By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
India Times NowIndia Times NowIndia Times Now
Notification Show More
Font ResizerAa
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
    • Technology
    • Entertainment
    • The Escapist
    • Insider
    • Finance ₹
    • India News
    • Science
    • Health
Reading: Kochi metro needs 17 more train rakes for Kakkanad, airport extensions
Share
India Times NowIndia Times Now
Font ResizerAa
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
Search
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
    • Technology
    • Entertainment
    • The Escapist
    • Insider
    • Finance ₹
    • India News
    • Science
    • Health
Have an existing account? Sign In
Follow US

Home » Kochi metro needs 17 more train rakes for Kakkanad, airport extensions

India News

Kochi metro needs 17 more train rakes for Kakkanad, airport extensions

India Times Now Desk
Last updated: September 4, 2026 5:03 pm
India Times Now Desk
Published: September 4, 2026
Share
SHARE


At present, the metro system operates a total of 25 rakes on the 27-km Aluva-Thripunithura Blue Line.

At present, the metro system operates a total of 25 rakes on the 27-km Aluva-Thripunithura Blue Line.
| Photo Credit: H. VIBHU

Kochi Metro Rail Limited (KMRL) would require a total of 17 more train rakes, keeping in mind the expected completion of the metro’s 11.20-km Pink Line to Kakkanad by August 2027 and the metro’s subsequent approximately 19-km airport extension, according to metro officials.

At present, the metro system operates a total of 25 rakes (including the standby ones) on the 27-km Aluva-Thripunithura Blue Line, with each rake having three coaches.

While 17 more rakes would be needed to ensure operational frequency of approximately one train every six to seven minutes in both the proposed extensions, the availability of between five to eight rakes would enable trains to maintain this frequency in the upcoming Pink Line. Else, the headway on the line might have to be increased to a train every 10 to 11 minutes. At least 10 more trains would be needed if trains were to operate every three minutes as in the Delhi metro, officials said.

A decision on procuring the trains would be taken on the basis of expected passenger demand and other parameters like availability of depot space. Keeping the airport extension in mind and a bulk of international flights operating from here during late night hours, metro trains would have to be operated from between midnight to 5 a.m. as well (during which time the metro does not operate services now). The metro agency has, in the meantime, dropped plans to build an underground metro station at the airport in order to ensure seamless entry to the airport, it is learnt.

People’s representatives, NGOs, and others have stepped up their demand to extend the metro beyond the international airport to the Angamaly railway station. A decision on this will be taken in consultation with the State government, metro sources said.

Published – September 04, 2026 10:33 pm IST



Source link

What is ‘analogue’ paneer, which the Chhattisgarh, Maharashtra and Gujarat govts have banned
Kerala Chief Minister condemns rendering of RSS anthem at Vande Bharat inauguration
Cricket gives special dimension to India-Trinidad and Tobago ties: Jaishankar
Naidu orders 5000 temples in two years using Srivani funds and temple town development plans
Third language row: Demand for clarification from Karnataka Education Department
Share This Article
Facebook Email Print
Leave a Comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Follow US

Find US on Social Medias
FacebookLike
XFollow
YoutubeSubscribe
TelegramFollow

Weekly Newsletter

Subscribe to our newsletter to get our newest articles instantly!
[mc4wp_form]
Popular News

Operation D-Hunt: Kollam City police arrest 968 persons in 2025

India Times Now Desk
India Times Now Desk
December 10, 2025
From resale value to longevity, Reia Diamonds CEO Prapanjj SK Kota explains everything about lab-grown diamonds
Omar Abdullah condemns attack on SAD leader Sukhbir Singh Badal
Naveen Patnaik expresses strong displeasure over alleged violation of model code of conduct
31 private engineering colleges ‘illegally charging’ additional fees: PAAP
- Advertisement -
Ad imageAd image
Global Coronavirus Cases

Confirmed

0

Death

0

More Information:Covid-19 Statistics
© INDIA TIMES NOW 2026 . All Rights Reserved.
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?