By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
India Times NowIndia Times NowIndia Times Now
Notification Show More
Font ResizerAa
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
    • Technology
    • Entertainment
    • The Escapist
    • Insider
    • Finance ₹
    • India News
    • Science
    • Health
Reading: Bullet train from Delhi to Siliguri announced, travel time to be reduced to just 6 hours: Check route | Business
Share
India Times NowIndia Times Now
Font ResizerAa
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
Search
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
    • Technology
    • Entertainment
    • The Escapist
    • Insider
    • Finance ₹
    • India News
    • Science
    • Health
Have an existing account? Sign In
Follow US

Home » Bullet train from Delhi to Siliguri announced, travel time to be reduced to just 6 hours: Check route | Business

BusinessStartup

Bullet train from Delhi to Siliguri announced, travel time to be reduced to just 6 hours: Check route | Business

Times Desk
Last updated: June 6, 2026 11:04 am
Times Desk
Published: June 6, 2026
Share
SHARE


Contents
  •  60 next-generation trains would be introduced for the Kolkata Metro
  • India first 508-km rail corridor being constructed between Sabarmati and Mumbai 
New Delhi:

Here comes a piece of good news for passengers waiting to travel in bullet trains. Union Railway Minister Ashwini Vaishnaw on Saturday announced a bullet train project for West Bengal, stating that the proposed corridor would connect Delhi and Siliguri via Lucknow, Varanasi and Patna. “A bullet train project will come to West Bengal. It will connect Delhi and Siliguri via Lucknow, Varanasi and Patna. The journey will take only six hours by bullet train,” Vaishnaw said.

While addressing a gathering at the state Secretariat Nabanna in Kolkata, Vaishnaw stated once the bullet train is commissioned, travel time from Siliguri to the national capital will be reduced to six hours.

He stated that the under the UPA government, the previous CM (Mamata Banerjee), who also held the post of Railway minister, the Railways used to get only Rs 4,000 crore for West Bengal. However, now under Prime Minister Narendra Modi’s leadership, West Bengal received Rs Rs 14,205 crore for the 2026-27 financial year.

 60 next-generation trains would be introduced for the Kolkata Metro

The Railway Minister further announced that 60 next-generation trains would be introduced for the Kolkata Metro in the next five years and hoped the railway projects in West Bengal would get a fresh impetus under the double-engine government.

The Railway Minister also added that West Bengal received Vande Bharat Sleeper and Amrit Bharat trains before many other states and added that more projects would be announced in the future He further added that 45 km of metro lines have been completed in Kolkata under the Modi government.

In November last year, Ashwini Vaishnaw had said that India’s first bullet train will now cover a 100 km distance between Surat and Vapi in Gujarat during its inaugural run in August 2027. Earlier, he had said that the inaugural run would happen on a 50 km stretch between Surat and Billimore.

India first 508-km rail corridor being constructed between Sabarmati and Mumbai 

The country’s first 508-km long high-speed rail corridor is being constructed between Sabarmati (Ahmedabad) and Mumbai to operate a bullet train at 320 kmph, covering the entire distance in 2 hours and 17 minutes.

Its foundation stone was laid in 2017 and the entire project was initially proposed to be ready by December 2023. However, land acquisition and other issues delayed the ambitious project.

“The bullet train, in its inaugural run, will now cover 100 km between Surat and Vapi in August 2027. Earlier, the inaugural run was planned on a 50 km stretch between Surat and Billimora within the same deadline,” Vaishnaw told reporters at the Rail Bhawan.

“The bullet train will cover the distance between Mumbai and Ahmedabad in 1 hour 58 minutes while stopping at four stations. However, if it stops at all 12 stations, the entire distance will be covered in 2 hours and 17 minutes,” he added.

While the Railway Ministry has awarded a contract to a Siemens-led consortium to install the signalling system on the corridor, industry experts say that this system might not support the Japanese Shinkansen bullet train. The ministry has also asked Bharat Earth Movers Limited to indigenously develop a high speed train capable of running up to 250 kmph.

Also Read: 

Bullet train image at Rail Bhawan only representational, clarifies Railway Board





Source link

NSE-listed this tech-enabled company wins solar project from Indian Railways – Check details
India becomes world’s 4th largest economy, here’s what it means for the common man
IT stock gains in volatile market after winning contract from Bank of Maharashtra: Details here
FMCG company approves export credit facilities from Canara Bank, HDFC Bank, check share price
Deepinder Goyal steps down as CEO of Eternal, Albinder Dhindsa to replace him
TAGGED:announcedAshwini VaishnawAshwini Vaishnaw announcementbulletbullet train projectbullet train project West BengalBusinessCheckdelhiDelhi to Siliguri bullet trainhigh speed rail corridor IndiahoursKolkata metro expansionModi government railway fundingreducedrouteSiliguriSuvendu AdhikaritimetrainTravelUnion MinisterVande Bharat trains West Bengalwest bengalWest Bengal railway development
Share This Article
Facebook Email Print
Leave a Comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Follow US

Find US on Social Medias
FacebookLike
XFollow
YoutubeSubscribe
TelegramFollow

Weekly Newsletter

Subscribe to our newsletter to get our newest articles instantly!
[mc4wp_form]
Popular News

Bihar Assembly polls: Kharge, Rahul, Priyanka among Congress’ 40-star campaigners

Times Desk
Times Desk
October 27, 2025
Farmers’ bodies plan protests from March 30 in A.P., demand MSP for crops
Nitin Nabin instructs BJP cadre in Jharkhand to gear up for 2029 Assembly election
AI wasn’t the biggest engine of U.S. economic growth in 2025
New dragonfly species discovered in Kerala, named Lyriothemis keralensis
- Advertisement -
Ad imageAd image
Global Coronavirus Cases

Confirmed

0

Death

0

More Information:Covid-19 Statistics
© INDIA TIMES NOW 2026 . All Rights Reserved.
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?