By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
India Times NowIndia Times NowIndia Times Now
Notification Show More
Font ResizerAa
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
    • Technology
    • Entertainment
    • The Escapist
    • Insider
    • Finance ₹
    • India News
    • Science
    • Health
Reading: AMNSIL steel plant in A.P. lines up a portfolio of six products
Share
India Times NowIndia Times Now
Font ResizerAa
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
Search
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
    • Technology
    • Entertainment
    • The Escapist
    • Insider
    • Finance ₹
    • India News
    • Science
    • Health
Have an existing account? Sign In
Follow US

Home » AMNSIL steel plant in A.P. lines up a portfolio of six products

India News

AMNSIL steel plant in A.P. lines up a portfolio of six products

India Times Now Desk
Last updated: November 30, 2025 9:49 am
India Times Now Desk
Published: November 30, 2025
Share
SHARE


The greenfield Integrated Steel Plant (ISP) being set up by ArcelorMittal Nippon Steel India Limited (AMNSIL) in Anakapalli district has lined up a portfolio of six finished saleable products, 70% of which are hot rolled coils that account for 5.8 MTPA out of 8.2 MTPA capacity planned in Phase-I.

AMNSIL’s proposal is to establish a 17.8 MTPA ISP in two phases, the first one of which with an estimated capital cost of ₹67,345 crore is in its initial stages, according to official sources.

As per the ISP’s executive summary prepared by a Secunderabad-based environmental consulting firm, the 2,200-acre steel plant site is spread across five villages namely D.L. Puram, Butchirajupeta, Vempadu, Chandanada and Rajayyapeta in Nakkapalli Mandal. 

This industrial area falls in the East Coast Economic Corridor that stretches from Tuticorin to Kolkata.  The ISP requires approximately 135 MLD of water for main plant applications and domestic needs and the plan is to draw a bulk of it from the Polavaram Left Main Canal by laying an underground pipeline and source the balance from iron slurry water received at the site and treated wastewater within the facility.

As far as power is concerned, the total requirement is pegged at 867 MW, of which approximately 227 MW will be met through captive generation and the remaining 640 MW sourced from the grid. The company is getting the 244 km-long iron ore slurry pipeline, that originates at the NMDC’s Bailadila mines in Chhattisgarh and currently catering to its pellet plant, diverted near Peddapeta village, and a cadastral survey done for right of way for the balance 54 km up to the main plant site at Rajayyapeta.

Besides, AMNSIL has formulated an environmental management plan of ₹3,540 crore with annual recurring cost of ₹355 crore.  The ISP will have a blast furnace and a basic oxygen furnace (BoF) which are said to be proved as more productive and compatible with large volume integrated steel-making than electric arc furnace (EAF) or con-arc furnace (a combination of BoF and EAF) technologies. 

AMNSIL had initially considered setting up the ISP at three locations including Nakkapalli, Mulapeta in Srikakulam and  Vodarevu in Bapatla district being the other two but chose the first due to its  proximity to Visakhapatnam industrial hub, superior logistical connectivity and on the basis of other parameters.

Published – November 30, 2025 03:19 pm IST



Source link

T. N. braces for intense contest as Dravidian giants face new disruptor
Free and ethical press plays a crucial role in democracy, says A.P. CM
Man held on charge of sexual abuse
Vijayapura: The Hindu EducationPlus Career Counselling 2026 turns into eye-opening session
PMK’s administrative committee authorises Ramadoss to decide on alliance
TAGGED:AnakapalliAndhra PradeshSteel plant
Share This Article
Facebook Email Print
Leave a Comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Follow US

Find US on Social Medias
FacebookLike
XFollow
YoutubeSubscribe
TelegramFollow

Weekly Newsletter

Subscribe to our newsletter to get our newest articles instantly!
[mc4wp_form]
Popular News
BusinessStartup

156% return in 1 year: Shares of KMEW gain over 5% post this update, check details here

India Times Now Desk
India Times Now Desk
April 8, 2026
NDA delegation to look into Karur stampede tragedy
Ever wonder why others eat more but still lose weight? Expert explains
Union Cabinet approves change of name of Kerala to Keralam
Jana Sena Party picks Lingamaneni Ramesh as its Rajya Sabha candidate
- Advertisement -
Ad imageAd image
Global Coronavirus Cases

Confirmed

0

Death

0

More Information:Covid-19 Statistics
© INDIA TIMES NOW 2026 . All Rights Reserved.
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?