By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
India Times NowIndia Times NowIndia Times Now
Notification Show More
Font ResizerAa
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
    • Technology
    • Entertainment
    • The Escapist
    • Insider
    • Finance ₹
    • India News
    • Science
    • Health
Reading: Union Cabinet approves ₹24,815 crore multi-tracking projects across 15 districts in U.P., Andhra Pradesh
Share
India Times NowIndia Times Now
Font ResizerAa
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
Search
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
    • Technology
    • Entertainment
    • The Escapist
    • Insider
    • Finance ₹
    • India News
    • Science
    • Health
Have an existing account? Sign In
Follow US

Home » Union Cabinet approves ₹24,815 crore multi-tracking projects across 15 districts in U.P., Andhra Pradesh

India News

Union Cabinet approves ₹24,815 crore multi-tracking projects across 15 districts in U.P., Andhra Pradesh

India Times Now Desk
Last updated: September 18, 2026 3:24 am
India Times Now Desk
Published: September 18, 2026
Share
SHARE


The Union Cabinet on Saturday (April 18, 2026) approved two multi-tracking projects covering 15 districts across Uttar Pradesh and Andhra Pradesh at an estimated cost of ₹24,815 crore, thus increasing the existing Indian Railways network by about 601 km. 

The project is slated to be completed by 2030-31. 

The multi-tracking proposals seek to streamline operations and alleviate congestion. 

In Uttar Pradesh, the Ghaziabad-Sitapur third and fourth lines, covering 403 km, have been approved. Ghaziabad-Sitapur is an existing double line section forming a key part of the Delhi-Guwahati high-density network. The project, estimated at approximately ₹14,926 crore, is crucial for improving connectivity between the northern and eastern regions of the country.

The existing line capacity utilisation of the section is up to 168% and is projected to be up to 207% in case the project is not taken up.

Also Read: 25 years on, Konaseema Railway Line project yet to get on track

The line transverses through Ghaziabad, Hapur, Amroha, Moradabad, Rampur, Bareilly, Shahjahanpur, Lakhimpur Kheri, and Sitapur districts of Uttar Pradesh, as well as major industrial centres – Ghaziabad (machinery, electronics, and pharmaceuticals); Moradabad (brassware and handicrafts); Bareilly (furniture, textiles, and engineering); Shahjahanpur (carpets and cement-related industries); and Roza (thermal power plant).

For seamless transportation, the project bypasses the congested stations of Hapur, Simbhaoli, Moradabad, Rampur, Bareilly, Shahjahanpur, and Sitapur, and accordingly, six new stations are proposed on the bypassing sections.

Places of interest along or near the project are the Dudheshwarnath temple, the Garhmukteshwar Ganga ghat, the Dargah Shah Wilayat Jama Masjid (Amroha), and Naimisharanya (Sitapur), among others.

An additional freight traffic of 35.72 million tonnes per annum, including coal, foodgrains, chemical fertilizers, and finished steel, is anticipated. This will lead to a logistics cost saving of about ₹2,877.46 crore every year vis-à-vis road transportation, officials said.

In Andhra Pradesh, the Rajahmundry (Nidadavolu)-Visakhapatnam (Duvvada) third and fourth lines, covering 198 km, have been approved at an estimated cost of about ₹9,889 crore. 

The Rajahmundry (Nidadavolu)-Visakhapatnam (Duvvada) section forms part of the Howrah-Chennai high-density network. The proposed project is part of the quadrupling initiative of the Howrah-Chennai high-density network route.

The project traverses through East Godavari, Konaseema, Kakinada, Anakapalle, and Vishakapatnam districts of Andhra Pradesh.

Of these, the Visakhapatnam district is part of the ‘Aspirational Districts’ programme. It provides connectivity to major ports along the east coast of India, including Visakhapatnam itself, as well as Gangavaram, Machilipatnam, and Kakinada.

The project route runs along the eastern coastline and is among the busiest, predominantly freight-orientated sections of the East Coast rail corridor.

The line capacity utilisation of the section has already reached up to 130%, leading to frequent congestion and operational delays. The line capacity is expected to increase further due to a proposed expansion of ports and industries in the region.

The project section includes a 4.3 km rail bridge over the Godavari river, a 2.67 km viaduct, and three bypasses. The new alignment is about 8 km shorter than the existing route, improving connectivity and operational efficiency.

The proposed section will also boost tourism by improving access to several destinations, including Annavaram, Antarvedi, and Draksharamam.

An additional freight traffic of 29.04 million tonnes per annum, including coal, cement, chemical manure, iron and steel, foodgrains, containers, bauxite, gypsum, and limestone, is anticipated on the route. This will lead to a logistics cost saving of ₹1,150.56 crore annually vis-à-vis road transportation, according to Indian Railways officials.

Published – April 18, 2026 10:51 pm IST



Source link

Vizag data centre is a major challenge
Two traffickers held – The Hindu
Ajit Pawar's son shares video alleging VSR Ventures owner slept in pilot’s seat; demands arrest
Modi pitches 33% reservation to win over women voters in West Bengal
India no longer a country that suffers, will strike back if Pakistan provokes us again: Rajnath Singh
TAGGED:Howrah–Chennai High Density Networknew railway lines for Andhranew railway lines for Uttar pradeshrail projects in UPrailway line between Rajahmundry and Visakhapatnam
Share This Article
Facebook Email Print
Leave a Comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Follow US

Find US on Social Medias
FacebookLike
XFollow
YoutubeSubscribe
TelegramFollow

Weekly Newsletter

Subscribe to our newsletter to get our newest articles instantly!
[mc4wp_form]
Popular News

ISRO sanctions ₹20-lakh research grant to VVIT University

India Times Now Desk
India Times Now Desk
November 13, 2025
Congress against Assam’s development, wants youths to join militancy, alleges Himanta
IT stock gains over 3% on signing MoU with GCIB, Afro Mobile SARL for digital infrastructure in Africa
Tasmac shuts 150 outlets in three days; salesmen face challenges from customers
How three Keralam nuns stitched together clothing venture ‘Stand By Me’ in a struggle for survival after standing up against the Church
- Advertisement -
Ad imageAd image
Global Coronavirus Cases

Confirmed

0

Death

0

More Information:Covid-19 Statistics
© INDIA TIMES NOW 2026 . All Rights Reserved.
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?