By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
India Times NowIndia Times NowIndia Times Now
Notification Show More
Font ResizerAa
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
    • Technology
    • Entertainment
    • The Escapist
    • Insider
    • Finance ₹
    • India News
    • Science
    • Health
Reading: Varanasi to get relief from traffic jams as Cabinet approves Ganga, Varuna elevated corridors: Details | Business
Share
India Times NowIndia Times Now
Font ResizerAa
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
Search
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
    • Technology
    • Entertainment
    • The Escapist
    • Insider
    • Finance ₹
    • India News
    • Science
    • Health
Have an existing account? Sign In
Follow US

Home » Varanasi to get relief from traffic jams as Cabinet approves Ganga, Varuna elevated corridors: Details | Business

BusinessStartup

Varanasi to get relief from traffic jams as Cabinet approves Ganga, Varuna elevated corridors: Details | Business

Times Desk
Last updated: July 15, 2026 10:27 am
Times Desk
Published: July 15, 2026
Share
SHARE


New Delhi:

The Union Cabinet on Wednesday approved a mega road project for Varanasi, which includes an 89-kilometre elevated road network along the rivers Ganga and Varuna. According to the information shared, the elevated corridors will be developed under the Hybrid Annuity Model (HAM). The Hybrid Annuity Model (HAM) is a public-private partnership (PPP) framework used by the Government of India (primarily by the NHAI) to build national highways. The two highway projects, approved by the Cabinet Committee on Economic Affairs (CCEA), chaired by Prime Minister Narendra Modi, will be built with a total investment of nearly Rs 25,500 crore.

Elevated corridor along river Varuna  

The 43-kilometre-long elevated corridor along the banks of the Varuna River will be 6/4 lanes and is expected to cost Rs 10,998 crore. This project will connect NH-31 to the Varanasi Ring Road and will include the construction of flyovers, loops, ramps, and service roads along the main carriageway. 

Elevated corridor along river Ganga  

The other project is a 46-kilometre, six-lane elevated corridor along the river Ganga, costing Rs 14,448 crore. This project will connect NH-19 in Varanasi and Chandauli districts with the Varanasi Ring Road.

The project will include the construction of a 6-lane elevated main road, along with an iconic cable-stayed bridge, extradosed foot overbridge-cum-major bridge, loops, ramps, link roads, and service roads. Upon completion, traffic congestion on NH-19 (Prayagraj-Varanasi), BHU-Ramnagar Road, and NH-35 (Varanasi-Mirzapur) will be significantly reduced. 

Varanasi receives approximately 150 million tourists and pilgrims each year, and these projects will play a vital role in reducing the growing traffic congestion within the city. The project’s biggest advantage will be reducing the average travel time for vehicles in this affected area from approximately 60 minutes to just 20 minutes. 

Cabinet approves Semicon Mission 2.0

The Union Cabinet has also cleared Rs 1.27 lakh crore for the second edition of India Semiconductor Mission, IT Minister Ashwini Vaishnaw said. The government expects the new scheme to attract investments of around Rs 4 lakh crore and lead to semiconductor production worth Rs 2 lakh crore during the scheme period.

“Semicon 2.0 will have six pillars. The first pillar will be the design of chips,” he added. The minister said that the programme will focus on design, development and production of indigenous chips.

ALSO READ | 55-km-long elevated corridor along Ring Road to ease traffic in Delhi, check full details here





Source link

Zojila Tunnel, linking J&K with Ladakh, set to achieve a major milestone on June 9 | Markets
What happens if jewellery gets stolen from bank locker? Know your rights, rules and compensation options
What are the implications when property is passed to heirs – All you need to know
No more barriers at toll plazas, electronic toll system to enhance user experience: Details here
Mr. Arora is Building More Than an HR Company – He is Building a New Business Mindset
TAGGED:approvesBusinessCabinetcorridorsdetailselevatedGangajamsrelieftrafficVaranasiVarunavaruna corridor
Share This Article
Facebook Email Print
Leave a Comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Follow US

Find US on Social Medias
FacebookLike
XFollow
YoutubeSubscribe
TelegramFollow

Weekly Newsletter

Subscribe to our newsletter to get our newest articles instantly!
[mc4wp_form]
Popular News
BusinessStartup

Sensex falls over 100 points, Nifty settles below 24,400, Trent tumbles 12% post Q1 business update | Markets

Times Desk
Times Desk
July 7, 2026
Heavy rain batters Odisha; IMD says more in store, districts on alert
Karnataka urges Centre’s intervention in evacuation of those stranded in West Asia
Former Rajya Sabha member lauds Modi’s leadership
BJP slams denial of permission for RSS route march in Chittapur
- Advertisement -
Ad imageAd image
Global Coronavirus Cases

Confirmed

0

Death

0

More Information:Covid-19 Statistics
© INDIA TIMES NOW 2026 . All Rights Reserved.
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?