By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
India Times NowIndia Times NowIndia Times Now
Notification Show More
Font ResizerAa
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
    • Technology
    • Entertainment
    • The Escapist
    • Insider
    • Finance ₹
    • India News
    • Science
    • Health
Reading: Locals symbolically ‘open’ Bengaluru Metro Pink Line, demand early launch
Share
India Times NowIndia Times Now
Font ResizerAa
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
Search
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
    • Technology
    • Entertainment
    • The Escapist
    • Insider
    • Finance ₹
    • India News
    • Science
    • Health
Have an existing account? Sign In
Follow US

Home » Locals symbolically ‘open’ Bengaluru Metro Pink Line, demand early launch

India News

Locals symbolically ‘open’ Bengaluru Metro Pink Line, demand early launch

India Times Now Desk
Last updated: September 28, 2026 7:13 pm
India Times Now Desk
Published: September 28, 2026
Share
SHARE


In a unique protest, residents along Bannerghatta Road on Monday (September 28) symbolically “inaugurated” the Bengaluru Metro Pink Line by cutting a ribbon, demanding the early opening of the elevated section.

The protest came as the Bangalore Metro Rail Corporation Ltd. (BMRCL) missed its September-end target for opening the 7.5-km elevated stretch between Kalena Agrahara and Tavarekere. BMRCL is currently awaiting the necessary inspection by the Commissioner of Metro Railway Safety (CMRS) before the section can be opened.

“We have been hearing about the opening date for months, but the deadline keeps getting pushed. We cut the ribbon symbolically to highlight the delay and the need to make the line operational at the earliest,” a local resident said.

Greater Bengaluru Development Minister Krishna Byre Gowda inspected the corridor on September 2 and said the civil and elevated works were ready. He had earlier indicated that the stretch could open once the required approvals from the Centre were received.

The opening schedule has changed several times. Mr. Gowda had initially announced August 15, 2026, as the target for the elevated section and said the remaining underground section between Tavarekere and Nagawara was expected to be completed by March 2027.

The 21.3-km Pink Line comprises 7.5 km of elevated track and 13.8 km underground. The underground section will connect Dairy Circle, M.G. Road, Shivajinagar and Tannery Road, providing a north-south link through central Bengaluru.

Published – September 29, 2026 12:43 am IST



Source link

BJP poised for power in Telangana as people show Bengal-like enthusiasm: Modi
Two police personnel confess to extortion in Bengaluru’s Whitefield
Notice issued to Prashant Kishor over name in voter lists of Bihar, Bengal
Das Adam Smith Problem: rethinking Smith’s moral and economic worlds
Myanmar assures India that its territory will not be used against India
TAGGED:Bengalurukarnatakapink line
Share This Article
Facebook Email Print
Leave a Comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Follow US

Find US on Social Medias
FacebookLike
XFollow
YoutubeSubscribe
TelegramFollow

Weekly Newsletter

Subscribe to our newsletter to get our newest articles instantly!
[mc4wp_form]
Popular News

QuantM: A game-changer for milk safety and farmer livelihoods

India Times Now Desk
India Times Now Desk
September 26, 2025
Government urged to improve sports infrastructure in State
Bengaluru cop dies in road accident in Madhya Pradesh during cybercrime probe
Our early warning systems are not luxury but strategic investments, says India at G20 meet on disaster risk reduction
Kochi Corporation gives KMRL 10 days to fix clogged drains, potholed roads, and traffic snarls
- Advertisement -
Ad imageAd image
Global Coronavirus Cases

Confirmed

0

Death

0

More Information:Covid-19 Statistics
© INDIA TIMES NOW 2026 . All Rights Reserved.
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?