By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
India Times NowIndia Times NowIndia Times Now
Notification Show More
Font ResizerAa
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
    • Technology
    • Entertainment
    • The Escapist
    • Insider
    • Finance ₹
    • India News
    • Science
    • Health
Reading: Malankara dam shutters opened for major repair works
Share
India Times NowIndia Times Now
Font ResizerAa
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
Search
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
    • Technology
    • Entertainment
    • The Escapist
    • Insider
    • Finance ₹
    • India News
    • Science
    • Health
Have an existing account? Sign In
Follow US

Home » Malankara dam shutters opened for major repair works

India News

Malankara dam shutters opened for major repair works

Times Desk
Last updated: May 20, 2026 5:31 pm
Times Desk
Published: May 20, 2026
Share
SHARE


The shutters of Malankara dam in Idukki were opened for major repair works on Wednesday.

The shutters of Malankara dam in Idukki were opened for major repair works on Wednesday.
| Photo Credit: H. VIBHU

The shutters of the Malankara dam, under the Muvattupuzha Valley Irrigation Project (MVIP), have been opened to facilitate major repair work.

According to an MVIP official, the dam’s water level must be lowered to 36.9 m for the maintenance to begin. To achieve this, water distribution through the project’s canal networks was suspended on Wednesday, and four spillway shutters were fully raised. The water level has currently dropped to 40 m.

“The repair work will commence once the reservoir hits the 36.9-m mark. The maintenance is estimated to take about two weeks, though it could be completed slightly ahead of or after the scheduled time frame,” an official said.

The maintenance works include replacing the shutter screws and installing new rubber seals. “Our objective is to complete these major structural repairs before the arrival of heavy monsoon rain,” the official added.

The Malankara dam primarily stores tailrace water released into the Muvattupuzha river from the Moolamattom powerhouse after electricity generation at the Idukki reservoir. With the Malankara shutters wide open, this water can no longer be impounded and will flow directly downstream into the Muvattupuzha river. Officials noted that the drawdown and subsequent discharge are also likely to temporarily hit power generation at the Malankara small hydroelectric project.

Published – May 20, 2026 08:06 pm IST



Source link

SWR achieves gross revenue of ₹6,939 crore in first three quarters
Two simple tests can detect kidney ailment early, say experts
Complete ‘Vellum Tamil Pengal’ door-to-door campaign by March 8: Stalin urges party cadre
Man held for stealing gold rings from Kukatpally jewellery stores using deception
Why the BJP struggles in Tamil Nadu
Share This Article
Facebook Email Print
Leave a Comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Follow US

Find US on Social Medias
FacebookLike
XFollow
YoutubeSubscribe
TelegramFollow

Weekly Newsletter

Subscribe to our newsletter to get our newest articles instantly!
[mc4wp_form]
Popular News

Durgapur gang rape case: Bengal has second-lowest conviction rate for crimes against women

Times Desk
Times Desk
October 17, 2025
125-foot statue of Raja Raja Chola to adorn Grand Chola Museum in Thanjavur
Zubeen Garg death case: Three more Assamese expats from Singapore arrive in Guwahati for probe
Fintech firm Mercury hits $5.2 billion valuation after funding round
Jabalpur cruise boat tragedy: Search operations expanded to trace four missing passengers
- Advertisement -
Ad imageAd image
Global Coronavirus Cases

Confirmed

0

Death

0

More Information:Covid-19 Statistics
© INDIA TIMES NOW 2026 . All Rights Reserved.
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?