By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
India Times NowIndia Times NowIndia Times Now
Notification Show More
Font ResizerAa
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
    • Technology
    • Entertainment
    • The Escapist
    • Insider
    • Finance ₹
    • India News
    • Science
    • Health
Reading: Lucknow Metro Phase 2 to have 7 underground stations, work to begin soon
Share
India Times NowIndia Times Now
Font ResizerAa
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
Search
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
    • Technology
    • Entertainment
    • The Escapist
    • Insider
    • Finance ₹
    • India News
    • Science
    • Health
Have an existing account? Sign In
Follow US

Home » Lucknow Metro Phase 2 to have 7 underground stations, work to begin soon

BusinessStartup

Lucknow Metro Phase 2 to have 7 underground stations, work to begin soon

India Times Now Desk
Last updated: September 22, 2025 11:52 am
India Times Now Desk
Published: September 22, 2025
Share
SHARE


In the next five years, old Lucknow is likely to undergo an infrastructural transformation with twelve proposed metro stations on the Charbagh to Basant Kunj route.

Lucknow:

Preparations for the rollout of the Metro Phase 2 in Uttar Pradesh’s Lucknow have intensified. With the work on the metro slated to begin in January or February 2026, the Uttar Pradesh Metro Rail Corporation (UPMRC) has stressed that the second phase presents more challenges than the first, and thus, a special strategy is being developed. Further, dense population in the area, along with heavy traffic movement, are likely to make the development of the next metro line more challenging. 

Lucknow To Witness Infrastructural Transformation

In the next five years, old Lucknow is likely to undergo an infrastructural transformation with twelve proposed metro stations on the Charbagh to Basant Kunj route. For this process, the soil testing process, along with aerial surveys, has already been completed. Additionally, a blueprint has been prepared to address the challenges that may arise during the construction of underground and elevated metro stations. A security strategy is also being developed during the route.

The proposed East-West Corridor route, running from Charbagh to Basant Kunj, has a total length of 11.165 kilometres. This elevated section will stretch for a distance of 4.286 kilometres, while an underground section will account for 6.879 kilometres. 

7 Underground, 5 Elevated Stations

The corridor will have a total of 12 stations, including seven underground and five elevated stations. The total estimated cost is Rs 5,801 crore. This corridor will connect to the Charbagh Metro Station on the existing North-South Corridor of the Lucknow Metro.

These are the stations of Phase-2: 

  1. Charbagh (Underground) 
  2. Gautam Buddha Nagar (Underground) 
  3. Aminabad (Underground) 
  4. Pandeyganj (Underground) 
  5. City Railway Station (Underground) 
  6. Medical Chauraha (Underground) 
  7. Chowk (Underground) 
  8. Thakurganj (Elevated) 
  9. Balaganj (Elevated) 
  10. Sarfarazganj (Elevated) 
  11. Musa Bagh (Elevated) 
  12. Basant Kunj (Elevated) 

In Old Lucknow, the current status of public transportation is not promising, as the Lucknow City Transport Services Limited operates approximately 140 city buses, and the demand is for almost 1000 buses. Notably, the city has 30 city bus routes, but only 18 are currently operational. This creates further difficulties for commuters. However, under a contract, plans are underway to operate 100 buses on 10 routes across the city, but this will take time.





Source link

Residential sales rise 8% YoY in Q1 2026 as buyers prioritise quality, experience and enduring value | Business
Titan stock jumps over 3.6% as Tata Group’s company reports 40% revenue growth for 3rd straight quarter
RBI MPC LIVE Updates: Reserve Bank Governor Sanjay Malhotra to announce decision on repo rate | Business
Gold, silver remain volatile on MCX, know key levels | Check city-wise rates
IPO GMP: Check latest grey market premium of Aequs, Vidya Wires and Meesho IPOs
TAGGED:Basant Kunj metro stationCharbagh metro stationLucknowLucknow Metro Phase 2MetroPhasestationsundergroundUPMRCUttar Pradesh Metro Rail Corporationwork
Share This Article
Facebook Email Print
Leave a Comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Follow US

Find US on Social Medias
FacebookLike
XFollow
YoutubeSubscribe
TelegramFollow

Weekly Newsletter

Subscribe to our newsletter to get our newest articles instantly!
[mc4wp_form]
Popular News
EntertainmentMovieMusic

After Satluj’s brief OTT run, Honey Trehan urge fans not to raise funds to recover losses

India Times Now Desk
India Times Now Desk
August 7, 2026
Reliance remains mum even as Trump announces ‘historic’ $300 billion U.S. refinery deal
RDJ’s Birthday Special: When Robert Downey Jr flipped the MCU script with Avengers Doomsday
Gig workers feel the pinch as gas prices rise
ED chargesheets 18 accused in 2019 Attari heroin seizure case
- Advertisement -
Ad imageAd image
Global Coronavirus Cases

Confirmed

0

Death

0

More Information:Covid-19 Statistics
© INDIA TIMES NOW 2026 . All Rights Reserved.
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?