By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
India Times NowIndia Times NowIndia Times Now
Notification Show More
Font ResizerAa
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
    • Technology
    • Entertainment
    • The Escapist
    • Insider
    • Finance ₹
    • India News
    • Science
    • Health
Reading: Metro Line 4 trial run begins on a 4.4 km stretch in Thane – Check stations, and other details
Share
India Times NowIndia Times Now
Font ResizerAa
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
Search
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
    • Technology
    • Entertainment
    • The Escapist
    • Insider
    • Finance ₹
    • India News
    • Science
    • Health
Have an existing account? Sign In
Follow US

Home » Metro Line 4 trial run begins on a 4.4 km stretch in Thane – Check stations, and other details

BusinessStartup

Metro Line 4 trial run begins on a 4.4 km stretch in Thane – Check stations, and other details

India Times Now Desk
Last updated: September 23, 2025 10:15 am
India Times Now Desk
Published: September 23, 2025
Share
SHARE


Trial runs are also underway even as the Mogharpada depot for Metro Lines 4 and 4A remains under construction. The testing is being facilitated by temporary inspection pits beyond Gaimukh station.

Mumbai:

In a remarkable development related to the Mumbai Metro, trial runs on the 4.4 km-long stretch of Line 4 commenced on Monday. Metro Line 4 covers four stations, from Vijay Garden in Thane to Gaimukh. Maharashtra CM Devendra Fadnavis and Deputy Chief Minister Eknath Shinde flagged off the first train. 

Metro Line 4 

The latest development comes as part of the 32.3-km Line 4 along with the 2.8-km extension Line 4A. The total stretch runs for a distance of 35 km, covering 32 stations. The Line is set to connect Gaimukh, which falls in the eastern suburb of Thane, to Wadala in Central Mumbai. The line will ease travel for commuters travelling between Mumbai’s commercial hubs, eastern suburbs, and Thane.

CM Devendra Fadnavis stressed how the new metro line will cut the travel time, adding, “Once fully operational and connected to Line 11 (Wadala–CSMT), the corridor will stretch 58 km, becoming India’s longest elevated metro line, expected to carry over 21 lakh passengers daily.” 

Fadnavis added, “Maximum work will be completed by next year’s end. The Rs 16,000-crore project will run eight-coach trains, with a 45-hectare depot under construction at Mogharpada to serve Metro Lines 4, 4A, 10, and 11. Temporary arrangements near Gaimukh have been made for trial operations.” 

Notably, Deputy CM Eknath Shinde, who is also the MMRDA chairman, referred to the development as ‘historic,’ saying, “With all metro phases operational by the end of next year, residents will have seamless connectivity to Mumbai, the eastern and western suburbs, and other planned metro corridors.” 

More Trail Runs Underway 

Moreover, trial runs are also underway even as the Mogharpada depot for Metro Lines 4 and 4A remains under construction. The testing is being facilitated by temporary inspection pits beyond Gaimukh station.

After its integration with Metro Line 11, the corridor will create a seamless 58-km elevated stretch, linking Thane with Mumbai’s eastern suburbs and the main city.





Source link

BSE smallcap to be in focus as company wins NHAI projects in Tamil Nadu, Maharashtra
‘Solopreneur’ business model is booming in America
Market Opening Bell: Sensex drops 119 points, Nifty flat amid renewed geopolitical tensions
Shares of FMCG company with market cap of Rs 15,953 crore hits upper circuit as Sensex surges 400 points
PM Kisan 22nd Instalment: PM Modi to release Rs 2,000 on this date, check full details here
TAGGED:beginsCheckDeputy CM Eknath ShindedetailsLineMaharashtra CM Devendra FadnavisMetromumbai metrorunstationsstretchThanetrial
Share This Article
Facebook Email Print
Leave a Comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Follow US

Find US on Social Medias
FacebookLike
XFollow
YoutubeSubscribe
TelegramFollow

Weekly Newsletter

Subscribe to our newsletter to get our newest articles instantly!
[mc4wp_form]
Popular News

BJP forms panel to draft manifesto for 2026 election

India Times Now Desk
India Times Now Desk
January 18, 2026
Owaisi advocates for design excellence centre in Hyderabad constituency
Jagan promises greater role for party cadre when YSRCP comes to power in A.P.
Hyderabad Metro Rail take over and expansion talks in Delhi yield positive outcome; SBICAPS to act as consultant
Panel formed to probe HIV infection case in Madhya Pradesh
- Advertisement -
Ad imageAd image
Global Coronavirus Cases

Confirmed

0

Death

0

More Information:Covid-19 Statistics
© INDIA TIMES NOW 2026 . All Rights Reserved.
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?