By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
India Times NowIndia Times NowIndia Times Now
Notification Show More
Font ResizerAa
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
    • Technology
    • Entertainment
    • The Escapist
    • Insider
    • Finance ₹
    • India News
    • Science
    • Health
Reading: Telangana: Successful trial run on 13 km track connecting Kazipet coach manufacturing unit with main rail network
Share
India Times NowIndia Times Now
Font ResizerAa
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
Search
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
    • Technology
    • Entertainment
    • The Escapist
    • Insider
    • Finance ₹
    • India News
    • Science
    • Health
Have an existing account? Sign In
Follow US

Home » Telangana: Successful trial run on 13 km track connecting Kazipet coach manufacturing unit with main rail network

India News

Telangana: Successful trial run on 13 km track connecting Kazipet coach manufacturing unit with main rail network

India Times Now Desk
Last updated: February 24, 2026 8:02 am
India Times Now Desk
Published: February 24, 2026
Share
SHARE


Contents
  • Kazipet RMU-railway network track completion
  • Machinery and plant installations completed
The 13.15 km track between railway manufacturing unit in Kazipet and main rail network was completed.

The 13.15 km track between railway manufacturing unit in Kazipet and main rail network was completed.
| Photo Credit: Handle @RailVikas on X

Rail Vikas Nigam Limited, which is developing a railway manufacturing unit in 160 acres of area at Kazipet in Telangana, recently completed a successful diesel train trial run on a 13.15 km track to connect the factory to the Indian Railway network.

Officials said that the track was laid between the factory and the Kazipet Railway Station so that manufactured coaches can be brought to the station and then delivered to various railway zones and divisions.

Kazipet RMU-railway network track completion

“The trial run marks the completion of track connectivity between the RMU (Rail Manufacturing Unit) complex and the main railway network, formally integrating the facility with the operational system of Indian Railways and signalling the project’s transition from construction to operational readiness ahead of commissioning in March,” a press note from RVNL said.

A trial run with a diesel train trial was successfully conducted on the 13.15 km track connecting Kazipet Railway Manufacturing Unit with main rail network

A trial run with a diesel train trial was successfully conducted on the 13.15 km track connecting Kazipet Railway Manufacturing Unit with main rail network
| Photo Credit:
Handle @RailVikas on X

It added, “The Railway Manufacturing Unit at Kazipet is being developed as a major rolling stock manufacturing and industrial facility to augment the production capacity of Indian Railways. Spread across 160 acres, the project is being executed by RVNL as the Project Implementation Agency.”

Officials said that strategically located at Kazipet, a major junction under South Central Railway on the vital Balharshah–Secunderabad trunk route forming part of the larger Delhi–Chennai corridor, the RMU offers seamless north–south and east–west connectivity, enabling efficient dispatch of finished rolling stock across the country and strengthening the national rolling stock manufacturing ecosystem.

Machinery and plant installations completed

Saleem Ahmad, Chairman & Managing Director, RVNL, said, “The successful trial run and integration of the Railway Manufacturing Unit at Kazipet with the main railway network marks a defining milestone in the execution of this project and will strengthen India’s railway manufacturing infrastructure.” The press note said that machinery and plant installations in the main shop, paint shop and test shop have been completed and are slated for commissioning by March 2026.

Rail Vikas Nigam Limited conducted a successful trial run on the track connecting Kazipet Railway Manufacturing Unit with main rail network

Rail Vikas Nigam Limited conducted a successful trial run on the track connecting Kazipet Railway Manufacturing Unit with main rail network
| Photo Credit:
Handle @RailVikas on X

“The RMU has also been designed as a green-rated industrial complex incorporating a 2 MWp rooftop solar plant with grid export capability, four rainwater harvesting ponds of 20 lakh litres each, energy-efficient LED lighting and a modern sewage treatment plant. The use of PEB structures supports faster construction, optimal daylight utilisation, lower maintenance and reduced energy consumption, reinforcing sustainable industrial development at Kazipet,” it added.

Published – February 24, 2026 01:01 pm IST



Source link

Kannur ADM Naveen Babu death: Kerala court orders further probe
Irrigation dept. to restart dredging in Korapuzha
BJP spreading its net wide looking for new slaves, says Udhayanidhi Stalin
Ahead of budget, Kerala CM V.D. Satheesan seeks support of banking sector for flagship programmes
Kerala Budget 2026-27: A statement of fiscal resilience in a volatile federal framework
TAGGED:India newsindian railwaysKazipet rail coach factoryKazipet railway manufacturing unitrailway manufacturing unit in Telangana
Share This Article
Facebook Email Print
Leave a Comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Follow US

Find US on Social Medias
FacebookLike
XFollow
YoutubeSubscribe
TelegramFollow

Weekly Newsletter

Subscribe to our newsletter to get our newest articles instantly!
[mc4wp_form]
Popular News
EntertainmentMovieMusic

Subhash Ghai reviews rough cut of Salman Khan’s Maatrubhumi: ‘So beautiful…’ | Entertainment

India Times Now Desk
India Times Now Desk
May 29, 2026
Wall Street braced for a private credit meltdown. The risk is rising
Kejriwal slams Centre over Sonam Wangchuk’s hospitalisation, calls it ‘arrogance’
Third-semester exam results of plus-two level declared in Bengal, 93.72% qualify
Karnataka Budget 2026-27 LIVE updates: CM Siddaramaiah to present his 17th Budget
- Advertisement -
Ad imageAd image
Global Coronavirus Cases

Confirmed

0

Death

0

More Information:Covid-19 Statistics
© INDIA TIMES NOW 2026 . All Rights Reserved.
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?