By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
India Times NowIndia Times NowIndia Times Now
Notification Show More
Font ResizerAa
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
    • Technology
    • Entertainment
    • The Escapist
    • Insider
    • Finance ₹
    • India News
    • Science
    • Health
Reading: Mumbai Railway Vikas Corporation plans suburban rail tunnels to decongest city, free up prime land
Share
India Times NowIndia Times Now
Font ResizerAa
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
Search
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
    • Technology
    • Entertainment
    • The Escapist
    • Insider
    • Finance ₹
    • India News
    • Science
    • Health
Have an existing account? Sign In
Follow US

Home » Mumbai Railway Vikas Corporation plans suburban rail tunnels to decongest city, free up prime land

BusinessStartup

Mumbai Railway Vikas Corporation plans suburban rail tunnels to decongest city, free up prime land

India Times Now Desk
Last updated: September 26, 2025 1:37 pm
India Times Now Desk
Published: September 26, 2025
Share
SHARE


One of the major links likely to be transformed into an underground facility is the Churchgate–Mumbai Central section, a 5 km corridor.

Mumbai:

The problem of traffic congestion is synonymous with metro cities in India, and Mumbai is no exception. To tackle the issue of traffic congestion in India’s financial capital, the Mumbai Railway Vikas Corporation Ltd. (MRVC) has commissioned a feasibility study aimed at examining the possibility of transforming some portion of South Mumbai’s busiest suburban rail stretches into underground alignments.

According to a Free Press Journal report, the study to be undertaken in collaboration with Central and Western Railways will delve deep into the possibility of easing congestion as well as effectively unlocking prime railway land for better use.

Churchgate–Mumbai Central Section

One of the major links likely to be transformed into an underground facility is the Churchgate–Mumbai Central section, a 5 km corridor. It can be turned into an underground facility before reconnecting at Mumbai Central.

Along with this, a separate study will also assess the construction of two more suburban lines, running between CSMT and Parel. It’ll be a stretch of around 8 km.

Interchange Hub At Byculla

An interchange hub at Byculla is also being planned. The need for private land acquisition is likely to be eliminated since the proposed alignment is expected to be developed entirely on railway-owned land. The study’s focus will involve critical issues, including freeing up valuable land parcels in South Mumbai and decongesting the city’s suburban network, as well as ensuring better integration with other modes of transport.

The study will also refer to international best practices from top destinations like New York, London, and Tokyo. These destinations are known for combining underground and surface corridors with ease.

It will also focus on undertaking a comparative analysis of tunnel systems, which includes assessing the efficiency of twin-bore versus multiple single-bore designs.

The study will also evaluate construction methods, determining the safest and most practical path forward.

A detailed cost–benefit and financial feasibility assessment will evaluate the project’s expenses in relation to its potential long-term economic benefits.





Source link

Three-day bank strike postponed after meeting between bank association and unions
NSE-listed smallcap pharma stock gains 10% despite market sell-off: Check share price and other details
Healthcare stock gains nearly 6% after expansion update, check share price and other details
India to get 100 new airports in next 10 years, government plans to spend nearly Rs 30,000 crore
BEL Share Price: Defence PSU stock falls over 2% post quarterly results
TAGGED:cityCorporationdecongestfreelandMRVCMumbaiMumbai Railway Vikas CorporationplansprimerailrailwaysuburbantunnelsVikas
Share This Article
Facebook Email Print
Leave a Comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Follow US

Find US on Social Medias
FacebookLike
XFollow
YoutubeSubscribe
TelegramFollow

Weekly Newsletter

Subscribe to our newsletter to get our newest articles instantly!
[mc4wp_form]
Popular News

Navi Mumbai airport to offer free high-speed Wi-Fi, digital-first passenger communication

India Times Now Desk
India Times Now Desk
December 21, 2025
Tamil Nadu Assembly election: CPI (M) accepts five-seat offer, signs pact with DMK
Bihar SIR hearing LIVE: Supreme Court to hear pleas first time after release of final electoral rolls
Three killed, four injured as speeding car crashes into truck in MP’s Guna district
13-year-old school girl dies of heart attack in Uttara Kannada
- Advertisement -
Ad imageAd image
Global Coronavirus Cases

Confirmed

0

Death

0

More Information:Covid-19 Statistics
© INDIA TIMES NOW 2026 . All Rights Reserved.
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?