By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
India Times NowIndia Times NowIndia Times Now
Notification Show More
Font ResizerAa
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
    • Technology
    • Entertainment
    • The Escapist
    • Insider
    • Finance ₹
    • India News
    • Science
    • Health
Reading: Kochi Bypass project gets a fillip with Central nod
Share
India Times NowIndia Times Now
Font ResizerAa
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
Search
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
    • Technology
    • Entertainment
    • The Escapist
    • Insider
    • Finance ₹
    • India News
    • Science
    • Health
Have an existing account? Sign In
Follow US

Home » Kochi Bypass project gets a fillip with Central nod

India News

Kochi Bypass project gets a fillip with Central nod

India Times Now Desk
Last updated: June 21, 2026 3:54 pm
India Times Now Desk
Published: June 21, 2026
Share
SHARE


The Centre has sanctioned a 50-km-long, eight-lane wide greenfield corridor linking Aroor on NH 66 with Angamaly on NH 544.

The Centre has sanctioned a 50-km-long, eight-lane wide greenfield corridor linking Aroor on NH 66 with Angamaly on NH 544.
| Photo Credit: File Photo

The long-overdue Kochi Bypass project has got a fillip, with the Centre sanctioning a 50-km-long, eight-lane-wide greenfield corridor linking Aroor on NH 66 with Angamaly on NH 544.

This would enable inter-district and other vehicles to avoid the congested and accident-prone Aroor-Edapally NH 66 Bypass, the Edapally-Angamaly NH 544 stretch, and the more than a dozen bottlenecked junctions along the route, saving considerable time and fuel.

The Kochi Bypass had been mooted a decade ago as a 44-km-long, six-lane-wide corridor linking Nettoor on the NH 66 Bypass with Karayamparambu, located north of Angamaly. The project remained mired in uncertainty following the expiry of its 3A notification in 2024.

“A fresh 3A notification for the proposed eight-lane-wide NH project would be issued shortly. The Centre has permitted the acquisition of land at a width of 70 metres (as compared to the earlier 45-metre-wide NH proposal). This would enable hewing out an eight-lane-wide stretch, which could further be widened to ten lanes in the project’s second phase,” said Benny Behanan, MP, while attributing the delay in kicking off the project’s construction to the slow pace of land acquisition during the term of the LDF government.

This further resulted in the traffic survey report conducted five years ago for the six-lane Kochi Bypass project becoming outdated. This necessitated a fresh traffic survey, which cited the need for an eight-lane corridor, considering the massive increase in inter-State, inter-district, and intra-district vehicular traffic, added Mr. Behanan, who had raised the demand for the project multiple times in the Lok Sabha.

While stating that the proposed Kochi Bypass would be eight lanes wide, NHAI sources said that further details of the project are awaited.

The decision to extend the alignment from Nettoor to Aroor has, in turn, raised questions about the trumpet-shaped flyover that the NHAI had mulled at Nettoor. A smaller version of the butterfly-shaped cloverleaf flyover, the trumpet flyover was to cater to traffic pouring into Nettoor from the NH Bypass, the Kochi Bypass, and the Kochi Port Connectivity NH.

Published – June 21, 2026 09:24 pm IST



Source link

A.P. CM unveils plan to position Amaravati as quantum hardware hub
Arunachal Pradesh State Election Commission introduces on-the-spot voting facility for personnel engaged in civic poll duty
Karnataka Chief Minister Siddaramaiah receives caste survey report
3rd Corps of EME Sailing Regatta concludes in Hyderabad
Inhalable microplastics, a hidden toxin worsening Indian cities’ air
TAGGED:Kochi Bypass project gets a fillip with Central nod
Share This Article
Facebook Email Print
Leave a Comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Follow US

Find US on Social Medias
FacebookLike
XFollow
YoutubeSubscribe
TelegramFollow

Weekly Newsletter

Subscribe to our newsletter to get our newest articles instantly!
[mc4wp_form]
Popular News

Personal barbs, communal overtones mark Jubilee Hills bypoll campaign

India Times Now Desk
India Times Now Desk
November 8, 2025
Kannada film ‘Love Mocktail 3’ preponed after ‘Toxic’ delay
Amendments made to industrial land allotment regulations in Keralam
Two workers killed in explosion at illegal fireworks unit in Sivakasi
Akshay Kumar’s Bhooth Bangla release date postponed, makers cite Dhurandhar Part 2 box office; early previews planned
- Advertisement -
Ad imageAd image
Global Coronavirus Cases

Confirmed

0

Death

0

More Information:Covid-19 Statistics
© INDIA TIMES NOW 2026 . All Rights Reserved.
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?