By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
India Times NowIndia Times NowIndia Times Now
Notification Show More
Font ResizerAa
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
    • Technology
    • Entertainment
    • The Escapist
    • Insider
    • Finance ₹
    • India News
    • Science
    • Health
Reading: Mumbai to get 238 new AC local trains early as Railways fast-tracks production, first rake expected by 2027
Share
India Times NowIndia Times Now
Font ResizerAa
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
Search
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
    • Technology
    • Entertainment
    • The Escapist
    • Insider
    • Finance ₹
    • India News
    • Science
    • Health
Have an existing account? Sign In
Follow US

Home » Mumbai to get 238 new AC local trains early as Railways fast-tracks production, first rake expected by 2027

BusinessStartup

Mumbai to get 238 new AC local trains early as Railways fast-tracks production, first rake expected by 2027

India Times Now Desk
Last updated: August 12, 2026 4:46 pm
India Times Now Desk
Published: August 12, 2026
Share
SHARE


Contents
  • Which railway production units will manufacture 238 AC rakes?
  • Work underway to expand Mumbai’s suburban rail network
  • Also Read 
Mumbai:

Mumbai’s wait for a larger fleet of air-conditioned suburban trains is set to be shortened by several years, with the Railways deciding to manufacture the 238 additional AC local rakes approved for the city will now be manufactured simultaneously at three railway production units.

The parallel production strategy is aimed at accelerating the expansion and modernisation of Mumbai’s suburban rail network. Under the revised plan, the first AC rake could be delivered as early as 2027, with the entire fleet of 238 rakes targeted for completion by 2030.

The procurement process for the additional AC rakes had already been initiated. However, a review of the expected timelines with technical partners revealed that the serial delivery of the rakes could take approximately three years. Under the earlier timeline, the first rake was expected to be available only by 2030, while the entire fleet could have taken until 2034 to be delivered. Given the crucial role of Mumbai’s suburban railway network, often described as the city’s lifeline, the Railways has now opted for simultaneous production at three facilities to fast-track the deliveries and make the additional AC services available to commuters sooner.

Which railway production units will manufacture 238 AC rakes?

These 238 AC rakes will now be manufactured simultaneously at three railway production units:

  • Integral Coach Factory (ICF), Chennai
  • Rail Coach Factory (RCF), Kapurthala
  • Modern Coach Factory (MCF), Rae Bareli

Work underway to expand Mumbai’s suburban rail network

The government is also working extensively to expand the capacity of Mumbai’s suburban rail network. An investment of approximately Rs 22,000 crore is being made on capacity expansion projects such as new corridors, additional rail lines, platform expansion for 15-coach trains, and yard remodeling.

According to Vilas S Wadekar, Chairman and Managing Director of the Mumbai Railway Vikas Corporation (MRVC), the plan is to introduce AC rakes in a coordinated manner with the launch of new corridors, additional rail lines, and other capacity-enhancing projects. The aim is to comprehensively improve Mumbai’s suburban rail services as quickly as possible and provide Mumbaikars with the convenience of AC local trains.

According to MRVC, this strategy of parallel expansion of network capacity and rapid induction of 238 AC rakes will play a vital role in making Mumbai’s suburban rail system safer, more comfortable, and more efficient.

Also Read 

India’s first Vande Bharat freight train begins its technical trials, attains top speed of 145 km/h

India gets its first hydrogen train in big clean energy leap: Know route, fare and other details





Source link

BSE-listed NBFC stock gains as company incorporates wholly-owned subsidiary into digital payments ecosystem | Markets
Shares under Rs 60 in focus as company makes investment in Dubai, check details here
Sensex gains 273 points, Nifty ends volatile session above 24,300, auto stocks rally
5,000% return in 3 years: FMCG shares in focus post key board decisions, check full details here
Sensex, Nifty rebound after sharp correction in previous session, Eternal, Airtel among top gainers | Markets
TAGGED:AC local trainsearlyexpectedfasttracksindian railwaysLocallocal AC trainsMumbaiMumbai localMumbai suburban trainsproductionRailwaysraketrains
Share This Article
Facebook Email Print
Leave a Comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Follow US

Find US on Social Medias
FacebookLike
XFollow
YoutubeSubscribe
TelegramFollow

Weekly Newsletter

Subscribe to our newsletter to get our newest articles instantly!
[mc4wp_form]
Popular News

Assembly elections 2026 LIVE: ECI deploys over 1,000 Central observers for upcoming Assembly polls

India Times Now Desk
India Times Now Desk
March 18, 2026
Kerala Assembly polls: K. Sudhakaran returns to Kannur; T.O. Mohanan set to launch campaign
DRDO Chairman highlights efforts to boost India’s defence research capacity
Delhi to Dehradun in just 2 hours: Nitin Gadkari shares update on opening of Delhi–Dehradun Expressway
From Awadh to Bengal: Old Lucknow to come alive in Kolkata this month
- Advertisement -
Ad imageAd image
Global Coronavirus Cases

Confirmed

0

Death

0

More Information:Covid-19 Statistics
© INDIA TIMES NOW 2026 . All Rights Reserved.
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?