By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
India Times NowIndia Times NowIndia Times Now
Notification Show More
Font ResizerAa
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
    • Technology
    • Entertainment
    • The Escapist
    • Insider
    • Finance ₹
    • India News
    • Science
    • Health
Reading: Eight years on, Hyderabad Metro Rail faces growing pains
Share
India Times NowIndia Times Now
Font ResizerAa
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
Search
  • Bharat Shreshtha Ratna Sanman
  • India News
  • Categories
    • Technology
    • Entertainment
    • The Escapist
    • Insider
    • Finance ₹
    • India News
    • Science
    • Health
Have an existing account? Sign In
Follow US

Home » Eight years on, Hyderabad Metro Rail faces growing pains

India News

Eight years on, Hyderabad Metro Rail faces growing pains

India Times Now Desk
Last updated: November 27, 2025 3:11 pm
India Times Now Desk
Published: November 27, 2025
Share
SHARE


Hyderabad Metro Rail phase one which has completed eight years runs across three traffic corridors in twin cities.

Hyderabad Metro Rail phase one which has completed eight years runs across three traffic corridors in twin cities.
| Photo Credit: NAGARA GOPAL

Hyderabad Metro Rail (HMR) Phase One marks eight years of redefining urban travel in the twin cities tomorrow. Yet, the three-corridor network that once promised seamless connectivity now struggles with overcrowded trains, neglected infrastructure, and no immediate relief in sight.

With Phase Two still stuck in approvals and new rolling stock nowhere on the horizon, the city’s lifeline is straining under the weight of its own success — leaving commuters to wonder how much longer they can cope. It is evident that it will take at least five years or more for the next metro lines to become operational. This is contingent on the Centre sanctioning the proposed Phase 2A section — five corridors covering 76.4 km at an estimated cost of ₹24,269 crore — early next year, as recently assured by Union Minister for Housing and Urban Affairs Manohar Khattar.

“First, the government must complete the acquisition process from L&T Metro Rail Hyderabad (L&TMRH), which could take six months to a year. The process hasn’t even begun. After the Centre and State sign a joint venture agreement for the second phase on a 50:50 partnership basis, funding from multilateral agencies will be sought, followed by tenders for the works,” said top sources, requesting anonymity.

This delay will directly impact existing services on the Red Line (LB Nagar–Miyapur, 29 km), Blue Line (Nagole–Raidurg, 29 km), and Green Line (JBS–MGBS, 11 km), as the expected addition of new train sets is not happening. L&TMRH appears to have shelved plans to purchase 10 three-coach train sets after deciding to hand over the project to the Telangana government for ₹15,000 crore.

“New train sets are likely only after Phase Two works begin or are finalised next year, when the government may sign the contract for rolling stock. It could take up to 15–18 months for these trains to become operational,” said senior officials.

Although L&TMRH installed barriers at Ameerpet interchange station to ease crowding near coach gates, rush-hour congestion—9 a.m. to 11 a.m. and 5 p.m. to 8:30 p.m.—remains a major issue.

HMR currently carries an average of 4.75 lakh passengers daily in 1,075 trips using 57 three-coach train sets, with a frequency of 2.5–5 minutes during peak hours and 7–10 minutes during non-peak hours, maintaining punctuality at 99.86%. Even with two-minute intervals on the Blue Line, trains are packed, forcing many commuters back to road transport.

“Passengers are already being stopped from entering platforms or stations during peak hours at certain stations like Raidurg, Hi-Tec City, and Ameerpet,” admitted a senior official. With more trains deployed on the Blue and Red corridors due to high demand, the Green Line continues to see low footfall—about 25,000 daily. Its frequency ranges from 8 to 20 minutes despite passing through densely populated areas.

If last mile connectivity continues to be a problem area, the infrastructure under metro stations—street furniture, footpaths, and other amenities—shows signs of neglect. Many areas have turned into garbage dumps, open toilets, and shelters for beggars, alcoholics, and drug addicts, with broken tiles and dim lighting compounding the problem. That neither HMR nor L&TMRH have announced any plans to celebrate the anniversary lays bare the sad state of affairs.

Published – November 27, 2025 08:41 pm IST



Source link

Hibi to send letter to Health Minister demanding handover of Corporation building to Ernakulam GH
What triggered the chaos at Karur
Kerala actor assault case: HC admits survivor’s plea, orders safe custody of memory card, pen drive
Jharkhand Minister offers job, flat to Bihar doctor after hijab row
Decathlon opens multi-sport ecosystem at Whitefield in Bengaluru
TAGGED:Hyderabad Metro Rail (HMR) Phase OneL&T Metro Rail Hyderabad (L&TMRH)Manohar Khattar.urban travel in the twin cities
Share This Article
Facebook Email Print
Leave a Comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Follow US

Find US on Social Medias
FacebookLike
XFollow
YoutubeSubscribe
TelegramFollow

Weekly Newsletter

Subscribe to our newsletter to get our newest articles instantly!
[mc4wp_form]
Popular News

‘I love Muhammad’ row: Tensions escalate in Barabanki, Mau districts after Bareilly clashes; forces deployed

India Times Now Desk
India Times Now Desk
September 27, 2025
Woman attacked in court in Karnataka
Chhattisgarh IPS officer suspended following harassment allegations
Prepare contingency plan for sowing amid delayed monsoon: Official
Chairman and Managing Trustee of Siruthuli call on CM Vijay
- Advertisement -
Ad imageAd image
Global Coronavirus Cases

Confirmed

0

Death

0

More Information:Covid-19 Statistics
© INDIA TIMES NOW 2026 . All Rights Reserved.
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?