will be issued challans. If a vehicle fails to pay the applicable user fee while crossing an MLFF plaza, an electronic notice or e-notice shall be issued for recovery of the unpaid fee. As per Rule 14 of the National Highway Fee Determination of Rates and Collection Rules 2008, e-notice will be sent via SMS to the registered mobile number of the vehicle owner, as per Vaahan database, and also to the mobile number linked to the FASTag of the vehicle, as per issuer bank’s records.

e-notice amount shall be twice the applicable user fee. However, if payment is made within 72 hours of issuance, a 50% discount shall apply. After 72 hours, the road user shall be required to pay the full e-notice amount.

Suspension of FASTag

If the road user takes no action within the stipulated time period, related Vaahan services such as NOC, Transfer of Ownership, National Permit, and Fitness Certification will be restricted as per CMVR 1989. Until all e-notices are cleared, the FASTag will remain suspended and will be non-functional at all toll plazas, including State fee plazas and parking facilities across India.

e-notice grievance redressal

Any aggrieved road user may raise a grievance along with supporting evidence through the NIC portal within 72 hours of issuance of e-notice, following which the grievance is forwarded to the fee plaza or bank for review and necessary action.

The fee plaza will have five days to review the grievance and either accept or reject it. If the fee plaza takes no action within the stipulated time, the claim of the fee plaza to the unpaid user fee shall cease and the grievance will be automatically deemed accepted in favor of road user.

If the grievance is accepted, the e-notice will be revoked, but if rejected, the road user shall have to pay the e-notice amount.

Road safety measures

NHAI’s Project Implementation Unit (PIU) will ensure there is proper illumination at the MLFF equipment location, which will enhance the efficiency of the equipment and associated toll revenue with it. Other road safety aspects like closure of medians, illumination at the existing toll plaza, road marking, and signages, will be thoroughly examined.

As the MLFF tolling involves high-speed movement of the vehicles near the MLFF toll plazas as in the case of other sections of the highway, NHAI will ensure the MLFF toll plaza, gantry location, etc., are thoroughly audited by the road safety auditor of the PIU.

Published – October 02, 2026 04:24 pm IST



Source link

CM’s stand on delimitation justified: Jagga Reddy
Deepavali fireworks worsen Delhi’s air quality
Beed mother runs to win prize money for daughters’ education
Mob attacks BSF vehicle in Tripura town, troops injured
Tamil Nadu Speaker bans prior publication of issues to be raised under Rule 55 and 56 of Assembly
TAGGED:booth less toll collection paranurfastag paranurHighwaysmulti-lane free flow system paranurParanur toll plazatoll tamil nadu automated
Share This Article
Facebook Email Print
Leave a Comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Follow US

Find US on Social Medias
FacebookLike
XFollow
YoutubeSubscribe
TelegramFollow

Weekly Newsletter

Subscribe to our newsletter to get our newest articles instantly!
[mc4wp_form]
Popular News

Challenges in Telangana’s Indiramma houses construction, dilapidated housing societies in Hyderabad raised in Assembly

India Times Now Desk
India Times Now Desk
September 10, 2026
Concern over Odisha’s deteriorating air quality
Yash’s Toxic to release in English in India with a shorter cut, know when to watch it in theatres
India no longer a country that suffers, will strike back if Pakistan provokes us again: Rajnath Singh
TTD approves ₹5,456.26 crore budget for 2026-27 financial year
- Advertisement -
Ad imageAd image
Global Coronavirus Cases

Confirmed

0

Death

0

More Information:Covid-19 Statistics
© INDIA TIMES NOW 2026 . All Rights Reserved.
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?