By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
India Times NowIndia Times NowIndia Times Now
Notification Show More
Font ResizerAa
  • India News
    India News
    Politics is the art of looking for trouble, finding it everywhere, diagnosing it incorrectly and applying the wrong remedies.
    Show More
    Top News
    The States Braces for Protests Over New COVID Rules
    August 29, 2021
    A.P. Chambers draws GST Council’s attention to issues that need redressal
    October 21, 2025
    ‘Overdose of digital content consumption affecting students’
    September 29, 2025
    Latest News
    Caught in a limbo: Will these Bengaluru flyovers be thrown open to public at least in 2026?
    December 15, 2025
    Cold wave alert for four Telangana districts on December 15
    December 14, 2025
    Maternity leave turns costly for PG doctors; doctors’ body seeks waiver of rejoining fee
    December 14, 2025
    RJD MP Sudhakar Singh writes to Bihar CM to set up hydroelectric projects in the Kaimur Hills
    December 14, 2025
  • Technology
    TechnologyShow More
    Strengthening the Team: Thryve PR Onboards Pranjal Patil as PR Executive & Project Manager
    October 1, 2025
    How to Take the Perfect Instagram Selfie: Dos & Don’ts
    October 1, 2021
    Apple iMac M1 Review: the All-In-One for Almost Everyone
    Hands-On With the iPhone 13, Pro, Max, and Mini
    September 4, 2021
    Apple VS Samsung– Can a Good Smartwatch Save Your Life?
    August 30, 2021
  • Posts
    • Post Layouts
      • Standard 1
      • Standard 2
      • Standard 3
      • Standard 4
      • Standard 5
      • Standard 6
      • Standard 7
      • Standard 8
      • No Featured
    • Gallery Layouts
      • Layout 1
      • Layout 2
      • layout 3
    • Video Layouts
      • Layout 1
      • Layout 2
      • Layout 3
      • Layout 4
    • Audio Layouts
      • Layout 1
      • Layout 2
      • Layout 3
      • Layout 4
    • Post Sidebar
      • Right Sidebar
      • Left Sidebar
      • No Sidebar
    • Review
      • Stars
      • Scores
      • User Rating
    • Content Features
      • Inline Mailchimp
      • Highlight Shares
      • Print Post
      • Inline Related
      • Source/Via Tag
      • Reading Indicator
      • Content Size Resizer
    • Break Page Selection
    • Table of Contents
      • Full Width
      • Left Side
    • Reaction Post
  • Pages
    • Blog Index
    • Contact US
    • Search Page
    • 404 Page
    • Customize Interests
    • My Bookmarks
  • Join Us
Reading: Lucknow Metro Phase 2 to have 7 underground stations, work to begin soon
Share
Font ResizerAa
India Times NowIndia Times Now
  • Finance ₹
  • India News
  • The Escapist
  • Entertainment
  • Science
  • Technology
  • Insider
Search
  • Home
    • India Times Now
    • Home 2
    • Home 3
    • Home 4
    • Home 5
  • Categories
    • Technology
    • Entertainment
    • The Escapist
    • Insider
    • Finance ₹
    • India News
    • Science
    • Health
  • Bookmarks
    • Customize Interests
    • My Bookmarks
  • More Foxiz
    • Blog Index
    • Sitemap
Have an existing account? Sign In
Follow US
Home » Blog » Lucknow Metro Phase 2 to have 7 underground stations, work to begin soon
BusinessStartup

Lucknow Metro Phase 2 to have 7 underground stations, work to begin soon

Times Desk
Last updated: September 22, 2025 11:52 am
Times Desk
Published: September 22, 2025
Share
SHARE


In the next five years, old Lucknow is likely to undergo an infrastructural transformation with twelve proposed metro stations on the Charbagh to Basant Kunj route.

Lucknow:

Preparations for the rollout of the Metro Phase 2 in Uttar Pradesh’s Lucknow have intensified. With the work on the metro slated to begin in January or February 2026, the Uttar Pradesh Metro Rail Corporation (UPMRC) has stressed that the second phase presents more challenges than the first, and thus, a special strategy is being developed. Further, dense population in the area, along with heavy traffic movement, are likely to make the development of the next metro line more challenging. 

Lucknow To Witness Infrastructural Transformation

In the next five years, old Lucknow is likely to undergo an infrastructural transformation with twelve proposed metro stations on the Charbagh to Basant Kunj route. For this process, the soil testing process, along with aerial surveys, has already been completed. Additionally, a blueprint has been prepared to address the challenges that may arise during the construction of underground and elevated metro stations. A security strategy is also being developed during the route.

The proposed East-West Corridor route, running from Charbagh to Basant Kunj, has a total length of 11.165 kilometres. This elevated section will stretch for a distance of 4.286 kilometres, while an underground section will account for 6.879 kilometres. 

7 Underground, 5 Elevated Stations

The corridor will have a total of 12 stations, including seven underground and five elevated stations. The total estimated cost is Rs 5,801 crore. This corridor will connect to the Charbagh Metro Station on the existing North-South Corridor of the Lucknow Metro.

These are the stations of Phase-2: 

  1. Charbagh (Underground) 
  2. Gautam Buddha Nagar (Underground) 
  3. Aminabad (Underground) 
  4. Pandeyganj (Underground) 
  5. City Railway Station (Underground) 
  6. Medical Chauraha (Underground) 
  7. Chowk (Underground) 
  8. Thakurganj (Elevated) 
  9. Balaganj (Elevated) 
  10. Sarfarazganj (Elevated) 
  11. Musa Bagh (Elevated) 
  12. Basant Kunj (Elevated) 

In Old Lucknow, the current status of public transportation is not promising, as the Lucknow City Transport Services Limited operates approximately 140 city buses, and the demand is for almost 1000 buses. Notably, the city has 30 city bus routes, but only 18 are currently operational. This creates further difficulties for commuters. However, under a contract, plans are underway to operate 100 buses on 10 routes across the city, but this will take time.





Source link

Tata Motors Demerger Record Date: Listing timelines and all other details you need to know
Cabinet approves 3% DA hike for central govt employees, pensioners: What this means for your wallet
Market Opening Bell: Sensex drops 316 points, Nifty above 26,050, Asian Paints among top gainers
Groww Share Price: Billionbrains shares gain 11% ahead of first quarterly results post IPO listing
This infra company plans to expand authorised capital – Check share price and other details
TAGGED:Basant Kunj metro stationCharbagh metro stationLucknowLucknow Metro Phase 2MetroPhasestationsundergroundUPMRCUttar Pradesh Metro Rail Corporationwork
Share This Article
Facebook Email Print
Leave a Comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Follow US

Find US on Social Medias
FacebookLike
XFollow
YoutubeSubscribe
TelegramFollow

Weekly Newsletter

Subscribe to our newsletter to get our newest articles instantly!
[mc4wp_form]
Popular News

After death of two basketball players, Haryana CM orders review of sports complexes

Times Desk
Times Desk
November 27, 2025
Achieving Centre’s rooftop solar targets to remain a challenge: study
Telangana CM Revanth Reddy calls on Sringeri Jagadguru Sri Vidhushekhara Bharati Swamiji
INCOIS to set up ‘shore stations’ for better ocean monitoring
Vinales will be as tough for Rossi as Lorenzo – Suzuki MotoGP boss
- Advertisement -
Ad imageAd image
Global Coronavirus Cases

Confirmed

0

Death

0

More Information:Covid-19 Statistics
© INDIA TIMES NOW 2025 . All Rights Reserved.
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?